Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.

Slides:



Advertisements
Similar presentations
Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
Advertisements

Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
Progress and Plan for Superconducting RF Cavity RF Group.
Experimental breakdown studies – breakdown diagnostics Linking simulation and experiment Jan W. Kovermann, CERN, RWTH Aachen SLAC workshop July 2009.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Update on TERA C-band high gradient test A.D
Report from NLCTA CERN Built T18’s degC Vacuum Braze degC H2 Braze (SLAC procedure) - New T24s 1.CERN Built (cells pre-fired) 2.KEK/SLAC Built.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
30 GHz waveguide line modification towards 12 GHz.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
Page 1 F. Peauger High Gradient preparation - Team Meeting – CERN – 12/12/07 High Gradient Preparation of a 30 GHz HDS-Thick structure 1.Physical arguments.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
TBTS Test Program & Schedule G. Riddone
W. Wuensch CLIC project meeting High-power rf structure testing.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Treatment Machines for External Beam Radiotherapy
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
30GHz system improvements Jan Kovermann RF meeting
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
X-Band Test Stands: Conditioning and Operational Algorithms Joseph Tagg National Instruments Switzerland.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Progress on investigation of dynamic vacuum (RF structures only)
ILC-SCRF Test Facilities considerations
News from TBTS International Workshop on Future Linear Colliders,
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
BE-BI Software for LINAC4
XFEL Vacuum System Commissioning
Recent high-gradient testing results from the CLIC XBoxes
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
High Level applications development status
CLIC Feasibility Demonstration at CTF3
3 GHz and 30 GHz Conditioning Programs
Pressure distribution calculations for the PETS
System tests at CEA O. Piquet 19/03/2019
Presentation transcript:

Jose Alberto Rodriguez

 Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from your suggestions and comments 6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez

 Description of the 30 GHz test stand  Before the test starts  Typical testing history  After the test is finished 6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez

e - gun linac PETS Beam dump Accelerating Structure P INC coupler P TRANS coupler Faraday Cup CTF3 CTF3 control room CTF2 Variable attenuator Analog electronics Digitizers Klystron gallery Control software User interface CCC Data logging 6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez

P INC coupler Calibration Data acq. and Control software 6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Variable attenuator Downmix to 1.5 GHz Scope in control room I-Q Demodulator Digitizer IDigitizer Q User Interface Data Logging Data acq. software User Interface Data Logging Calibration e - gun Variable attenuator

 Cold rf measurements  Metrology  Cleaning  Surface treatment  Inspection with an optical microscope  Inspection with SEM  Final assembly  Cold rf measurements 6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez DESCRIPTION ESTIMATED TIME (days) NEW STRUCTURE INSTALLATION 1 Opening CTF2 Removing cover plate of the previous structure 1 2 Low level RF measurements of previous structure Installing new structure in the cover plate Low level RF measurements of new structure 1 3 Installing cover plate with new structure in the tank Installing all the other RF components Leak checking 2 4Pumping down to ~ torr2 TOTAL TIME7

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez DESCRIPTION ESTIMATED TIME (days) CONDITIONING THE STRUCTURE 5Implementing and checking calibrations0.25 6Conditioning of a Cu like structure7.25 TOTAL TIME (assuming 75% machine uptime) 10 INTERMEDIATE STRUCTURE CHARACTERIZATION 7Searching working conditions0.5 8BDR ~ 10 -3, T = 70 ns, f = 10 Hz, N = BDR ~ 10 -4, T = 70 ns, f = 10 Hz, N = BDR ~ 10 -5, T = 70 ns, f = 25 Hz, N = BDR ~ 10 -4, T = 70 ns, f = 10 Hz, N = BDR ~ 10 -3, T = 70 ns, f = 10 Hz, N = TOTAL TIME (assuming 75% machine uptime) 6

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez DESCRIPTION ESTIMATED TIME (days) FINAL STRUCTURE CHARACTERIZATION 70 ns (as in intermediate characterization) ns (as in intermediate characterization)4.5 15Dedicated pulse length dependence measurements1 16Dark current and ion current measurements1 17Calibration checking Investigation of structure transmission properties: nonlinearity and effect of temperature (repetition rate) BDR as a function of repetition rate2 20Vacuum related experiments0 TOTAL TIME (assuming 75% machine uptime) 20

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez We can capture, analyze and log information about every rf pulse (tested up to 25 Hz) We can define: -Target final values for T and P - Speed to approach target final values - Intermediate T and P values - Interlock on Faraday cup currents, reflected power, missing energy, vacuum pressures… We will implement feedback loops to improve stability of the rf pulses in the near future

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Circular π/2 Cu

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez HDS11 Ti

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez HDS11 Ti Problems with the stability of the power source

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Circular π/2 Cu

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez HDS60 Cu Large

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Dark currents to determine β at different conditioning states will soon be available Circular 2π/3 Cu Circular π/2 Cu Positive ion currents were occasionally measured It will be done systematically in the future

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Losses in the structure are measured using high power to detect discrepancies in the calibration and non-linear effects (maybe due to dark current capture) HDS11 Ti Large HDS11 Mo Large

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez Main rf properties of the structures are measured after every high power test HDS11 Ti Large

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez HDS60 LargeHDS60 Small The whole structure is inspected using an optical microscope HDS11 Ti Large Generally one quadrant in inspected using a Scanning Electron Microscope (SEM)

6/19/ The X-Band Accelerating Structure Design and Test-Program Workshop Jose Alberto Rodriguez