E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.

Slides:



Advertisements
Similar presentations
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
Advertisements

SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Measurement of the absolute efficiency,
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
FCAL R&D in Minsk Group: Sensors and Electronics FCAL Collaboration MPI Munich October 17, 2006, Munich, Germany Presented by Igor Emeliantchik.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Gain stability and the LYSO beam radiation monitor measurements
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Study and Development of the Multi-Pixel Photon Counter for the GLD Calorimeter Satoru Uozumi (Shinshu, Japan) on behalf of the GLD Calorimeter Group Oct-9.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Conceptual design of TOF and beam test results
Presentation transcript:

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system Status of PMT calibration Radiation Source with magnet separator Planning

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Cosmic test results Load2 SPD#7(O “A”), SPD#8(O “A”), SPD#4(I “A”), PS#4(I “C”) – OK (+check data) Load 3 – PS#1,#2,#3; SPD#3 OK ; data checked Load 4 – PS#7,#8; SPD#1,#2 OK ; data checked Load 5 – PS#5,#6; SPD#5,#6 – PMT calibration done, problem with one(?) pixel on PMT#2 (over illuminated with LED). Analysis in progress.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Cosmic test results Load2 OK: –SPD#8 (outer “A”) – check data for errors –SPD#7 (outer “A”) - check –SPD#4 (inner “C”) - check –PS#4 (inner “C”) - OK

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Cosmic results

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Cosmic results

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of monitoring system Monitoring system is installed on all 16 SMs. LED drivers are tuned with oscilloscope on 15 SMs. Scope of work done: –installation done for 750 drivers +120 splitters, –Constructed and installed ~1000 fixations, 900 cables –40,000 tunings (3 iterations for channel) is done –Found ~ 1000 badly soldered elements, mostly trimmers –+ bad contacts, shorts in connectors Measurements using cosmic test DAQ show that –Slope of light vs bias voltage of LEDs is rather different. –Tuning with oscilloscope is done at high signal ~ 100 MIPs and often works badly for low signals ~ 5 MIP. –retuning at low signal improves situation. –Checking with DAQ also help to detect electrical cross-talk between drivers (bad contacts in connectors, soldering and grounding) 4 PS ‘C’ site are checked and fine tuned using CT DAQ and ready for transportation Check and tuning with CT DAQ is relatively fast and very useful.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting LED stability scan (violet LEDs) Start 27/04 21:00 End 28/04 9:00 No temperature monitor

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Stability scan - 1, 12 hours, night Blue LEDs (WUSTLICH) Start at 21:00 21/04, end 9:00 22/04 Channel #10: bad soldering at the driver output, LED got disconnected -> gives an idea of effect on other channels.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Stability scan -2, 12 hours, night The same time, another driver. Ambient temperature was not monitored.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting LED amplitude scan -1 Violet LEDs: Signal from 64 LEDs was measured by Lecroy QDC (Y-axis channels) as function of bias voltage V. 1000ADC c ~ 550 ph.el. ~ MIPs

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting LED amplitude scan -2 Example of 64 Blue LEDs scan over V is shown on the plot Some of LEDs have different slope of the characteristics

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting PMT calibration. Comparison with Clermont data. Finally, after correction the data for the difference in pixel mapping and gain coefficient definition, the comparison of PMT calibration without mask vs calibration of Clermont (Stephane) shows quite reasonable coincidence for three from four tubes.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting PMT calibration. Comparison with CF data. Three of four tubes are correctly identified. For these 3 tubes the ratio of calibration coefficients does not walk out of +-20% corridor. RMS of the ratio for 3 identified tubes is 9, 9.5 and 7.5%. RMS for the ratio of very different tubes (plot left-up) is 18% (corridor is +-33%).

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting PMT calibration PMT calibration with mask is needed for beter understanding of data First calibration with mask with 1 mm holes was done yesterday Analysis is in progress

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Radiation source with magnetic separator and trigger Sr90 370MBq El. magnet Trigger counterSeparator exit through collimating slit

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Rad. Source with scintillator pad Signal from rad.source was measured as a function of magnet current. On the plots the spectrum of signal is shown. Optimal values of current are found A. The relative width ~15% of spectrum is dominated with photostatistical fluctuations Trigger rate obtained was Hz with fake trigger contamination ~1%. Source efficiency with large scintillator pad was achieved as 50-60%.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Rad.source studies (scintillator vs LSO crystal) Photo-statistics: Signal from scintillator pad was measured from both ends of fibre ~20-25 ph.el./end To measure the signal with larger light output we used 1 cm^3 LSO crystal with PMT read-out. Resolution “in peak” obtained was ~8-9% (r.m.s). “Peak” is ~1/3 of triggers on large low energy substrate (due to crystal geometry?)

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Rad.source studies (“dead” material) Dead material in front of pad: 2 mm of fiberglass ~ module box’s bottom. Signal losses are: 1.Energy losses are ~50%; 2.Trigger rate ‘in peak’ drops ~3-4 times. Conclusion: rad.source with magnetic separator + trigger provide reasonable signal and rate conditions. Final check should be done with real module.

E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Planning 1.To prepare SPD SMs of site “C” for transportation – next week add. (re)measurement/replacement of 1 module Monitoring system check/retuning with DAQ 2.Analysis of PMT calibration for the last setup – this week 3.Preparation of the rest of super-modules site ”A” for transportation – end of May