CII Director’s Remarks Wayne A. Crew, P.E., CII. NCCER – Scramble for Skills Sponsors Cianbro CMLA (Construction Market Labor Analyzer) Fluor Hargrove.

Slides:



Advertisements
Similar presentations
COAA Industry Benchmarking What gets measured, gets improved! “When you’re average, you’re just as close to the bottom as you are to the top.”
Advertisements

1 | Energy Education and Workforce Developmenteere.energy.gov Public Service of Colorado Ponnequin Wind Farm Energy Story – To Residential and Beyond Joshua.
Connecting the Technopark to the Incubator Association of University Research Parks, 2012 © Harold Strong, AURP Immediate Past President Director of Discovery.
BY THE NUMBERS Pennsylvania in FY 2012 $261 Million: NSF funds awarded 7 th : National ranking in NSF funds 82: NSF-funded institutions 1,137: NSF grants.
CII Net Value-Add January Mission  Enhance business effectiveness and sustainability of the capital facility life cycle  Increase business success.
APPLICATION OF A RISK-BASED DECISION SUPPORT TOOL FOR EVALUATING AVIATION TECHNOLOGY INTEGRATION TO A CONTROLLED-FLIGHT-INTO-TERRAIN ACCIDENT by Denise.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
Potential Financial and Employment Impact from the Development of Oil & Gas in the North Aleutian Basin Shell Offshore Inc. Anchorage, Alaska October,
CII Overview Presentation
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
© 2013 Autodesk Autodesk Certified User Program Philip Koneman, Ph.D. Global Program Manager, Certification Certiport Partner Summit.
Project Definition Rating Index (PDRI) Revisited
Federal Aviation Administration CLEEN (Continuous Lower Energy, Emissions and Noise) Program Technologies Development AIAA Aerospace Sciences Meeting Jim.
4/07/09 Briefing to Senate & House Committees on Labor American Recovery and Reinvestment Act of 2009 STATE ENERGY SECTOR PARTNERSHIP AND JOB TRAINING.
CPI Conference 2001 Education Tools and How to Access Them Education Committee Chris Hyvonen Kiewit Chris Hyvonen Kiewit.
Joe Klocko Director, Center for Applied Competitive Technologies College of the Canyons Santa Clarita, CA.
The GPIC/ASHRAE Partnernship William Bahnfleth, PhD, PE Treasurer, ASHRAE High-Performance Building Congressional Caucus Coalition October 27, 2011.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1.1.2 Leadership Communication Supplier Excellence Alliance April 8, 2013 Presented by John Cristman Director, Corporate Quality Integrity Aerospace Group.
United States High Growth Industry Initiatives Gregg Weltz Director of Youth Services U.S. Department of Labor XIV Inter-American Conference of Ministers.
AIAA’s Publications Business Publications New Initiatives Subcommittee Wednesday, 9 January 2008 Rodger Williams.
CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company.
High School Inc. Academies at Valley High School April 26, 2011 Jane A. Russo, Superintendent Dawn Miller, Assistant Superintendent, Secondary Division.
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
Benchmarking the Value of Best Practices CPI Conference September 30, 2002 Austin, Texas.
Clean, Green, and on the Same Team! How Economic and Workforce Development are Partnering to Serve an Emerging Regional Industry.
Detroit Regional Manufacturing Skills Alliance. History In late 2006 the Detroit Regional Chamber was selected as the convener for the advance manufacturing.
Forecasting and Minimizing Field Rework Effects of Field Rework Research Team 2000 CII Annual Conference Nashville, Tennessee Jim Atkinson U.S. Steel Effects.
Nick Lavingia 1 Panel Four: Managing the Work Owner’s Role (Better, Cheaper, Faster and Safer Projects) Dr. Nick J. Lavingia, P.E. Project Management Consultant.
B Corporations Inner City Advisors-East Bay Community Foundation July 10, 2008.
Lineman Training & Recruiting Presented By: Paul Elkins Georgetown Utility Systems.
1 st PMI AGC ENERGY FORUM: DMS DEBATES June 2, 2010 EPCs Should be on a Bonus Incentive Scheme to Exceed Contract Expectations Dependability, Expertise,
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
Facilitating Solutions for Business and Industry……. WORKFORCE DEVELOPMENT IN “FOUR STEPS” Tim Johnson President The TJC Group.
Bioterrorism and Emergency Preparedness November 16, 2005 Jon Huss Director, Community Preparedness Section.
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Wylfa Update Dylan J Williams NWEAB Supply Chain Programme Senior Responsible Owner October 2015.
RT 201 Proudly Presents: Leadership in a Knowledge Era.
Construction and Maintenance Education Foundation UPDATE James Morris Jacobs Field Services North America 2006 CMEF Chairman September 14, 2006.
Great Taste, Less Filling PDRI Small Industrial Projects (PDRI-SIP)
Critical Factors for Commissioning/Startup Success
2015 CII Annual Conference August 3-5 Boston, Massachusetts Art MarkmanNoé SáenzStephen Mulva Univ. of Texas / HDOBurns & McDonnellUniv. of Texas / CII.
Hans VanWinkle CII Director Austin Renaissance Hotel Austin, Texas September 11-13, 2005 CPI Conference Leadership of Tomorrow: Bridging the Gap.
Validating Advanced Work Packaging as a Best Practice – A Game Changer Jim Rammell, Wood Group Mustang RT 319, Transforming the Industry: Making the Case.
2015 CII Annual Conference August 3–5 Boston, Massachusetts Find Your Revolution The Next Generation Leaders Sparking a COP Revolution An Implementation.
©2012 RAY SVENSON CONSULTING, INC. 1 DESIGN A HIGH-LEVEL SYSTEM ARCHITECTURE Facilities and Equipment Infrastructure NetworkLMSContent RepositoriesHRISAccess.
Industrial and Manufacturing Engineering JACLYN VANGILDER LAURA PAZ VINCENT ISOPI.
University of Utah Program Goals and Objectives Program Goals and Objectives Constituents U of U, COE, ASCE, IAB Constituents U of U, COE, ASCE, IAB Strategic.
Integrated Project Estimating & Scheduling By Dr. Awad S. Hanna Professor and Chair of Construction Engineering and Management Program Department of Civil.
Incubating Successful Businesses in Napa Carol Kraus Lauffer Partner Business Cluster Development Innovation Napa Valley October 17, 2012 Carol Kraus Lauffer.
Hilton Hotels Corporation use of Cook Systems’ CollegeCareerCorps SM : “Adventures in Regression Testing” Laurie Craig, Manager OnQ Property Systems, Hilton.
1. Stephen R. Thomas Candace L. Macken Tae Hwan Chung Inho Kim Construction Industry Institute Funded by NIST 2.
Construction Technology, NCCER and Ohio’s new courses Connections to Education Conference 2016.
2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Opening Comments Noé Hernández-Sáenz (Moderator) Burns.
INTRODUCTION Presentation Name.
Introducing pdri for mega projects As a Planning quality Control tool
SHIFT 2017 Deborah Sims BSC MSC FCIHT CENG PGCertHE FHEA
Forecasting and Minimizing Field Rework
Are Government Alliances a Threat to Workplace Safety
Education Tools and How to Access Them
Stacey Gibson, Burns & McDonnell Dan Gary, CCC Group
Technology Experts Panel
Contractor Workforce Development Committee
Investment in Energy Workforce
ApprenticeshipNC Regional Collaboration and Expansion Project
Breakout Session Summary Construction
The Dynamics of Building the Healthcare Talent Pipeline
IMPLEMENTATION TEAM STRUCTURE, ROLES, AND RESPONSIBILITIES
ApprenticeshipNC: A Talent Driven Training Strategy
Presentation transcript:

CII Director’s Remarks Wayne A. Crew, P.E., CII

NCCER – Scramble for Skills Sponsors Cianbro CMLA (Construction Market Labor Analyzer) Fluor Hargrove Engineers + Constructors ISNetworld Judgement Index NCCER Prov S & B Engineers & Constructors Southern Co. (Go Build) Victaulic Yates Zachry Group

2015 CII AWARDS & PARTICIPATION OPPORTUNTIES

VIPs: 2015 Awardees AwardIndividualCompany Distinguished ServiceRick BilottoProcter & Gamble Doug EastmanArcelorMittal Dofasco Bryson EdmondsRobins & Morton Joe GionfriddoProcter & Gamble Rich HofferChevron Stan TrippLyondellBasell Outstanding ResearcherMatt Hallowell, Ph.D.University of Colorado Outstanding Graduate Research Associate Wes CollinsArizona State University Outstanding InstructorFernanda Leite, Ph.D.The University of Texas at Austin Outstanding ImplementerJoe MartucciPublic Service Electric & Gas Company

VIPs: 2015 Awardees AwardIndividualCompany Professional Development CCC Group, Inc. CII Curriculum Partner ProgramThe University of Alabama Distinguished ProfessorsDavid Jeong, Ph.D.Iowa State University SangHyun Lee, Ph.D.University of Michigan Carol Menassa, Ph.D.University of Michigan Ali Mostafavi, Ph.D.Florida International University

VIPs: 2015 Awardees AwardCompanyIndustry Sector Performance Assessment UsersU.S. Department of StateOwner – Building The Williams Companies, Inc.Owner – Industrial WalbridgeContractor – Building S & B Engineers and Constructors, Ltd. Contractor – Industrial

CII Research Team Staffing Research Team Owner Need Contractor Need RT 314 continuation - PDRI Tool for Small Infrastructure Projects62 RT Improving Safety Performance through Operational Discipline3 RT Using Precursor Analysis to Prevent Low-frequency High-impact Events, Including Fatalities 2 RT Improving Project Progress and Performance Assessment2 RT Finding Leading Indicators to Prevent Premature Starts11 RT Future Construction Needs of Virtual Design Models2 RT Best Practices for Succession Planning41

CII Research Team Staffing Research Team Owner Need Contractor Need RT Can We Utilize Next-Gen Experience to Maximize Virtual Team Performance? 6 RT The Role of Frontline Supervision in Improving Construction Productivity and Performance 2 RT Assessing the Maturity and Accuracy of FEED to Support Phase-gate Approvals 1 RT Measuring the Productivity of Model-based Engineering8 RT Best Practices for Preventing Out-of-sequence Construction Activities and Minimizing their Impacts 5 RT Improving the U.S. Workforce Development System6

The Community Safety Advanced Work Packaging Sustainability Globalization Information Management Front End Planning Next-Generation Leaders Risk Management Quality Management Federal Facilities Delivery Modularization Project Controls

2014 SAFETY PERFORMANCE

Location Total Work-hours: 3,197,829,820

TRIR Rates TRIR=0.42  13% increase in TRIR

DART Rates No significant change in DART

Fatalities * Three fatality cases were reported without the corresponding work-hours and, therefore, were not included in the fatality rate.

Fatality Rate by Location

CII OWNER & CONTRACTOR PARTNERSHIP

FEP Phase Cost Growth by CII Partnership – Industrial Projects p-value= % absolute difference 8.9% absolute difference p-value=0.089 ContractorsOwners

PDRI Score by CII Partnership – Industrial Projects (Owner and Contractors) p-value = % improved PDRI score