GLAST LAT ProjectMarch 24, 2003 6F Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 6F: Tray assembly A. Brez I.N.F.N.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Procedure for MCM rework on tray MID 070
Mini-Tower test results
Investigation on tray MID 063 Back
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Module/Ladder Assembly
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N. Pisa Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS MCM Assembly on Trays and Test (INFN) Procedure doc: LAT-PS MCM incoming test: Read out tests Noise level Noisy channels HV test MCM assembly with glue and screws Scotchweld 2216 A/B gray Glue thickness.1mm Pattern of glue lines to avoid air trapping Area occupancy ∼ 50% ⇨ Δt ≲ C MCM final test: Read out tests Noise level Noisy channels HV test The tray is put in the tray-storage box and is delivered to the ladder assembly center

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS Integration of SSD Ladders onto Tracker Trays Assembly in G&A Engineering Assembling steps Tray position study, Z adjustment The ladders are aligned on the alignment jig The ladders are vacuum kept by the bridges The glue drops are deposited on the tray The tray is placed again on the tool The ladders are positioned on the tray by means of the bridges Glue cure (at RT for more than 6 hours) Ladder metrology Microbonding MCMs fast test to check bondings Encapsulation The tray is placed in the tray-storage box for delivery to test labs Tray position study, Z adjustment The ladders are aligned on the alignment jig The ladders are vacuum kept by the bridges The glue drops are deposited on the tray The tray is placed again on the tool The ladders are positioned on the tray by means of the bridges Glue cure (at RT for more than 6 hours) Ladder metrology Microbonding MCMs fast test to check bondings Encapsulation The tray is placed in the tray-storage box for delivery to test labs Procedure doc: LAT-PS-01801

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS The tools Jig of ladders alignment Ladders vacuum kept on the bridges Jig of tray alignment Reference dowels Alignment micrometers C.M.M. with touch head and optical head All the assembly operations under C.M.M. Glue spots deposition with automatic dispenser Microbonding with automatic wedge bonder

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS Assembly phases Tray positioning Ladder positioning Microbonding 1 assembly chain ready 5 assembly chains in construction Max assembly rate : 15 trays/week Foreseen assembly rate: 10 trays/week

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS Connector savers Fixation screws The tray storage box This robust Aluminum box allows safe and clean shipping. The tray can be tested in the closed box, connecting the MCMs through the connector savers. Connector saver protections

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS First results  =14  m Planarity Requirements: Alignment error < 40  m Planarity 100  m

GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS Conclusions The tray assembly has been successfully tested: the alignment and planarity of the ladders are in specification with possible improvements. The number of tools in production will allow an assembly rate of 40 trays/month (2 towers/month) that well matches with the test rate of the trays and towers.