Beam Stoppers for LINAC 4

Slides:



Advertisements
Similar presentations
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Advertisements

Elements of a Lockout / Tagout Program BWC Division of Safety & Hygiene.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
P ROMETHEUS 5 System Overview.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4.
Control of Pneumatic Energy
ENEN Collimator Materials for LHC Luminosity Upgrade: Status of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 21/06/2013 N. Mariani.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MedAustron Beam Intercepting Devices BID Workpackage Review 15 March R. Folch EN/STI - BID Workpackage Review - March 2012 Speakers: Ramon.
Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard.
Overview of Cyclotron Facilities
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Possible irradiation needs from CERN and requirements (a partial and selected view) M. Calviani (EN/STI)
MS. Energy 07-PS3-2 I Can … Develop a model to describe that when the arrangement of objects interacting at a distance changes, different amount of potential.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Work-packages CLIC for the Drive Beam BJ, 23 feb 2010 Beam Dyn Meeting 2/23/11Beam Dyn meeting1.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’
TBTS Test Program & Schedule G. Riddone
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
Status of the Design Study Richard Catherall EN-STI-RBS.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’
Forms of Energy Openers Mrs. V Science Match each definition to the correct key term A. B. C. D.
Kinetic and Thermal Energy. Energy ***ENERGY DURING PHASES CHANGES – Energy must be lost to the environment or gained from the environment in order for.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
ESS Front End diagnostic
LINAC AG • IAP • Goethe Universität Frankfurt
LINAC4 Vacuum Control System Review
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Naming convention Rules
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Energy Systems An energy system is a method by which energy is transferred and work is done. There are four basic types of energy systems: Mechanical Fluid.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Linac 4 Devices Controls and Monitoring Status
Muon Inverse Rotation and Acceleration
ILC Cryogenics -- Technical Design Report Planning
By: Aaron Cox Jason Mills Warren Reeder Devin Roberts
Use your Journal to Name the Transformations
Energy in thermal systems
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
SPS Injection BIS - Draft requirements
Presentation transcript:

Beam Stoppers for LINAC 4 S. Cimmino/F. Loprete, EN-STI, Linac4 Design Status Report Meeting – Thursday 24/11/2011 Beam Stoppers for LINAC 4 Linac4 Beam Coordination Committee – Meeting 31

Overview Beam Stopper General Presentation; Thermal Analysis: First Results; What’s next. S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Beam Stoppers General Presentation S. Cimmino, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stoppers 160MeV Beam parameters: “A beam stopper is a mechanical safety device used to intercept a particle beam, to guarantee the personnel safety. (L. Bettazzi, C. Maglioni, EDMS xxx under definition) Beam parameters: The beam stopper 160 MeV has been designed considering a possible unification between all the beam stoppers from Linac to Ps. Maximum H- Current 40 mA Pulse Length 400µs Max Rep-Rate (1.1Hz) Beam Energy 160 MeV S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Stopper Position Beam stopper 160MeV Layout – L4T zone 3 “LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team ” Layout – L4T zone 3 S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Design S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Safety Requirements Fail Safe Condition: Pneumatic Failure; Electrical Failure; Control Failure. S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Material and Dimensions S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Thermal Analysis: First Results S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Energy Deposition S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Thermal Analysis Maximum Temperature is ok S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

What’s next Structural analysis; Detailed design (Design Office); Technical Specification for TL beam stopper. S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31

Thanks Cesare Maglioni; Frederic Loprete; S. Cimmino, EN-STI, Linac4 Beam Coordination Committee – Meeting 31