AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.

Slides:



Advertisements
Similar presentations
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Advertisements

F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
PS and East Area re-commissioning with beam from the CCC after a 17 month shut-down R. Steerenberg with help of many colleagues from different groups PS.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Status and Prospects for the AD and ELENA
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Y. R. Roblin Hall A beamline and accelerator status.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
ELENA installation progress F. Butin / ELENA collaboration.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Status of HESR 18th March Gießen Dieter Prasuhn.
Lead performance throughout the injector chain with focus on LEIR
ELENA installation and commissioning status
Installations up to Start of Commissioning
AD consolidation activities in LS2
Injectors BLM system: PS Ring installation at EYETS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
The ELENA BPM System. Status and Plans.
Coupling Correction at the Australian Synchrotron
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
ELENA beam commissioning
Electron Cooling in ELENA - observations and plans
Presentation transcript:

AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1

Contents LS1 activities Main steps (forward…) Main issues Lessons learned Outlook for 2015 MSWG 16/01/2015T.Eriksson BE/OP2

LS1 work (selected items) Controls: – ACCOR (almost) completed, including FESA, InCA and Java migration – Central timing renewal, AD is now de-coupled from accelerator complex – Cycle generation software adapted/re-newed – New Beam Request Server Magnets: – DR.BHN06 renovated – DR.DHV2904 & 2917 replaced by new type – DE.Q7020 & 7030 replaced by new type (+ re-shuffling of line) Vacuum system renovation (25% of consolidation pgm completed) Stochastic cooling HW/SW/electronics/Servo motors renovation RF C02 HV & tuning supplies and interlock system renewal New Access Points and interlock system separation Magnetic Horn stripline failure. Discovered late… MSWG 16/01/2015T.Eriksson BE/OP3

Progress (main steps..) Start-up with beam initially planned 1/8 – 19/8 Physics run actually started 16/9 – 5/8: First beam on target after Horn strip-line repair completed. – 6/8: Circulating beam at 3.5 GeV/c w. good lifetime. – 8/8: C10 systems working, first signs of cooling. – 15/8: Beam cooled and decelerated to 2 GeV/c. after debugging of stochastic cooling and Schottky measurement system. – 20/8: Beam at 300 MeV/c – 24/8: Beam cooled at 300 MeV/c and decelerated to 100 MeV/c with decent efficiency. – 28/8: First signs of cooling at 100MeV/c – 4/9: Good cooling achieved at 100 MeV/c – 10/9: Beam ejected – 16/9: All ejection beam-lines set-up and beam delivered to experiments. Low ASACUSA and ALPHA efficiency due to Horizontal fluctuations. MSWG 16/01/2015T.Eriksson BE/OP4

Main issues Some additional delay due to the Magnetic Horn Strip-line repair. Started at low current while monitoring focusing effect with RP monitors. Lengthy debugging (days) of new timing/cycle/BRS system: – PS/AD cycle synchro – Pause/un-pause AD cycle – Cycle editing, plateau insertion – Ejection timing not configured at start-up Debugging timing + clocks for Schottky intensity measurement system Lengthy set-up of BCT timing C10 cavities start-up: HW problems and very low initial beam intensity C02 renovation with new HV and tuning power supplies & new electronics and interlock system. – Many (intermittent) bugs HW/SW C02 LL: – Frequency synthesiser replaced w/o our knowledge and with wrong setting – experts not always available, days lost for ejection set-up. MSWG 16/01/2015T.Eriksson BE/OP5

Main issues Stochastic cooling renovation: – p/u structure movement system motor drive/controls: much time spent to make it operational before abandoning and use expert-sw. FESA-class bugs resolved towards end of 2014 run. – Debugging static and dynamic parameter control & other issues related to new HW installation (PFF) – GSM noise re-appeared: new Cryo-temperature sensors removed on pickup tanks & discovered that gain for AD Hall system was back to max. (New GSM HW + contractor ?) Orbits: Polarity mess-up with the 4 H correctors around the electron cooler ( a lot of time lost…): – Various configurations tried… – 2904 and 2917; new magnets (calibration curves) – Cables re-routed and patched (for B393) => Erratic connections power supplies – Normally no big deal, but orbit pickup calibration factor corruption was discovered (2/9) after much struggling (HW problems with old orbit system, losses during ramps/plateaus, orbit bumps not local, orbit corrections sometimes converging and sometimes diverging, lengthy manual cross checks etc. etc.) – Large orbit jumps on some occasions, traced to DHZ2908 which after installing a field probe became stable – Orbit corrections are always necessary at low energies. ABS orbit correction no longer available – Lengthy YASP set-up: operational end August MSWG 16/01/2015T.Eriksson BE/OP6

Main issues Electron cooler set-up: – Cooling effect very sensitive to trajectory imperfections – New timing set-up (new beam loss scenarios discovered) – New HW fault: frequent drop-outs depending on e-beam trajectory. Not yet solved. Ejection lines: – Several cabling errors due to B393 re-routing – Crossed cables, labelling errors – Negative corrector settings in some elements not possible => CO bug – Large H fluctuations (detrimental to ASACUSA and ALPHA): DR.DHZ2908 Neighbouring AEGIS solenoid ramping w/o info or agreement DR.SME5306S: recent power supply mod with different regulation and steeper ramps: Believed to cause additional fringing fields outside septum blade. Checks with various ramping rates seem to confirm this Work-around installed; synchronous timing to have identical effect on each cycle. => fluctuations reduced by a factor 2.5 (which is close to previous years values) MSWG 16/01/2015T.Eriksson BE/OP7

On the good side… Many systems did actually start-up w/o particular issues…. Target area fully operational very fast Modified ejection line layout (preparation for ELENA) with new optics and some new magnets: set-up for all experiments was very smooth ! Beamline to the new BASE experiment commissioned w/o problems ! MSWG 16/01/2015T.Eriksson BE/OP8

2014 performance MSWG 16/01/2015T.Eriksson BE/OP9

Remaining (main) issues Residual fluctuations in ejection line trajectories Intensity still not optimal Electron cooler drop-outs Somewhat high V emittances at 2 GeV/c RP alarms due to new rules and detector placement – Lower alarm limits – weak points in ring shielding – losses when using BPM:s during s-u in experimental areas – monitoring of typical workplaces inside user barracks MSWG 16/01/2015T.Eriksson BE/OP10

General remarks / conclusion Large number of upgrades/modifications => It’s really a re-commissioning ! This took > 6 months back in 1999…. AD team works 2 shifts Mo – Fri, 1 (12h) shift Sat – Sun Start-up during holiday period A fair amount of PSB/PS down-time Equipment specialists not always available for AD issues ( sometimes only 1 person has the expertise…) Cumulative issues seem to have an exponential effect on start-up duration…. MSWG 16/01/2015T.Eriksson BE/OP11

Outlook for 2015 Late start-up due to re-location of kicker pulse generator equipment into B393. First beam to AD planned for 1/6, but will most likely be delayed. 3 weeks for setting-up leaves little time for studies. MSWG 16/01/2015T.Eriksson BE/OP12