Traffic Management System Status Update February, 2008.

Slides:



Advertisements
Similar presentations
Gainesville ATMS: A Regional Success! October 29, 2012 Matthew Weisman, PE ITS Operations Engineer - City of Gainesville, Fl 2012 Transpo – Bonita Springs.
Advertisements

Overview What is the National ITS Architecture? User Services
GROWTH MANAGEMENT 0 David Hutchinson Office of Policy Planning Department of Transportation Proportionate Fair Share Mitigation.
1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
Presented to presented by East Central Florida Corridor Task Force Space Coast TPO 02/16/15 Huiwei Shen Systems Planning Florida Department of Transportation.
Transportation’s Relation to Growth Management `.
Presented by: SAGE KAMIYA, P.E., PTOE
Ronald B. Achelpohl, PE Operation Green Light Mid-America Regional Council.
TRAFFIC ENGINEERING DIVISION
Cobb County Comprehensive Transportation Plan (CTP) Board of Commissioners Briefing January 22, 2008.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Convention Center Community Coalition 1. Time Line 2008: Feasibility Study by CS&L May 2009: Follow-Up Data April 2010: Appleton Council/Mayor Appoint.
Trichord/VDOT Public Private Partnerships Experiences and Lessons Learned May 19, 2003 Trichord, Inc James Monroe Highway Leesburg, VA (703)
GROWTH MANAGEMENT Working With Transportation Concurrency Management Systems Florida Department of Transportation Companion to the Booklet “Working with.
Sector Planning Process Alachua County Commission July 8 th,
Commuter Connections FY 2006 Work Program National Capital Region Transportation Planning Board May 18, 2005.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
ITS Emergency Management Are You Prepared? Philip R. Mann, P.E. City of Gainesville, Florida Public Works Department.
Transportation and Climate Initiative (TCI) A new initiative to reduce greenhouse gases in the transportation sector in Northeast and Mid-Atlantic states.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
“Connecting People and Places” REGIONAL MOBILITY PLAN CRTPA Board September 20, 2010.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Alachua County Mobility Plan Springhills Transportation Improvement District and Santa Fe Village Developer’s Agreement October 28, 2014.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Steve Heminger Executive Director, MTC AMPO Annual Conference Washington, D.C. – October 23, 2003 Playing in Traffic: A New Look at Management and Operations.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
ITS Architecture Development in a Regional Planning Context Central Ohio Case Study Erika Witzke Principal Engineer Mid-Ohio Regional Planning Commission.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
COUNTY COUNCIL MEETING July 29, 2015 Summit County 2015 Climate Action Plan.
Pedestrian Facility Improvement Program
Traffic Management System Real Time Motorist Information
Project Overview – Phase 1
Project Status & Right-of-Way Acquisition
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Transportation Research Board 2004 Annual Meeting
2018 Adopted Budget February Financial Plan
ITE Midwestern District Conference June 20, 2017
Presentation transcript:

Traffic Management System Status Update February, 2008

Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville Urban Area.  A Computerized Traffic Signal System was installed in  Software runs in DOS and is not Windows Compatible utilizing 1200 baud phone dial-up phone lines.  Technologically, the equipment is out of date and does not provide for upward compatibility.

Regional Impact  The City of Gainesville maintains all of the traffic signals and flashing beacons in Alachua County including the other incorporated cities and the University of Florida. This project will encompass the traffic signals in the Gainesville Urban Area as well as the entire County.  In 1997, a feasibility study was performed to determine the future needs of the County. It was determined that a Traffic Management System was needed to meet our future growth.

What is a Traffic Management System?  Conventional traffic signal systems operate traffic signals.  TMS components include operating traffic signals, traffic monitoring, real time traffic operations, emergency vehicle control, enhanced mass transit, real time motorist information and effective incident management.  Some of these features are demonstrated in the following slides:

Signal Priority Control

LED Installation

Pedestrian Traffic Signals

Traffic Signal Removal

Funding Partnerships  Local Funding Methodology:  City, County, MTPO, FDOT and University Staff worked together to develop a funding methodology for this project.  The methodology is similar in nature to FDOT’s for funding traffic signal maintenance.  The intersection is broken down by the ownership of each approach to the traffic signal.  If the county owns 2 approaches and the city owns 2, each agency pays for 50% of the improvements at that intersection.

Funding Partnerships  The University of Florida pays their fair share based upon ownership and trip generation surrounding the campus.  The University of Florida’s fair share was subtracted from the total and the “fair share” percentages applied to the whole.

Funding Commitments to Date Agency  City  County  U.F.  FDOT Fair Share  25.1% ($ 3.6 mil)  22.7% ($ 3.3 mil)  3.9% + $ 3.2 mil = ($ 3.8 mil)  50.0% ($ 9.1 mil) Committed  $ 5.0 mil  $ 2.0 mil  $ 3.8 mil  $ 9.1 mil

Funding Partnerships  Transportation Regional Improvement Plan (TRIP)  On February 1, 2007, the Regional Transportation Partners (Alachua MTPO and Marion County MPO) approved and adopted the Regional Transportation Plan  Application was made to FDOT for TRIP program funding for the maximum 50% match.  On November 29, 2007, FDOT executed the TRIP Agreement and awarded funding at the full 50% of total cost ~$9.1 million.

What Are We Doing Now?  RFQ’s for the TMS Engineering Contract were solicited. A review team consisting of City, County and FDOT staff selected VANUS Engineering from Tampa. Vanus was issued a notice to proceed on October 12,  Wireless communication RFP’s are being reviewed by GRUCom and PWD Staff.  Traffic Management Center (TMC) design- build advertising began February 14,  $ 1.4 mil P.O. issued to TMS vendor (Naztec) for phase I equipment on November 30, 2007.

Phasing Costs  Phase I  Phase II  Phase III  Phase IV  Total $ 7.5 million $ 5.8 million $ 4.1 million $ 820,000 $ 18.2 million Note: In 2006 Dollars

TMS Project Build-out

TMS – Phase I

Implementation Time Frame  From the time we begin construction until the time we complete construction will be approximately 4 years:  Phase I – 1 year;  Phase II – 1 year;  Phase III – 1 year;  Phase IV – 1 year.  The TMC will be built during Phases I & II.

Annual Operating Costs  Budget increment requests will be considered and cost share proposals will be developed for consideration in annual signal maintenance contracts to cover the annual operating costs of:  Additional Staffing to operate and properly maintain the system to ensure maximum efficiencies are realized - $ 253,000/yr.  Funding to host a real-time traveler's information website, software upgrades and licensing, ITS equipment maintenance, specialized training and periodic signal re-timings - $240,000/yr.

Potential Benefits  An effective Traffic Management System helps reduce congestion. According to a TTI Study, reducing congestion can save motorists app. 10 gallons a fuel a year. In a city our size, that related to approximately $ 1.9 Million in annual savings in fuel. This does not include the reduction in lost time while in traffic. (Based on fuel cost of $ 1.00 / gallon)  This equates to 28.5 million in fuels savings over 15 years. Other savings include:  Reduced emissions;  Reduced loss time by motorists.

Potential Benefits  Enhanced emergency response for Fire-Rescue (GFR & ACFR) through system wide traffic signal priority control. Also available to law enforcement (GPD & ACSO).  Enhanced mass transit through system wide priority control.  Real time traveler information on incidents, congestion conditions and alternate routes.  Enhanced traffic signal coordination improvements through constant system-wide real-time monitoring and timing adjustments. This will reduce congestion and delay system-wide.  System-wide re-timing of all traffic signals.

Key Points for the Future  Initial results from the traffic signal re-timing and traffic management system are not re-occurring.  Land use changes and population density shifts change motorist characteristics.  New activity centers change trip distribution on a system-wide basis.  There must be an on-going effort to continue to realize the benefits of the initial capital investment to meet the changing dynamics of the community. Must fund those annual operating costs to meet the needs.