1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy ILC Controls Requirements Claude Saunders.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
8.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
Copyright 2009 FUJITSU TECHNOLOGY SOLUTIONS PRIMERGY Servers and Windows Server® 2008 R2 Benefit from an efficient, high performance and flexible platform.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
4-th International Conference for Confidence and Security in the Information Society Mikhail Senatorov Andrey Shcherbakov Trusted information and telecommunication.
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
ILC Control and IHEP Activity Jijiu. Zhao, Gang. Li IHEP, Nov.5~7,2007 CCAST ILC Accelerator Workshop and 1st Asia ILC R&D Seminar under JSPS Core-University.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Redundancy. 2. Redundancy 2 the need for redundancy EPICS is a great software, but lacks redundancy support which is essential for some highly critical.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
Architectural Design lecture 10. Topics covered Architectural design decisions System organisation Control styles Reference architectures.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
FAIR Accelerator Controls Strategy
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
Operations, Test facilities, CF&S Tom Himel SLAC.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
Preparation for Sept 9mA studies: Follow-up items from February J. Carwardine, 22 May 2012.
NICA control system, beam diagnostics V.Andreev, E.Gorbachev, A.Kirichenko, D. Monakhov, S. Romanov, G.Sedykh, T. Rukoyatkina, V.Volkov VBLHEP, JINR, Dubna.
ATCA at UIUC M. Haney, M. Kasten High Energy Physics Z. Kalbarczyk, T. Pham, T. Nguyen Coordinated Science Laboratory ILLINOIS UNIVERSITY OF ILLINOIS AT.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Controls Global Group Report John Carwardine ANL Presentation to GDE Bangalore Meeting, 10 March, 2006.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser DESY Status and Possible Controls Contributions to the ILC Kay Rehlich.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
1 Global Control System J. Carwardine (ANL) 6 November, 2007.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Low Level RF and Controls Brian Chase - LLRF Margaret Votava - Controls.
Director’s Review of the Project X Cost Range Estimate: Low Level RF Brian Chase Project X Director’s Review March 16, 2009.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
RDR Controls Design Walk- Through Controls and LLRF EDR Kick-Off Meeting August 20-22, 2007.
MicroTCA Development and Status
Presented by Li Gang Accelerator Control Group
ILC LLRF Status Ruben Carcagno, Brian Chase
The ILC Control Work Packages
Software Research Directions Related to HA/ATCA Ecosystem
Application of SysML to LLRF system design M.Grecki
The ILC Control System J. Carwardine, C. Saunders, N. Arnold, F. Lenkszus (Argonne), K. Rehlich, S. Simrock (DESY), B. Banerjee, B. Chase, E. Gottschalk,
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group

Beijing GDE Meeting, February 2007 Global Design Effort 2 Outline Controls Reference Design highlights Topic areas to get to EDR readiness R&D examples Work package examples

Beijing GDE Meeting, February 2007 Global Design Effort 3 Control system challenges Scalability High Availability Extensive reliance on automation and beam-based feedback to run ILC accelerator. Synchronous control system operation. Precision timing and RF phase distribution. Standards, standardization, quality assurance.

Beijing GDE Meeting, February 2007 Global Design Effort 4 Challenges for RF control Vector-sum calibration (Ampl. & Phase). Operation close to performance limits. Exception Handling. Automation of operation. Piezo tuner lifetime and dynamic range. Optimal field detection and controller (robust). Operation at different gradients. Defining standards for electronics (such as ATCA). Interfaces to other subsystems. Reliability. Brian Chase

Beijing GDE Meeting, February 2007 Global Design Effort 5 Control system RDR model Functional model (three-tier model) –Front-end: communicate with technical systems. –Services: coordination; archiver, databases, etc –Client: operator displays, scripting tools, etc Physical model –Front-end interface to technical systems. –Synchronous and general purpose networks. –Distributed and centralized processors. –Computing, data storage, control room, etc. –Pulse-to-pulse feedback infrastructure. –Diagnostic Interlock Layer.

Beijing GDE Meeting, February 2007 Global Design Effort 6 Physical model from RDR Some items of note: Physical model identifies some technology (eg ATCA), but is not technology dependent. No software framework selected, but we assume derivation from an existing framework. Assessments indicate that future ‘commodity computing’ will meet performance requirements. Some design concepts require validation during EDR phase.

Beijing GDE Meeting, February 2007 Global Design Effort 7 LLRF model

Beijing GDE Meeting, February 2007 Global Design Effort 8 From RDR to EDR… Develop RDR models into engineering design. Validate/prototype key concepts in RDR models, eg –Network architecture. –Front-end model, technical system interfaces. –Synchronous 5Hz feedback infrastructure. –Standards, standardization, QA. –Diagnostic Interlock Layer. Perform targeted R&D where it is needed, eg –RF field regulation (phase & amplitude). –High availability implementation. –Fault detection and recovery. Controls & LLRF support for test facilities.

Beijing GDE Meeting, February 2007 Global Design Effort 9 Status of EDR/R&D planning R&D objectives and model validation tasks for EDR are broadly understood. Initial list of specific work packages have been developed as part of the Americas region planning. Need to develop a more comprehensive list of specific tasks to get to EDR readiness.

Beijing GDE Meeting, February 2007 Global Design Effort 10 LLRF R&D from S2 tasks Heavy focus on accomplishing S2 tasks, including –Test beam-based feedbacks. –Develop RF fault recognition & recovery software. –Check beam phase and energy stability. –Demonstrate to us and the world that we can make an RF unit to spec. –Understand RF control issues in a system with many cavities and cryomodules distributed over a large physical space. LLRF R&D is dependent on beam-based test facilities. Strong LLRF development focus at ILCTA, XFEL,… Test facilities require Controls and LLRF infrastructure.

Beijing GDE Meeting, February 2007 Global Design Effort 11 LLRF R&D for SCRF RF Field Regulation –Maintain Phase and Amplitude of the accelerating field within given tolerances to accelerate a charged particle beam to given parameters up to 0.5% for amplitude and 0.03 deg. for phase Minimize klystron Power needed for control –RF system must be reproducible, reliable, operable, and well understood. –Active Piezo tuner feedback system –HINS- Fast Ferrite Vector Modulator control Other performance goals –build-in diagnostics for calibration of gradient and phase, cavity detuning, etc. –Interface with Machine Protection, exception handling capabilities –meet performance goals over wide range of operating parameters Brian Chase

Beijing GDE Meeting, February 2007 Global Design Effort 12 Real Time Cavity Simulator Justin Keung, UPenn

Beijing GDE Meeting, February 2007 Global Design Effort 13 High Availability HA is a requirement for all the technical systems. Need to investigate techniques, implications, and cost- benefit for meeting reliability requirements. Control system hardware & software are both impacted. Methodology component: –Design techniques, robust design. –Quality Control / extensive testing. –Standardization. Engineering component: –Reliably detect and then recover from faults. –Introspection, diagnostic tools,… –Redundancy, hot spares, remote power on/off,…

Beijing GDE Meeting, February 2007 Global Design Effort 14 Some ongoing HA activities Implement bpm electronics in ATCA crate (Fermilab). Implement Simcon board in ATCA crate (DESY). Redundant I/O controller for XFEL cryo-plant control system (DESY). Investigate I/O controller fail-over techniques using EPICS on ATCA (ANL). Study Shelf Manager operation and implementation (Univ. Illinois, UC). Diagnostic processor for Marx modulator (SLAC).

Beijing GDE Meeting, February 2007 Global Design Effort 15 ATCA hardware test setup Shelf manager 2xIntel Blade –Dual Xeon processors –Three watchdogs –Redundant embedded BIOS –Hotswappable Switch: ZNYX ZX5000 –Layer 2 switching and layer 3 routing –16 ports 10/100/1000 Mbps Ethernet Host PC: server Shifu Xu, ANL

Beijing GDE Meeting, February 2007 Global Design Effort 16 Fault Detection & Recovery (Univ. Illinois, UC) Shelf Manager Single board computer Network Switch NFTAPE: Control Host NFTAPE: Process Manager Single board computer FTM Exec ARMOR App Fault/error Injection Faults: Direct injection Propagation due to errors in Shelf Manager Recovery Z. Kalbarczyk, UIUC

Beijing GDE Meeting, February 2007 Global Design Effort 17 High Availability in EPICS Functions to implement redundant IOCs in EPICS are being developed for XFEL cryo-system (M. Clausen) –Redundancy Monitor Task. –Continuous Control Executive Task. EPICS has been ported to ATCA under linux-ha, and two incremental steps demonstrated (Shifu Xu) –Live migration of EPICS IOC running on one ATCA processor to another ATCA processor. –Auto fail-over from an active IOC running on one ATCA processor to a backup IOC on another processor without loss of connection to external process.

Beijing GDE Meeting, February 2007 Global Design Effort 18 WP example: HA control systems Investigate high availability design approaches, implications, and cost-benefit for the ILC control system. Example work package items: –Develop & evaluate controls failure modes and machine impact. Determine priorities for meeting overall availability. –Explore techniques such as virtual machine migration (Xen), clustering (heartbeat), redundant I/O controllers, etc. using [EPICS, DOOCS, Tango, …] on ATCA. –Evaluate and prototype second-tier HA techniques, eg: automated diagnosis, configuration management, coding standards. –Build vertical demonstration of all tiers of control system with HA techniques applied. Perform fault injection to test and evaluate. –Evaluate and prototype “Shelf-manager’ functionality in control system infrastructure for technical system fault management.

Beijing GDE Meeting, February 2007 Global Design Effort 19 WP example: ATCA evaluation Investigate suitability of ATCA as a high availability compliant electronics platform for ILC control system. Example work package items: –Prototype a precision instrumentation digitizer for beam position monitors. Evaluate analog & digital performance. –Prototype electronics functions to the AMC mezzanine card, and integrate with the IPMC diagnostic module. Write software drivers. –Evaluate cabling options for ATCA and AMC cards –Port [EPICS, DOOCS, Tango,…] to the ATCA platform, integrate and evaluate “Shelf Manager” functionality.

Beijing GDE Meeting, February 2007 Global Design Effort 20 WP example: diagnostic processor The diagnostic processor (DP) is conceived as the key element in the Diagnostic Interlock Layer (DIL). Work package example items: –Continue development of DP hardware for Marx and 4+1 supplies. Develop generic family of DP hardware (including chip-level) suitable for integration into various technical systems. –Develop on-board software to integrate DP with IPMI- based relay rack monitoring. Client software will be developed/acquired to provide a uniform management interface to all relay racks based on current standards.

Beijing GDE Meeting, February 2007 Global Design Effort 21 WP example: RF phase distribution Perform essential R&D on distribution techniques for the 1300 MHz timing distribution system. Example work package items: –Investigate & evaluate strategies for phase stabilizing long fiber links modulated at 1.3 GHz. –Demonstrate critical time of arrival stabilization at a dummy Interaction Point using NML beam test facility. –Investigate feasibility of using a beam-derived reference for locking a local phase reference. –Prototype a redundant phase reference receiver with decision logic to auto-switch upon detected failure.

Beijing GDE Meeting, February 2007 Global Design Effort 22 Summary RDR models for Controls and LLRF provide a starting point for the EDR phase. Top level goals and topic areas for EDR are known. Initial set of work packages has been developed. Must develop a more thorough list of topics and work packages needed to get to EDR readiness.