AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 262025 WP8 – Improvement and.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA H2020 Open Meeting,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
ARDENT Advanced Radiation Dosimetry European Network Training initiative WP1: Gas Detectors S. Rollet.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
MICE CMPB Alain Blondel 1 Highlights on MICE.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
Status Michael Moll CERN PH-DT Contents: WP8 – Task overview Status of tasks Status of Milestones and Deliverables AIDA 1 st Annual Meeting, DESY, Hamburg.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
14.4. Readout systems for innovative calorimeters
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Test beam results of MCz-Si detectors
Claudia Cecchi University of Perugia and INFN
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
WP8 – Improvement and equipment of irradiation beam lines
Towards a Unified Environmental Monitoring,
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
Report on EUCARD WP6: MICE Transnational Access (TA)
EU Institution Board 1 representative of each participating institute
IRRAD Facility Infrastructure Upgrade
A High Intensity Neutrino Oscillation Facility in Europe
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and equipment of irradiation beam lines Giovanni Mazzitelli & Michael Moll LNF,INFN, Italy CERN, PH, Switzerland AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 1 Contents:  WP8 – Task overview  WP8 – Status of tasks  Summary  Annex: Table on status of milestones and deliverables color code: ✓ done; ✓ in progress; ✓ seriously delayed; ✓ on schedule

WP8 – Task overview AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 2 WP8 – tasks and task leaders 8.1.Coordination and CommunicationCo-leader: Giovanni Mazzitelli (INFN LNF) Michael Moll (CERN) (gm) (mm) 8.2.Test beams infrastructure at CERN and Frascati CERN Frascati Leader: Ilias Efthymiopoulos (CERN) Leader: Giovanni Mazitelli (INFN-LNF) (gm) 8.3.Upgrade of PS proton and neutron irradiation facilities at CERN Improvement of irradiation facilities and evaluation of upgrade proposals Common infrastructure for the facilities Leader: Michael Moll (CERN)(mm) 8.4.Qualification of components and common database Review existing data and experience from LHC, define test program Define test procedures and conduct tests on selected components Set-up and publish a WEB database compiling the information above Leader: Simon Canfer (STFC)(mm) 8.5.General infrastructure for test beam and irradiation lines Commission and operate beam tracking telescope TASD and MIND GIF++ user infrastructure Leader: Hanno Perry, Igor Rubinsky (DESY) Leader: Paul Soler (STFC) Leader: Davide Boscherini (INFN Bologna) (gm) (mm) 8.6.Coordination of combined beam tests and common DAQ Common test beam experiments at CERN and DESY Common DAQ Leader: Ties Behnke (DESY) Leader: David Cussans (Uni Bristol) (mm) (WP9)

AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 3 Test beams infrastructure at CERN and Frascati Task CERN Frascati

Task Test beams infrastructure at CERN AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 4 Status and future work specifications for the beamline are fixed (see milestone report) Target FLUKA simulation beamline design for the 2 chosen layouts beamline simulation with FLUKA produce table with expected rates for the experiment produce final report by end of June 2013 Status of Milestones & Deliverables ✓ MS27 [m12] “Specification of beamline” done ✓ D8.3 [m26] “Design of beamline finished” delayed - expected in June 2013 (3 months delay) - reason for delay: late hiring of student performing the calculations for the study ENDED

Task Test beams infrastructure at Frascati AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 5 The Task can be considered closed: all the milestone foreseen as been reached and only the integration of the of new device is still in progress: design and put in operation a remotely controlled trolley for detector test equip the BTF with a GEM chambers for monitoring with a resolution of about 100 μm high resolution device equip the BTF with LYSO calorimeter as monitor the beam energy DAQ interface complete and available for users. The deliverable report is submitted for review of AIDA Coordinator and WP8 Coordinator Status of Milestones & Deliverables ✓ D8.9 [m48] is on schedule and deliverable document is submitted CLOSED

AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 6 Upgrade of PS proton and neutron irradiation facilities at CERN Task Improvement of existing irradiation facilities and evaluation of upgrade proposals Common infrastructure for the facilities

Task Improvement of existing irradiation facilities and evaluation of upgrade proposals AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 7 Status and future work ✓ Excellent progress during 2012 ✓ Upgrade project “officially” started in November 2012 ✓ Construction and Commissioning of new facilities done July 2013 to December 2014 – be ready to perform proton irradiations at end of Long Shutdown (LS1) Status of Deliverables & Milestones ✓ D8.4 [m37] “Complete the design of the facility” ended ENDED

Common infrastructure for the facilities AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 8 Conclusion and actual status ✓ Movable irradiation tables and cold boxes designed, constructed, tested and operational ✓ absolute fluence monitor designed, constructed and tested (operational!) ✓ optimization of fluence monitor is in progress (temperature stabilization and possibility to scan samples for beam profiling) Milestone/deliverable status: ✓ MS31 [m26] “Movable irradiation tables operational” has been achieved;. ✓ MS35 [m34] “Installation of cold boxes and fluence monitor” done, milestone report to be done ✓ D8.10 [m48] “Equipment fully operational” is on schedule Commissioning of facility ongoing now To do!!

AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 9 Qualification of components and common database Task Review existing data and experience from LHC, define test program Define test procedures and conduct tests on selected components Set-up and publish a WEB database compiling the information above

Task Review existing data and experience from LHC, define test program AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 10 ✓ Review existing data and experience from LHC, define test programme - achieved; See AIDA-D8.1 document on CDS ✓ The plans for upgrading ATLAS and CMS have been reviewed and summarized. ✓ Radiation tests are advanced for some detector elements such as silicon detectors. ✓ Other elements, such as glues necessary to make a practical detector structure, are less well characterized and are expected to form part of a radiation test plan ENDED

Task Define test procedures and conduct tests on selected components AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 11 Conclusion and actual status ✓ Test procedures and tests on selected materials & components started; ✓ Report on definition of test procedures written ✓ Campaign of irradiation of more than 16 different electronics devices on 2013 Milestone/deliverable status: ✓ MS30 [m20] “Definition of test procedure” achieved ✓ MS32 [m26] “first results on selected components” has been achieved Closed!

Task Set-up and publish a WEB database compiling the information above AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 12 Conclusion and actual status ✓ WEB database produced and online “IMHOTEP” ✓..filling of database ongoing Milestone/deliverable status: ✓ D8.7 – [m48] “populated database” is on schedule To do!!

AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 13 General infrastructure for test beam and irradiation lines Task Commission and operate beam tracking telescope TASD and MIND GIF++ user infrastructure

Task Commission and operate beam tracking telescope AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 14 ✓ After the end of the SPS test beam period 2012 the basic version of the EUDET/AIDA telescope was relocated to DESY. ✓ During the extended shutdown of SPS until 2014 the telescope will stay at DESY to be available for AIDA transnational access users as well to work on the upgrade of the telescope towards the final AIDA telescope. ✓ Telescope is now at CERN with the core functionality [EUDAQ2 + miniTLU + Offline Software] ✓ D8.5 – [m40] “Installation of tracking telescope” is on schedule (built in WP9.3) ✓ MS36 – [m44] “Commissioning of tracking telescope” in on schedule 50% of transnational access users requires the AIDA telescope Telescope built during the FP6-EUDET project that AIDA is maintaining and operating both at DESY/CERN test beam CLOSING…

Task TASD and MIND AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 15 Conclusion and actual status ✓ Design of MIND and TASD done ✓ component choices made (plastic scintillator, WLS fiber, optical glue); ✓ TASD installed and tested at RAL ✓ Baby-MIND design and under constriction ✓ Baby-MIND now recognised as one of the Neutrino Platform activities at CERN (2014) Milestone/deliverable status: ✓ MS28 [m20] “TASD & MIND design” done ✓ MS33 [m36] “TASD & MIND installation” on schedule ✓ D8.11 [m48] “neutrino telescope test & results” on schedule (need for appropriate beam line for testing the detectors) CLOSING…

Status and future work ✓ Detectors ✓ setup for beam and cosmic trackers done ✓ detectors for beam tracker already constructed ✓ detector for cosmic tracker to be constructed within this year ✓ electronics for all detectors being developed ✓ DCS ✓ baseline design available (CAEN Easy, other ; PVSS; GUI) ✓ cost estimation is in progress ✓ DAQ ✓ several systems are being considered ✓ a final decision is underway Status of milestone & deliverables ✓ MS29 [m20] “GIF++ design” done ✓ D8.6 [m48] “Detectors and detector control systems operational” on schedule Task GIF++ user infrastructure AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 16 To do!!

AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 17 Coordination of combined beam tests and common DAQ Task Common test beam experiments at CERN and DESY Common DAQ (moved to WP9)

Task Conclusion AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll 18 Status and future work ✓ Trigger & tracking telescope, W-stack and Fe-tailcatcher successfully used again in ✓ Extensive beam tests performed with several HCAL technologies. ✓ General information and documentation system is getting into shape. ✓ Implementation EDMS web site is in progress ✓ Feeding the EDMS systems with the relevant documents is underway Status of deliverables and milestones ✓ MS34 [m36] “Test beam, EDMS and DAQ commissioning” EDMS part done WP8 part done!!

WP8 - Milestones AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll MS27Specification for beam line fixed CERN (1)m12 Jan 2012 Final specification for the design study in task 8.2. (Task 8.2.1) o.k. MS28Design of TASD and MIND STFC (31)m20 Sept.2012 Design for deliverable D8.11 (Task 8.5.2) o.k. MS29Design of GIF++ infrastructure INFN (18)m20 Sept.2012 Detailed design ready for the cosmic ray tracker, the radiation measurement facility and the DCS (Task 8.5.3) o.k. MS30Definition of test procedure and specification STFC (31)m20 Sept.2012 Common agreement of how tests for materials will be conducted and which components to test (Task 8.4) o.k. MS31Installation of new equipment CERN (1)m26 March 2013 Movable irradiation tables operational (Task 8.3.2) CERN, UK o.k. MS32First test results on selected components STFC (31)m26 March 2013 Intermediate result with respect to D8.7 (Task 8.4) o.k. MS33Installation of TASD and MIND STFC (31)m36 Jan.2014 Installation at CERN for deliverable D8.11 completed (Task 8.5.2) TASD: o.k. MIND: Expect 12/2014 MS34Test beam, EDMS and DAQ commissioning DESY (9)m36 Jan.2014 Intermediate stage for deliverable D8.8 (Task &2) EDMS, o.k. DAQ  WP9 MS35Installation of infrastructure (34)m37 Feb Cold boxes and Fluence monitoring system operational (Task 8.3.2) CERN, UK, VU Delayed, expect: end November MS36Commissioning of tracking telescope DESY (9)m44 Sept.2014 Start of operation of telescope delivered in D8.5 (Task 8.5.1) Expect: November 19

WP8 - Deliverables AIDA Final Meeting, , CERN - G.Mazzitelli & M.Moll D8.1 Experience at LHC and definition of test programme: Based on the experience and expectations for the LHC test programme is defined and described in a document. [month 12] Jan Task 8.4 o.k. D8.2 Publication of specification documents for the DAQ and for the central documentation facilities: Description of common infrastructures and interfaces for the linear collider test beams. [month 20] Sept Task &2 o.k. D8.3 Design study on low energy beamline: Design and implementation study on a low energy beam to the range of 1 (or possibly less) to 10 GeV [month 26] March 2013 Task CERN o.k. (9m delay) D8.4 Upgrade scenarios for irradiation lines: Design study on new or upgraded irradiation facilities at CERN based on slow extracted proton beams. Containing a proton and – if feasible – a mixed field irradiation facility. [month 37] Feb Task CERN o.k. D8.5 Installation of tracking telescope: The tracking telescope is installed in the beam line and operational. [month 40] May 2014 Task Delayed October D8.6 Detector and detector control system operational: Cosmic ray tracker including front end electronics, power and gas systems. Detector for radiation measurement. Detector Control System monitoring the tracker working and the environment parameters. [month 44] Sept Task Work on report started D8.7 Populated data base of components qualification: The materials and components database is online and populated with data. [month 46] Nov Task Work on report started D8.8 DAQ performance and test beam utilization: Report on the performances and use of the integrated DAQ setup, and of the common test beam facilities at DESY and CERN [month 46] Nov Task 8.6 1&2  WP9 D8.9 Performance of beamline and infrastructure: Report on performance of beamline and infrastructure including GEM based beam profile and tracking detector [month 48] January 2015 Task Frascati Document ready for AIDA review D8.10 Commissioning of new facility equipment: Report on commissioning of shuttle systems, movable irradiation tables with cold boxes and a fluence monitoring system based on a microwave absorption technique in silicon. [month 48] January 2015 Task CERN, UK, VU Operation to start in 11/14 D8.11 Infrastructure performance and utilization: TASD and MIND are constructed and tested for their performance. [month 48] Jan Task