Basic Sound System Designing Jess Role RPLB 378 Mission College.

Slides:



Advertisements
Similar presentations
ARRANGEMENTS Session Objectives:
Advertisements

Step 1 – Assess… Consult… Evaluate Assess Individual assessments of your Access Technology needs Workplace assessments & employer consultations Disability.
Streetcar Production – Final Phase Transportation and Trinity River Project Committee 14 April 2014.
© Fujitsu Limited, 2010 Fixed Asset and Prepaid iProcurement Training.
SCS Inventory Database Dustin Bowman Christ Burnette Ben Cassell Jeremiah Griswold.
Chapter 3: Planning a Network Upgrade
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Use of Modern Technology to Communicate Truths Use of Modern Technology to Communicate Truths J& E Role Technology http//
Design a Room Project. Design a Room You will need – 1 cm Graph Paper to draw your map – Graph paper to complete your calculations. Keep it neat and organized!
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
Office Equipment and Furniture
810 Mission Avenue 3 rd Floor Refurbishment October 17, 2013 Related to Agenda Item 14.
By Jesse Role, Ph. D. TM - Electronics
Pathways Home. Module 7 Meeting Your Financial Obligations.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.

UFCEXR-20-1Multimedia Sound Production Studio Equipment and Layout.
Building Your Own Home Studio. Recording Devices.
Theme: Multimedia Sound ProductionUFCFY Studio Equipment for Multimedia Sound Production.
Grant Management UK Property Investment A carbon neutral company.
Smart surfaces | clever ideas Great Support At Bushboard we’re passionate about everything we do and we’re always here to help. We invest heavily in the.
CPS ® and CAP ® Examination Review OFFICE SYTEMS AND TECHNOLOGY, Fifth Edition By Schroeder and Graf ©2005 Pearson Education, Inc. Pearson Prentice Hall.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Managing Medical Devices Catriona Blake Team Manager: Imaging, acute and community care.
1 ISE Differences between office and factory layout Product  Offices process information  Factories produce things Physical environment  Offices.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
14s-1Maintenance William J. Stevenson Operations Management 8 th edition.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
When the Mission is Critical console furniture and accessories for 24/7 mission critical environments.
Grant Management UK Property Investment. About us Founded people in 12 cities ARLA members Investors in people HBOS now own 20% Plc standards.
1 SAN DIEGO COUNTY WATER AUTHORITY PIPELINE RELINING PROGRAM Keeping the Water Flowing.
TEST NETWORK TRANSPORT,ENVIRONMENT SCIENCE AND TECHNOLOGY CAPACITY CHALLENGES FOR THE AFRICAN PARTNERS.
Colin LaiComputer Service Center1 Computer Hardware & Software Purchase & Services Speaker: Colin Lai.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Funding.
Copyright 2004 © Pearson Education Canada Inc Chapter 15 Designing and Managing Services.
Introduction to Purchasing – Back to Basics Florence Gregg, figpc ltd E: M:
July June 2014 Presented by Leah Howard & Ryan White Upper Dublin School District Educational Technology Plan.
Sustainable Procurement - Taking your first steps 2 nd October 2007 University of Reading.
1 SMALL BUSINESS MANAGEMENT Chapter Five Buying a Business.
BUDGET OFFICE AUGUST 6, EXPENDITURE RECOMMENDATIONS.
Who can I call for questions? Peter Turnquist, Can I sell a ServicePac after the product sale? Yes, any time during the warranty for upgrades.
GVC3200 Video Conferencing System. Conference Room Setup Prepare below equipment before setup: Display Device (e.g., HDTV), with power adapters GVC3200,
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
EMS Fenceline Factors that will define the scope of each NAA location’s EMS –Physical size of your location –Research mission of your facility –Self-supporting.
FundingFunding. Funding Objectives To understand the importance to be given to the preparation of appropriate budget in order to implement and operate.
Objective Explain major factors to consider in planning new construction or repair work.
This is Not a Book About …. Author: Illustrator: Class: Date:
Panasonic Service Program April 1, Panasonic Service Program Objectives –Comprehensive service offering that includes on-site service contracts,
Presented to: By: Date: Federal Aviation Administration DCC OPS Floor Acoustic Noise Issues Babb June 28, 2011 Overview for Contractors.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
ENGINEERING SUPPORT FOR FINAL YEAR PROJECT STUDENTS. SCHOOL OF ENGINEERING.
We are one of the accredited manufacturers and suppliers of Accoustic Enclosure and Sound Proofing in northern part of India under brand Name of "DDSTHA".
OREGON MILITARY DEPARTMENT OFFICE OF EMERGENCY MANAGEMENT SSA – State Administrative Agency UASI REGION FISCAL TRAINING.
Load Monitoring For Fleet Vehicles Dan Hanns Anant Agarwal ECE 445 Senior Design Project.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
Connect Collaborate Innovate End to end video solutions.
How to Pass SMRP (Society of Maintenance
Total Cost of Ownership: Considerations
Awareness program on ISO/TS16949:2002
Rear Isometric View Front Isometric View
Product as a service, powered by Microsoft Dynamics 365 (ISV)
Industrial Training Provider ,
Providing Advice To Clients
Seminar on Industrial Training
Lecture6 Network Replacement
Warranty process.
Specifications What should it cover Goods Services Warranty
Topics.
Presentation transcript:

Basic Sound System Designing Jess Role RPLB 378 Mission College

Planning and Designing Church Public Address system Budget Availability Sound setup and acoustic design System specification Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design External factors –Vehicle noise –People –Industries –Other that contribute noise Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Internal factors –Room condition –Walls and furniture and flooring –Shape of the room –Audience –Speaker positioning –Operators access to the system Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Equipment purchasing –Available budget (cost) –Brand –Where to buy –Accessories –Guarantee and warranty Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Installation –Contract –Duration and target date for operation –The layout plan (wiring system) –Guarantee for workmanship

Considerations in Sound System Planning and Design Testing –Adjustments –authorized operators –Training Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Maintenance and repairs –Considering guarantee –Expansion and improvement provision –contract Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Inventory –Purchased date –Equipment name and Number –Brand –Model Number –Serial Number –Cost –Remarks Jess Role RPLB 378 Mission College

Considerations in Sound System Planning and Design Equipment Historical Record –Date last repaired –Cost –Problem –Solution to the problem –Present condition Jess Role RPLB 378 Mission College

Speaker Positioning Angular Overhead Underground pipe system Monitor Front Rear Jess Role RPLB 378 Mission College