APEX 39 CAPE Priorities & Opportunities

Slides:



Advertisements
Similar presentations
Open Source Intelligence (OSINT): Defense Overview 26 August 2009 Version 3.1 LEADERSHIP BRIEF (6 Slides) As Created by Robert Steele.
Advertisements

Presentation for ASMC PDI 2010 June 4, 2010 Thomas Hessel Office of the Under Secretary of Defense for Personnel and Readiness Requirements and Program.
UNCLASSIFIED OFFICE OF ASSOCIATE DIRECTOR FOR MILITARY AFFAIRS March 2009 Train like you fight and fight like you train.
Trends and Uncertainty in the Defense Budget Todd Harrison.
Introduction to PPBE.
Applications in Acquisition Changing Defense Environment.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
Sea Air Space Symposium PB16 Budget Issues RADM Barry Bruner Director, Programming Division OPNAV N8O April 2015.
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 1 Electronic Warfare Information Operations 29 MAR 2011 Val O’Brien.
Defense Critical Infrastructure Program (DCIP)
Recent DoD Trends & System and Software Process Implications
Status of Army’s Civilian Human Capital Strategic Plan (HCSP)
DoN Update PB16 Overview; Fiscal Update Director, Fiscal Management Division, N82 3 March 2015 Rear Admiral William K. Lescher, USN Deputy Assistant Secretary.
UNCLASSIFIED Investment Choices for the New Defense Strategy March 27, 2012 Dr. Scott Comes Defense Acquisition Business Managers Conference.
Collaboration to Meet Future T&E Needs ITEA 14 September Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation.
Paul Dordal Executive Director BRAC RTF Transformation Game Plan Executive Committee May 21, 2009.
1 IEEE TRANSACTION ON KNOWLEDGE AND DATA ENGINEERING, VOL. 15 NO.5, SEPTEMBER/OCTOBER 2003 Manuscript received 10 July 2000; received 2 Jan. 2001; accept.
Research in Context The Federal and Political Landscape, What it Means for Universities Travis Reed Lewis-Burke Associates LLC October 1, 2012.
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Environment, Safety and Occupational Health (ESOH) in the DoD Business Management Modernization Program April 2005 John Coho I&E Business Transformation.
Deliberative Working Document - Predecisional FOUO Supporting the Secretary’s Top Priorities Eric Coulter, Deputy Director OSD Program Analysis and Evaluation.
APEX 25 Participants James “Jim” Argue
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
ASMC Washington Chapter Luncheon Meeting
The Planning, Programming, Budgeting and Execution (PPBE) Process John Roth Deputy Comptroller (Program/Budget)
June 2003 Defense Acquisition University Planning, Programming, Budgeting and Execution (PPBE) Business, Cost Estimating, & Financial Management Capital.
ASMC – Middle Georgia Chapter 9 Feb 2012 Luncheon Planning, Programming, Budgeting, and Execution (PPBE) Update Julian “Rob” Roberts Professor of Financial.
1 Institutional Adaptation Panel Association of the United States Army Mr. Dean G. Popps Acting Assistant Secretary of the Army (Acquisition, Logistics.
Department of Defense Priorities and Challenges John P. Roth Deputy Comptroller (Program/Budget) 7 March 2005.
1 13 Feb 2004 Army Performance Management and Integration Programs & Strategy Directorate (SAFM-CE) New Horizons in Costing and Performance.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
PPBES Planning, Programming, Budgeting, and Execution System.
Navy Warfare Development Command
APEX 23 Participants Susan Bailey
Radar Open Systems Architectures
FY 2013 DOD Budget Analysis EducateAdvocateSupport 1.
18 October CONSERVATION PARTNERSHIPS NGA CENTER FOR BEST PRACTICES SEPTEMBER 17, 2004 Jan Larkin Department of Defense Range Sustainment Program.
0 1 The FY 2016 President’s Budget is a Strategy-Driven, Resource-Informed Budget
Chapters 13, 14, 15, 16, and 17. Executive Offices and Budget The president has many advisors but the people in the White House are his closest and work.
1 What is Legislative Affairs? The Assistant Secretary of Defense for Legislative Affairs (ASD) is responsible directly to the Secretary of Defense for.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
AT&L Goals and Objectives Honorable Michael Wynne Acting Under Secretary of Defense (AT&L) March 2004.
Department of Defense Budget APEX Strategic Priorities The Quadrennial Defense Review – the first conducted in an era of global terrorism – continues.
UNCLASSIFIED The Analytics of Tough Choices Christine Fox, Director 12 April 2011.
Moving Towards GEOSS Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary of Commerce for Oceans & Atmosphere Future National Operational.
Excellence in Executive Leadership UNCLASSIFIED – For Official Use Only (FOUO) APEX 29 Executive Roundtable Executive Development September 2009.
APEX Briefing Kathleen Conley Director, Projection Forces, Program Analysis and Evaluation 1.
The Planning, Programming, Budgeting and Execution (PPBE) Process
Sea Enterprise Right Force Right Readiness Right Cost RDML Bill Kowba Projecting decisive joint capabilities! Sea Power 21 NDIA.
APEX 27 Participants Dr. M. Webster “Web” Ewell
United States Special Operations Command. United States Special Operations Forces.
US CYBER COMMAND The overall classification of this brief is: UNCLASSIFIED 1 Perspectives from the Command to APEX LtGen Robert E. Schmidle USMC Deputy.
PPBS Planning Programming Budgeting Systems. PPBS The Department of Defense is the only Agency to use this type of budget.budget.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
This Briefing is Unclassified Space Situation Awareness (SSA) for the Warfighter 25 August 2005 HQ AFSPC/DRC Lt Col Troy Pannebecker.
Assessing Army Infrastructure
TimeMondayTuesdayWednesdayThursdayFriday MORNING Lunch AFTERNOON Student Review/Jeopardy A01 Welcome & In-processing A02.
Colonel Harold Van Opdorp Marine Corps Senator Liaison Office National Marine Corps Council OLA Update.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Ms. Rebecca Beck Deputy Site Director DFAS Columbus March 18, 2016.
U.S. Coast Guard Cyber Education & Training
Defense Planning Program Guidance: Family Support Program Review
Multi-Service/DoD Munitions Activities Panel
OPERATIONAL TEST & EVALUATION CHALLENGES
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 1 Customer Advocate Airborne Electronic Warfare Systems 29 MAR 2011 Tim.
SPACE AND MISSILE DEFENSE WORKING GROUP
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
Special Staff / Communication Presenter: Karen Roberts and Richard H
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
Presentation transcript:

APEX 39 CAPE Priorities & Opportunities Jamie Morin OSD CAPE 9 September 2014 PLCC B6

Agenda Introduction to CAPE PPBE Process & Building PB15 PB15 Summary New Defense Strategy Expected Themes in PB16 End Game Speculation Continuing Challenges

Introduction to CAPE Independent advisor to SECDEF and DEPSECDEF on programmatic resource allocation issues and decisions Secretary of Defense Robert McNamara established “Systems Analysis” in 1961 (McNamara’s “Whiz Kids”) to analyze nearly every aspect of the DoD budget Name changed to Program Analysis & Evaluation (PA&E) in 1970s Weapons Systems Acquisition Reform Act (WSARA) of 2009 changed the name to Cost Assessment & Program Evaluation (CAPE) Focus on reducing cost overruns and schedule delays (ICEs, AoAs, etc.) Play a key role in the Planning, Programming, Budgeting, & Execution (PPBE) process Links the defense strategy to resources “Big P” versus “little p” Established in 1961 by Secretary McNamara to analyze nearly every aspect of the DoD budget Originally named Systems Analysis Changed to Program Analysis and Evaluation (PA&E) in the 1970s Weapons Systems Acquisition Reform Act (WSARA) of 2009 Established the Director of Cost Assessment and Program Evaluation (D,CAPE), a Presidentially appointed, Senate confirmed position Transferred PA&E staff to CAPE Addressed shortcomings in DoD acquisition processes Required realistic cost estimation throughout the acquisition cycle Expanded the need to provide guidance for Analyses of Alternatives (AoAs) Serve as an independent advisor to the Secretary and Deputy Secretary of Defense on programmatic resource allocation issues and decisions Develop innovative options to assist the Secretary achieve objectives (e.g., EASE) Manage the Program Review process and work with Comptroller to build the budget submission for Congress Provide accurate, objective analysis to the Secretary & Deputy Secretary Research topics selected by the Secretary for in-depth analysis (e.g., LRS and Munitions FEAs) Conduct trade-off analyses to better inform decisions Reassess major programs as DoD needs and capabilities evolve Provide analytical support for long and short term tasks (e.g., Strategic Choices and Management Review (SCMR)) Consult with the USD(AT&L) and USD(C), Service Secretaries, and head of the Defense Agencies on matters of cost estimation in DoD Issue guidance on cost estimation for and review cost estimates of MDAPs and MAISs Issue guidance on life-cycle management and sustainability costs in MDAPs and MAISs Manage the 3-Star Programmer’s Group meetings that feed much of the content presented at the Deputy’s Management Action Group (DMAG) Inform other processes across the Department (e.g., JROC, JCIDS, etc.)

PPBE Process & Building PB15 CAPE’s focus is on FY16 and beyond (informed by what’s happening today Strategic Choices & Management Review (SCMR) was completed in the summer Provided insight that was used to adjust Service toplines in fiscal guidance Fiscal guidance emphasized that we have less of a need for large ground forces, but that we should protect forces needed for Asia/Pacific conflicts

PB15 Summary Navy Air Force Army Marine Corps Efficiencies Cruiser modifications (innovative) Air Force Cut A-10s and legacy modification; Protected F-35, Tanker & Bomber KC-10s Army GCV Helo restructure Force structure targets Marine Corps Focused on readiness

PB15 Topline We’re still living with uncertainty FY15 Opportunity, Growth, & Security Fund ($26B for DoD) Readiness Enhancement -- Training adds in Army -- Spares and logistics in Navy -- Unit training in USMC -- Flying hours in Air Force Installation support increase -- All Services increase base sustainment -- All Services add MilCon funding Investment increases -- Army helicopters (56) -- Navy P-8 (8), E-2D Aircraft (1) -- USMC Light Armored Vehicle and minor procurement -- Air Force F-35 (2), C-130J (10), MQ-9 Aircraft (12) ++++++++++++++++++ FOR FY15–19: Blue minus Green = PB14 minus PB15 = $113B Green minus Red = PB15 minus BBA/BCA = $115B What do we know? Continuing Resolution Election year New defense strategy Reduced reliance on OCO   What don’t we know? No new budget deal What topline OMB will submit How to address unfunded $$ Long term health of force

New Defense Strategy QDR & PB15 Strategy Attempt to measure delta in sequestration in terms of the strategy Secretary’s speech suggests a much less capable force How much less capable? In what areas? What can we do about it? How do we maximize the performance of a sequestered force?

Expected Themes in PB16 Budget disconnects Uncertainties What we know Topline levels BRAC authority Compensation Other unknowns What we know Continuing Resolution likely in the fall Elections this fall Debt ceiling suspended until March 2015 What we DON’T know No new budget deal Long term health of force (depends on where we are in the out-years)

End Game Speculation Submit a higher, non-sequestered budget level Need a plan to prepare a budget at at sequestered budget levels if we do not get the topline we want

Balancing Challenges Fiscal Uncertainty Topline Timing OCO Action on prior requests Strategic & Operational Challenges Shift to Asia – away game, geography, & A2AD EM Spectrum Dominance Commercial technological pacing vs DoD OODA Loop Adversary cost imposition Internal Cost Pressures People Acquisition Operations and Support

BACKUP

Principal Deputy Director LtGen Robert E. Schmidle Jr. CAPE Org Chart DIRECTOR, CAPE Jamie M. Morin Principal Deputy Director LtGen Robert E. Schmidle Jr. Front Office Team Cost Assessment Deputy Director Rick Burke Program Evaluation Deputy Director Scott Comes Analysis & Integration Deputy Director Vacant Program, Data, & Enterprise Services Deputy Director Joseph Nogueira Economic and Manpower Analysis Weapon Systems Cost Analysis Advanced Systems Cost Analysis Operating and Support Cost Analysis Land Forces Naval Forces Tactical Air Forces Projection Forces Irregular Warfare C4 and Information Programs Strategic Defensive & Space Prgms Force and Infrastructure Analysis Intelligence, Surveillance, & Rec. Program Analysis Simulation Analysis Center Force Structure & Risk Assessment Enterprise Services Joint Data Support Program Resources & Information Systems Management