Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE.

Slides:



Advertisements
Similar presentations
Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
Advertisements

1 ACACSO Nov 2009 LCS Rule 15 Enhancements. 2 Rule 15 Definition Rule 15 is the transfer of car hire liability due to a road’s inability to accept railcars.
1 Car Hire Rules 7 & 8 – After DDCTS Goes Live ACACSO – November 11, 2010 Tempe, AZ.
1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Industry Initiatives: What is Railinc.
Introduction DEFINITION OF MILEAGE EQUALIZATION MILEAGE ADJUSTMENTS
Line Item Accounting Eaglesoft 16.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
ACACSO – New Orleans, LA May 11, 2012 Lynn Brown LB Rail Consultant, Inc. 1.
Car Hire The Hidden Expense ACACSO – Tempe, AZ November 12, 2010 Lynn Brown LB Rail Consultant, Inc.
TOL’s All You Need to Know ACACSO, Austin TX Nov 10 – 12, 2014
Car Hire Rule 5 and Car Hire Rule 15 Transfer of Liability © 2007 Railinc. All rights reserved.
N Madison Yard Wiggins 2 Yard CSXT NS A L S UP BNSF Merchants Bridge MacArthur Bridge NS BNSF UP MRS Wiggins 5 Yard KCSUP NSBNSFKCSUP Gateway Arch CMR.
Car Hire Claims Workshop 101 November 13, AGENDA 8:30 to 8:45 Introductions & Attendance 8:45 to 9:00 AAR Certification on Car Hire Claims Discussion.
Union Pacific Railroad Future Car Accounting Process Linda Newell - Gen Dir ECommerce, Mike Carmichael - Sr Mgr Car Acctg, Lori Wies - Mgr Car Acctg May.
RAILINC I ACACSO
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Railinc Vision of the Future of Car Hire Mark Aldenderfer, Business Analyst ACACSO November 12, 2010.
©Railinc 2008 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Update on Umler/EMIS.
RAILINC I ACACSO
1 Railroad Clearing House for Car Hire ACACSO May 7, 2008 Chicago, Illinois Anthony Glover.
Damaged and Defective Car Tracking ACACSO May 12, 2010 © 2010 Railinc. All rights reserved.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
November  Cary, NC Oct. 4, 2011  Next meeting is in January via Conference Call.
Umler Project Status for ACACSO May 14, 2009 Full speed ahead towards the July 25 th implementation Full speed ahead towards the July 25 th implementation.
EAC Update for ACACSO November 2012 George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation.
RAILINC I ACACSO
Advanced Accounting Information Systems Day 20 Control and Security Frameworks October 9, 2009.
UMLER ISSUES THAT AFFECT CAR HIRE ACACSO Meeting November, 2014 Patty Livingston Manager Fleet Administration Genesee & Wyoming Railroad Services.
EAC Update ACACSO May 12, 2010 George A. Jones Project Update Damaged & Defective Car Tracking (DDCTS) – Work has begun on the 2010 project to complete.
Rule 22 Automation Update ACACSO – Austin, TX November 2014.
PPMS Spring User Group Meeting 5/30/2012 Presented by Susan Engel.
EAC Update for ACACSO May 2012 George A. Jones – Dir. Car Accounting CSX.
Mike Partica November 13th, 2008 Orlando, Florida The Future of Car Hire.
RAILINC I ACACSO
©Railinc 2010 All Rights Reserved Car Accounting Self Service Project Mark Aldenderfer, Business Analyst II 1.
September 14, 2015 Susan Wilson Commitment Accounting.
Damaged and Defective Car Tracking System - Update Dale Cassels - CSX ACACSO November 12, 2008.
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
©Railinc 2010 All Rights Reserved Car Hire and DDCT Mark Aldenderfer, Business Analyst 1.
©Railinc 2010 All Rights Reserved Car Accounting Self Service (CASS) ACACSO New Orleans May 9-12, 2012 Mark Aldenderfer Railinc Business Analyst II 1.
RAILINC I ACACSO
ACACSO Workshop Car Hire Rule 22 November Memphis, Tennessee J. D. Pavek The Greenbrier Companies.
UMLER ACACSO Meeting May 10 th, 2012 Patty Oakley Manager Fleet Administration Genesee & Wyoming Inc.
RAILINC I ACACSO
LCS Report Card Mike Partica May 2008 Chicago, Il.
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
Goals of this Session: Updates from August 2011 and upcoming release Job action and potential yearend problems Yearend/Year Start Things to Remember Other.
TRAIN II Event Reporting Association of Car Accounting & Car Service Officers May 11 – 13, 2011 Burlington, VT.
RAILINC I ACACSO
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
1 © 2013 Railinc Corp. All rights reserved. R ECAP OF THE C AR H IRE R ULES ACACSO Workshop/Breakout Session Albuquerque, NM November 11 & 12, 2015.
DDCT Running Repairs Program Maintenance
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
Car accounting self service Overview
Centralized Car Hire Foundation User Support Project
Liability Continuity System (LCS) Update
DDCT and How it Affects Car Hire
Jackie Singer CN System Manager – Business Process Optimization
Event Repository Reporting
Car Hire Data Exchange (CHDX) Edits Project Update
Suppressed Interchanges & Haulage
What Happens to Private Railcars – Follow-Up to Savannah
Antwan Dozier ACACSO May , 2018
ACACSO May 10, 2018 Kellie Bates Norfolk Southern
Liability Continuity System (LCS)
Damage Defective Car Tracking (DDCT) System
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
TRAIN II Jim Pinson ACACSO May 9, 2014.
Interchange Presenter: Lisa Butts Watco Companies.
Presentation transcript:

Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE

Why do we need improvements? To boldly go where no one has gone before

Not even Car Accountants

History LCS was implemented in 1999 with the intent of eliminating all car hire time claims. What happened was not all roads were created equal… –some used all messages and others used changes only. –Since each road tended to “interpret” the LCS messages this caused a lot of situations in which the LCS records were not able to match. –Claims continued

And you pretty much have a recipe for disaster. Well, disaster is probably a little strong but definitely some of the challenges that we all face today is with the variations in train reporting. Haulage agreements Running rights agreements A little dash of suppressed interchanges Transfers of liability Rule 15 An Interesting Mix

-This led the LCS Tag to ask Railinc to begin a project to improve LCS in order to allow roads to accurately and easily calculate car hire liability. -This will lead to more timely settlement and accuracy of car hire settlements with less exceptions. Adapting LCS to today’s business

Current StateFuture State LCS considers shop time to be in the handling carriers account even though an interchange had been reported to SHOP. LCS will consider shop time to be in the car owner’s account. Rule 5 and 15 TOLs can overlap potentially causing car hire to be paid incorrectly by the carriers. Railinc will ensure that Rule 5 switches and Rule 15 offers will not be allowed to overlap with a new edit for Rule 5 A road can make an Offer and the other road can report receiving the car prior to the Offer. This results in a valid Offer message to the road that already has the car. Offers and LCS are coordinated to ensure clear and accurate continuity of liability. Recommended Areas Needing Change

CurrentFuture Inhibited/suppressed interchanges are reported using a Train31 message. These interchanges can be in conflict with other interchanges causing incorrect car hire calculations. LCS will use a new table to properly govern and prioritize inhibited interchanges LCS sends multiple type E messages because of the Changes Only option currently present in the application. This results in excessive messages being sent which may lead to confusion when calculating liability. LCS type E messages will be sent only when required. Haulage and Offer reporting conflicts and does not allow for proper allocation of car hire between carrier and haulage right carriers. Example: Haulage movement carrier offers to another carrier. LCS and the Offer process will be coordinated and will ensure that car hire is properly transferred. LCS will generate an “F” (fixed) interchange to maintain continuity. Recommended Areas Needing Change

CurrentFuture Rule 15 Offer may have no specific ending transaction and consequently a car may stay in a road’s account for an excessive period of time. The Offer and LCS process can cause 2 roads to pay for the same car. Example: Car offered to Road A and delivered to Road B. LCS will terminate Rule 15 Offers after 60 days or when the load/empty status changes. LCS will generate appropriate interchanges to ensure that Offer and LCS records are coordinated to ensure proper liability. LCS does not clearly mark the beginning and ending of Haulage. It is not possible to use LCS messages to determine liability due to Haulage. LCS clearly marks Haulage beginning and end. Cars are restencilled and new cars become active. There is no flag in LCS to indicate the old car has become active and may result in a duplicate payment. LCS will prompt users that an old car had been restencilled so proper investigation can be done. Recommended Areas Needing Change

CurrentFuture Multiple LCS records can occur at the same date, hour and minute potentially causing car hire to be paid incorrectly by the carriers. Additional information (example: sequence number) will be created to allow carriers to sort these records properly. In the case of Haulage moves with multiple haulage movement carriers, LCS requires each haulage movement carrier to report properly. LCS will use table logic to correctly assign liability even if Haulage movement carriers report regular interchanges LCS does not gap cars out of a road’s account if the car was in “suppressed interchange status”. Acar will get gapped out of a road’s account if in suppressed interchange status on the first of 3 consecutive moves. Recommended Areas Needing Change

Questions?