Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
Piano Glove Team 3 Packaging Analysis. Introduction Allow the user to play on a virtual keyboard on any flat surface The Piano Glove will consist of two.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
IDine A Camera based Multi-touch Dining table Tejas D Kulkarni Abhisheyk Gaur Himanshu Raghav Ankur Mishra.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Design Review Team 6  Spring 2006 Greg Snow Allan Patterson Kyle McGhee Joseph Davidson.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
FLAC Audio Player An ability to decode files stored in the FLAC format. An ability to select files stored on the device. An ability to display visualization.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 5  Spring Project Overview Inertial based character recognition deviceInertial based character recognition device Battery.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
The “Drink Mixer” Design Constraints. Project Success Criteria An ability to digitally mix audio and adjust individual levels An ability to digitally.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
Μ [sic] design constraints wesley :: chris :: dave :: josh.
The Intelliglove Ryan DeFord Fred Grandlienard Kevin Mohr Andrew Gregor.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
SmartCup – Team 42 Harington Lee, Chirag Patil, Arjun Sharma 1.
On-Site HotBox Calibration System Team 2 Pourya Assem & Paul Lupas Prof. A.C.Singer ECE 445 – Fall 2012.
Digital Sound Projection ECE 477 Group 6 Design Constraint Analysis Steve Anderson Mike Goldfarb Shao-Fu Shih Josh Smith.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
GloveFX Patent Liability Ryan DeFord Fred Grandlienard Kevin Mohr Andrew Gregor.
ECE 477 Design Review Team 12  Spring 2007
Team 70: Air Guitar Gloves
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Design Review Team 5  Fall 2006
P-REV Advanced Electric Vehicle Racing System
ECE 477 Design Review Team ??  Fall 2012
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

GloveFX Overview Two gloves equipped with sensors Sensors monitor hand and finger motions Gloves send sensor data wirelessly to hub Hub uses data to play audio sample and add effects to the samples in real time Hub has inputs to set samples on each finger Hub outputs audio through headphone jack

Project-Specific Success Criteria 1. 1.An ability to correctly transmit data wirelessly from gloves to base station An ability to determine the absolute orientation of a user's hand using an accelerometer An ability to load sound files from an SD card and convert them into an analog output signal An ability to use digital signal processing to apply effects (such as reverb, delay, and distortion) to an audio signal An ability to determine the intensity of a user’s finger presses.

Block Diagram Gloves

Block Diagram Main hub

Component Selection Rationale microcontroller dsPIC dsPIC30F4013 Blackfin ADSP-BF512F SHARC ADSP Voltage V3.2 V Clock Speed40 MHz400 MHz200 MHz Ram2 KB116 KB2 Mb Fixed/FloatingFixed Floating Packaging18/SOIC176 ld LQFP144 ld LQFP Cost$6.12$25.49$20.46 Operating Power XXX~100 mW~600 mW

Component Selection Rationale battery Compact size Sufficient life Safe Low cost Our choice: 3.7 V, 750 mAh Li-Ion polymer for a minimum of one hour per charge

Component Selection Rationale wireless Compact size Reliable communication Ease of implementation Low power Low cost Our choice: XBee with 100 m range, 45 mA current draw during Tx

Packaging Design – Hub

Packaging Design - Gloves

Schematic (Power)

Schematic (Right Glove)

Schematic (Left Glove)

Schematic (SHARC DSP)

Schematic (Audio Output)

Schematic (Hub Power)

Schematic (Hub Memory)

PCB Layout (SHARC)

PCB Layout (Right Glove) 3.19 in 2.44 in 1.61 in 1.14 in

PCB Layout (Left Glove) 3.19 in 2.44 in 1.61 in 1.14 in

Software Design Overall operation of gloves in a main loop Most peripherals interface with SPI – –Flash memory – –SD Card D/A interface with I 2 S Serial

Software Design Inputs:Keypad for sample selection Rotary switch for finger mapping Sensor data from gloves Outputs:LEDs for system status Processed digital audio data Sample Selections

Software Design S1S3S5S4 S2 Buffered Samples A1A2A3A4A5 Amplitude Registers FX1FX2FX3FX4FX5 Effects Processing Algorithms Drive R&L channel through digital audio interface

Software Development Status Completed: – –Accelerometer calculation – –Wireless communication Tasks to complete: – –DSP Algorithms

Project Completion Timeline 10 March - Power circuitry for gloves 12 March - Completed PCB designs 26 March - Audio output circuitry 30 March - Read audio samples from SD Card 2 April - Output audio from SD Card 9 April - Decode wireless data from gloves 16 April - Modulate audio samples 28 April - All PSSCs implemented

? Questions?