1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Peter Speckmayer, LCWS2010, Beijing 1P. Speckmayer, LCWS2010, Beijing3/27/2010.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL CALICE Meeting at Casablanca, September 22nd.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
1 ILD Workshop 12/9/08David Ward What have we learnt so far from CALICE? David Ward University of Cambridge  Overview of the CALICE program and prototypes.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
CALICE Report Nigel Watson (Birmingham Univ.) Motivation Test beam programme Current results Summary For the CALICE Collaboration [Particular thanks to.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
LCTW Orsay Nov. 2009M. Chefdeville, LAPP, Annecy 1.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Digital Hadron Calorimeter (DHCAL) José Repond Argonne National Laboratory CLIC Workshop 2013 January 28 – February 1, 2013 CERN, Geneva, Switzerland.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
1 IWLC 2010 Geneva Oct.’10David Ward Tests of GEANT4 using the CALICE calorimeters David Ward  Electromagnetic particles (, e) were used to understand.
AHCAL analyses overview List of ongoing analyses targeted to the upcoming publications Erika Garutti.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL SiW ECAL Meeting at LLR, February 8th 2011.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Outline: ILC physics focus hadronic showers data and simulation requests from other HEP experiments some considerations G4 for the ILC and other non-LHC.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Interactions of pions in the Si-W ECAL prototype Towards a paper Naomi van der Kolk.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Hadrons in a SiW Electromagnetic Calorimeter for a Future Linear Collider Roman Pöschl LAL Orsay LHC EUDET Annual Meeting DESY Hamburg September/October.
21/09/2010CALICE Manqi RUAN Laboratoire Leprince-Ringuet (LLR) Ecole Polytechnique 91128, Palaiseau Status of DHCAL PFA Study.
1 CALICE Tail-Catcher Muon-Tracker(TCMT) Preliminary Test Beam Results Kurt Francis NICADD/Northern Illinois University For CALICE Collaboration ALCPG.
the CALICE test beam set-up and running experience
SiD Calorimeter R&D Collaboration
Preparation for CERN test beam
Construction and Testing of a Digital Hadron Calorimeter Prototype
CALICE scintillator HCAL
(My personal) CALICE Report
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
Rick Salcido Northern Illinois University For CALICE Collaboration
Michele Faucci Giannelli
Status of CEPC HCAL Optimization Study in Simulation LIU Bing On behalf the CEPC Calorimeter working group.
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE

2 The CALICE detectors Two major run configurations: - Si-W ECAL + Analog HCAL + TCMT(May & July 08) - Scint-W ECAL + Analog HCAL + TCMT(Sept. 08 & May 09) Next to come: - Si-W ECAL + Digital HCAL + TCMT(end of 2009) Online event display of 10GeV pion in Si-W ECAL+ AHCAL+TCMT

3 The test beam prototypes 1x1cm 2 lateral segmentation 1 X 0 longitudinal segmentation ~1  channels 3x3cm 2 lateral segmentation ~4.5  in 38 layers ~8000 channels 5x100cm 2 strips ~5  in 16 layer goal of prototype calorimeters: establish the technology collect hadronic showers data with unprecedented granularity to: - tune reco. Algorithms - validate MC models Si-W ECAL Scint. Tiles-Fe HCALScint. Strips-Fe Tail Catcher & Muon Tracker 1x4.5cm 2 lateral segmentation 1 X 0 longitudinal segmentation ~ 600  channels Scint-W ECAL

4 Technical aspects: installation Flying the CALICE stage into the M6 area the CALICE installation with Si-W ECAL + AHCAL + TCMT

5 Access via web-port world-wide: Established use of sophisticated system for remote control of detector & online monitor from around the globe  Thank you FNAL for making it possible! CALICE virtual control room

6 Data taking at FNAL ECAL – May+ July 08 ~60 M ev ScECAL – Sept. 08 ~40 M ev Smooth data taking after initial commissioning phase ~60 M events collected with Si-W ECAL + AHCAL (same as at CERN 07) ~75 M events with Sc-W ECAL + AHCAL (first time tested) ScECAL – May 09 ~35 M ev

7 Data quality on FNAL data Plots include ONLY pion runs from FNAL 08 both with ECAL and ScECAL  Good coverage of all energy range 1-60 GeV  Good performance of our detectors: less than 10% events rejected by Data Quality Data on tape After preliminary DQ selection

8 Suggestion for the user docu Maybe FNAL could consider to provide to the MTBF user some useful info on the users web page. Suggestions: Web page with updated Cherenkov pressure scans for “all” energies with clear “suggestions” which pressure to use for which particle type (takes a long time to perform) More info on muon energy spectrum/multiplicity for 32 GeV and 120 GeV beam (requires simulation of beamline)

9 Some ongoing Si-W ECAL analysis The standards: linearity & energy resolution LHEP QGSP_BERT FTFP_BERT More complex: pion analysis in ECAL (validation of MC models) total ECAL energy for 8 GeV pion

10 Some ongoing Sci-W ECAL analysis reconstruction of  0 from 2  clusters Insert a target in the beamline to convert pion beam into  0  real event reconstructed  0 mass

11 Geant4 9.2  10 GeV LHEP QGSP_BERT FTC data work in progress Some AHCAL ongoing analysis Analysis goal: validation of MC hadronic models Longitudinal shower shape Lateral shower shape Shower leakage pion/proton comparison work in progress

12 Next steps Exchange the active layers of the AHCAL with the DHCAL ones Go for the final test beam campaign  Compare technologies for ECAL / HCAL with data from the same test beam HV Mylar Signal Pad(s) Fishing line Channel Resistive paint Glue Gas volume Signal path Glass cassettes with resistive plate chambers and GEM are being build and tested expected to be ready by end of 2009 for installation in absorber frame

13 Conclusion The FNAL test beam was a successful campaign for CALICE We go home with a lot of high quality data and a lot of gained experience CALICE will continue tests at the MTBF  DHCAL installation planned end of 2009 We thank FNAL for the kind hospitality, the machine group and the test beam technical support group for their continuous help and support and in particular Thank you to Erik for being an indispensable contact, and an excellent information source and problem solver!

14 BACKUP

15 Achieved HCAL program compared to run plan: Energy scan with pion / electronok Position scan with electronstoo few position points Angular scan e ok / pi 30 deg, few E points Displaced pion only 2 runs (~ 4 planned) ok Proton run ok Very low energy point EXTRA ! … just as an example of plan/reality  ~80% of the program achieved

16 Summary of AHCAL stand alone run May 2009 E [GeV}particlecenteredgecornerdisplaced10 deg30 deg pi50 k ev -2pi300 k ev -4pi380 k ev 10pi200 k ev 150 k ev 20pi200 k ev 30pi200 k ev 10p200 k ev 15p100 k ev e140 k ev -2e200 k ev150 k ev90 k ev -4e200 k ev150 k ev -6e200 k ev150 k ev140 k ev -10e200 k ev 140 k ev -20e300 k ev200 k ev 150 k ev200 k ev too few points too few points