MICE CMPB 18-11-2005 Alain Blondel 1 Highlights on MICE.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

Request & in-kind supportEarmarkedFurther requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE collaboration meeting Alain Blondel June MICE challenges organization global funding situation.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
MICE Funding agency committee meeting Alain Blondel 1 MICE: challenges, organization, global funding situation.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Project manager report paul drumm CM16 October 2006.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
MICE Phase 1 Koji Yoshimura KEK June
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Report on EUCARD WP6: MICE Transnational Access (TA)
Presentation transcript:

MICE CMPB Alain Blondel 1 Highlights on MICE

MICE CMPB Alain Blondel 2 NEWS 1Italian participation: Approval in principle of TOF construction and MUCAL subject to a number of succesful milestones including -- a prototype test in Frascati spring 06 and -- a justification of TOF2 -- the schedule to arrive with TOF0, TOF1 in spring 2007 is tight but OK -- the schedule for MUCAL in spring 2007 is very tight. -- the schedule to arrive with TOF2 in october 2007 is OK 2. Bulgaria collaborators are funded by CH-Bulgaria agreement -- started working on detectors read-out electronics 3. US NFMCC funding was approved by MCOG – confirms MICE funding priorities, in particular secures funding for spectrometer solenoids. Additional funding would bring step3 forward. Procurement of cable is now first priority. Coupling coil still an issue. (see discussion on Phase II by Ken L.)

MICE CMPB Alain Blondel 3 4. DAQ group started – working hard to reading close to 600 events in 1ms 5. Analysis group started 6. MICE started purchasing big items (cooling plant for Psi solenoid, for instance) 7. design and safety reviews are progressing (H2 safety Monday 21st Nov. 2005) 8. KEK tracker test successful! MHz cavity prototype had some delay (vaccum leak -- fixed) should be on the floor at MTA mid-January 10. funding request for Swiss coupling coil was submitted. Chances of success are unclear.

MICE CMPB Alain Blondel 4 at this point MICE (PhaseI) is an approved and funded project in 6 countries -- UK: 9.7M£ (phase I) PhaseII request and RF programme being prepared. -- USA: funding from the NFMCC (DOE baseline scenario 4.125M$) +RF source + NSF grant 300k$ + MRI grant 750k$. -- Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) (+ 1M$ requested) -- Switzerland: PSI solenoid + Uni-Geneva-NSwissF (80KCHF/yr)+ 1 PDA+1PhDS pending requests: Coupling coil, CERN RF -- Netherlands: Mag probes (in production!) + 1 PhDS -- Italy (TOF, Calorimeter) Summary:

MICE CMPB Alain Blondel 5 -- KEK tracker test: went very well.CONGRATULATIONS! Following this, new priorities will need to be set for the group, choice between further test beam or construction of final system. The decision will somewhat depend on the results of test beam analysis themselves. *  -- TOF: Bonesini and Chimenti presented to collaboration a clear description of the milestones they have in front of them for TOF and calorimeter (invite collaborators to help in the test beam!) comment: TOF0 AND TOF1 are both necessary in step I, although it could be argued that this can be slightly stepped (TOF0 first -- calibration, then TOF1, calibration, then measurements TOF1-TOF0) June 2007 good, end 2007 notOK. -- TOF2 justification: Yagmur Torun and analysis forum to organize work and discussion in view of holding a good discussion on this point in the collaboration meeting in Japan (March) -- DAQ: 600 muons per 1ms spill is difficult to achieve for the read-out electronics. We have to understand what are the real capabilities of the Scifi, TOF, calorimeter or Cherenkov read-out electronics. (discussions on-going) This is intimately linked to the running plan and will be addressed at the collaboration meeting in the same session.

MICE CMPB Alain Blondel 6 Tracker: four-station prototype test at KEK

MICE CMPB Alain Blondel 7  - STEP I: April 2007 = 525 days away! STEP II: October 2007 PHASE I Where do we stand in our preparations for Steps I and II. -- beam line: target, optics, tuning and correction abilities, diffuser, generate all  -- TOF, Cherenkov(s), MUCAL -- spectrometer solenoid -- tracker -- installation and cabling -- trigger -- controls and monitoring -- DAQ and event processing -- software: particle ID, reconstruction of tracks -- analysis: form run plan, reconstruction of « beam», emittance, transmission 

MICE CMPB Alain Blondel 8 1. The collaboration is making excellent progress in all fronts. Manpower is never in excess (simulations and optics, electronics, beam line, engineering support…) 2. The funding for phase I is essentially complete only Cherenkov II remains a question. 3. The funding for phase II is being prepared. We have a baseline solution for MICE up to step V but it will be late. Work is needed to assure that step VI can be performed in good time for the decision making-year 2010.