LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

ISIM Integration & Test Mike Drury JWST-PRES
ICRA Panel System Installation Instructions
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
Integration and Test 14 October 2008 Martin Nordby.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
GLAST Large Area Telescope:
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectThermal-Vacuum STE Status Review, September LAT Environmental Test Planning 7-8 September 2005 LAT Thermal-Vacuum Test Plans LAT.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectEnv Test Planning,15 March 2005 LAT System Engineering 1 LAT Thermal Vac EGSE Cabling.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
SBN Far Detector Installation & Integration
SPP FIELDS V1234 Thermal PSR
GLAST Large Area Telescope:
Environmental Test Planning
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Cryomodule Assembly Plan
LAT Environmental Test Planning and Design Review
SNS PPU Cryomodule Thermal Shield
Bunker Wall Design Wall ESS
Design Integration and Analysis
Presentation transcript:

LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration Martin NordbyMike FossRich Bielawski

LAT Environmental Test PDR2 GLAST LAT Project3-4 May 2005 Test Configuration Assembly LAT is supported off of TIP and Test Stand during T-Vac testing –Lower Extension Beams serve as feet for supporting cantilevered load –Support does not require a moment- bearing connection to the T-Vac trolley –Upper Extension Beams are used to hoist the LAT on the trolley, then are removed SC simulator sink plates fit –Top deck sink plate slips between X- LAT Plate and TIP –Y-side simulators slide between inside of Radiators and Test Stand –Both are support off the TIP/Test Stand Sink Plates and infrared heater cages are mounted around the outside of the LAT after it is on the trolley –These could mount to the Test Stand or be free standing All thermal STE relies on radiative cooling from the chamber cold shrouds LAT on Test Stand in T-Vac Configuration Lower Extension Beam Radiators mount to the LAT prior to rolling over Test Stand has been designed to provide clearance for STE sink plates

LAT Environmental Test PDR3 GLAST LAT Project3-4 May 2005 Test Configuration in the Thermal-Vacuum Chamber LAT rolls into the chamber on a table –Table rolls on V-groove casters off a trolley on the floor of the building –Issues being addressed Load rating of table and rails Load rating of trolley Preferred method to roll LAT into chamber and control motion Confirm LAT height with respect to building beam outside chamber Orientation of the LAT in the chamber has not been finalized –Radiators-first (as shown): allows easy access around ACD to integrate sink panel –ACD-first: provides clear access to route cable and add MLI blankets  this is the likely one LAT in “Big Blue” chamber Chamber table rolls LAT into position on rails from trolley outside Port plates for LAT feedthroughs View from Door Opening

LAT Environmental Test PDR4 GLAST LAT Project3-4 May 2005 MGSE/STE for Thermal-Vacuum Testing The table below lists all known mechanical and thermal MGSE/STE needed for T-Vac testing –Still missing MGSE MLI blankets  once flight design is finalized, test blanket design will lay out quickly –Does not include equipment to move LAT or rigging  being worked as part of facility support LAT in T-Vac Chamber Concept for sink plates and support frame Trolley for moving LAT and rolling it into chamber List of MGSE/STE Needed for T-Vac Testing

LAT Environmental Test PDR5 GLAST LAT Project3-4 May 2005 MGSE Requirements Flowing from Thermal-Vacuum Testing Test Interface Plate –Accommodates installation of a SC top deck sink plate between TIP and X-LAT Plate –Handle LAT loads when horizontal, plus thermal stresses due to temp variations Test Stand with Extension Beams –Supports LAT in horizontal configuration during hoisting, transport, and on T-Vac trolley –Capable of leveling the LAT to an accuracy of 0.1 degrees in both principal axes –Functions over temp range of –TBD to +TBD degC while maintaining angular stability of LAT to within +/- 0.1 degrees –Extension Beams compatible with T-Vac trolley mounting and floor loading capabilities –Includes active heating to stabilize average temps –Accommodates installation of, and supports SC simulator sink plates between Test Stand and back side of Radiators –Design and construction compatible with cleanliness needed for T-Vac Spreader Bars –Each bar designed to carry entire load of LAT in T-Vac configuration –Two spreader bars are identical and interchangeable –Capable of lifting LAT in vertical or horizontal configuration –Capable of rotating LAT 90 degrees using only two crane hooks SC Strut Simulators –Provide flight-like interface and load paths to simulate SC struts that support Radiators –Interface with Radiator at flight interface, and with Test Stand

LAT Environmental Test PDR6 GLAST LAT Project3-4 May 2005 MGSE Requirements Flowing from Thermal-Vacuum Testing (cont. 1) Dust Tent –Capable of providing clean, dry environment before and after T-Vac testing –Designed to be dis-/re-assembled around tipped-over LAT inside T-Vac chamber Chill Bars and Auxiliary Cooling –Designed to be dis-/re-assembled from Grid wing before/after T-Vac test to support open- door CPT testing in air –X-LAT auxiliary cooling lines designed to be blown clean prior to T-Vac to prevent unnecessary offgassing of remaining working fluid –Working fluid should not be a contaminant for T-Vac (otherwise X-LAT aux cooling lines will need to be capped)

LAT Environmental Test PDR7 GLAST LAT Project3-4 May 2005 STE Requirements Flowing from Thermal-Vacuum Testing (cont. 2) ACD Equivalent Sink Plates –3 plates independently heated to provide equivalent sink temp for +Z, +X, and -X ACD faces –Passively cooled by large view factor to cold shroud (including underside plate): requires high-emissivity surfaces and over-sized geometry to achieve adequate VF –Low mass to speed heating/cooling rates –Capable of accommodating thermal stresses due to internal temp gradients and externally-imposed loads from support frame ACD Sink Plate Support Frame –Support ACD sink plates –Provide thermal isolation of sink plates from each other and from support structure –Minimize thermally-induced loads applied to sink plates due to differential temps between frame and plates –Open frame to maximize view of sink plates to shroud –Designed to function at shroud temperature SC and Top Deck Simulator Sink Plates –Capable of being installed around LAT/Radiator/TIP/Test Stand assembling without any de-integration of hardware (likely requires that sink plates come in multiple pieces) –Passively cooled by view factors to cold shroud: requires high-emissivity surfaces and over-sized geometry to achieve adequate VF –Each of the 3 plates is thermally isolated from its neighbor and the Test Stand –Each of the 3 plates is actively heated on an independent heater circuit –Low mass to speed heating/cooling rates

LAT Environmental Test PDR8 GLAST LAT Project3-4 May 2005 STE Requirements Flowing from Thermal-Vacuum Testing (cont. 3) Radiator and ACD Y-Side Heaters –Cartridge heaters are small to reduce view factor from Radiators –Heaters are low mass to speed heating/cooling rates –High emissivity surfaces Heater Cages –Supports cartridge heaters –Thermally isolates heaters –Accommodates large temp range of heaters –Capable of functioning down to shroud temperature –Provides blinders, baffles, and MLI blanketing to block view of heaters to other sink plates and thermal surfaces –Self-supporting off trolley floor

LAT Environmental Test PDR9 GLAST LAT Project3-4 May 2005 STE Heating and Cooling Thermal test equipment along with the chamber cold shroud provides the equivalent sink temperatures needed to simulate the on-orbit radiative environment for all external surfaces of the LAT Heating is provided by resistance heaters –Cartridge heaters for Radiator and Y-side ACD control zones –Strip heaters on sink plates for +Z, +/-X sides of ACD, insides of Radiators, and underside of X-LAT Plate –Strip heaters mounted to the Test Stand to keep it at nominal LAT temperatures Cooling is purely passive radiative cooling to the chamber cold shroud –No GN2/LN2 circuits needed (TBR) Rad +Y SC +Y SC +Z SC +Y Rad +Y ACD -Y ACD +Z ACD +Y ACD -X ACD +X STE Heater Circuits

LAT Environmental Test PDR10 GLAST LAT Project3-4 May 2005 Heater Zones and Power The table below shows preliminary estimates for power needs for all control zones –This will be updated prior to releasing the Test Plan  good numbers are needed to finalize feedthrough requirements for the chamber and scope max power for power supplies –Updated values will be generated as part of final pre-test analyses STE Heater Circuits and Power Requirements (TBR)

LAT Environmental Test PDR11 GLAST LAT Project3-4 May 2005 T-Vac Electrical Configuration Diagram

LAT Environmental Test PDR12 GLAST LAT Project3-4 May 2005 EGSE Cable Layout

LAT Environmental Test PDR13 GLAST LAT Project3-4 May 2005 Mechanical Handling Handling and mechanical operating procedures –LAT lifting procedure –LAT roll-over procedure –Test Stand handling and operating procedure –Dust tent handling and operating procedure –LAT auxiliary cooling system operating procedure Contamination control and cleanliness –We are just starting to work through these issues seriously, now that the basic MGSE, EGSE, and thermal configurations are understood –Issues to work High-bay cleanliness: this is not a clean room  what are our cleanliness requirements and how will we implement them MGSE/EGSE bake-out: we will need to bake out hardware going into the T-Vac chamber, but the spec’s on what needs to be done and the logistics of doing it have yet to be worked

LAT Environmental Test PDR14 GLAST LAT Project3-4 May 2005 Issues for Thermal-Vacuum Testing T-Vac Test Plan –This has barely started to stabilize, and there are still many TBX’s Preliminary design of thermal STE –Sink plates and infrared heater cages need to be designed to confirm that Test Stand and in-chamber layout is adequate –System needs to be sized so we can buy feedthroughs, power supplies, and close out other options that we are attempting to hold open (TCU, LN2 boil-off) Preliminary pre-test analyses –We have run some simplified cool-down scenarios, but none using actual chamber and STE thermal designs –This needs to be done to confirm that our current thermal design works –Also needed to check lines of sight and establish where blinders and MLI needs to go to block incidental IR heating coming from heater cages –This also will finally give us a good estimate of projected cool-down and warm-up times, including time-to-balance  this is needed before we can work on LAT functional test scenarios during transitions EGSE cabling –What issues list isn’t complete without this topic? –Feedthroughs are nearly spec’d out –Next step is to spec cable lengths and start cable design (both inside and outside chamber) –Also need to work details of cable installation and check-out

LAT Environmental Test PDR15 GLAST LAT Project3-4 May 2005 Conclusions Thermal-vacuum test planning has advanced considerably over the past four months –We have a working Test Plan that is getting close to ready for release T-Vac MGSE and STE designs and concepts are plausible, and work with the key MGSE Test Stand and TIP hardware EGSE cabling and feedthrough plans are nearly finalize and feedthrough orders will be placed soon Requirements for EGSE crates are almost fully defined and the EGSE meets them We have progressed considerably in the past few months, but have many details to work out still