1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.

Slides:



Advertisements
Similar presentations
Integrated Product Team (IPT) Process Training
Advertisements

TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
DoD Integrated Product Support Roadmap Tool
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
11 A presentation on A-16 Themes for The FGDC Steering Committee June 5, by Wendy Blake-Coleman US EPA Lifecycle Management Work Group.
OASD Logistics and Materiel Readiness
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
1 Program Assists Jess Stewart March 19, Program Startup Workshops Calendar 08/09 Activities Calendar 08 Workshops (prototype new workshops) –JTRS.
Progress on Coordinating CBP and Federal Leadership Goals, Outcomes, and Actions Principals’ Staff Committee Meeting 2/16/12 Carin Bisland, Associate Director.
1 Nunn-McCurdy Unit Cost Reporting NDIA PMSC Meeting August 15-16, 2006.
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
Guidance Roadmap Target Affordability and Control Cost Growth -Mandate affordability as a requirement -Implement “should cost” based management -* AT&L.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Materiel Development Decision (MDD) Information Requirements
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
FY12-14 Life Cycle Logistics DAWIA Certification Requirements Overview and Life Cycle Logistics Competency Validation Status Update Life Cycle Logistics.
LIFE CYCLE LOGISTICS FUNCTIONAL IPT ( LOG FIPT) Mr John Baranowski, Acting DASD(MR) ODASD(MR) Oct 2011.
Reduce Total Ownership Cost (R-TOC) PURPOSE: The R-TOC program is to achieve readiness improvements in systems by improving the reliability of the system.
Business, Cost Estimating & Financial Management Considerations
MIL-HDBK-502A, “Product Support Analysis”
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
MDD to Milestone A Requirements Management Activities
DAG Chapter 4 Systems Engineering Design Considerations
ISA 201 Intermediate Information Systems Acquisition
Revision reflects an evolution, not a revolution
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
DoD Integrated Product Support Implementation Roadmap
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Acquisition Process Model (APM) Update
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
POLICY, CONTRACTING AND SYSTEMS ENGINEERING SUBCOMMITTEE
POLICY, CONTRACTING, SYSTEMS ENGINEERING, and EDUCATION SUBCOMMITTEE SUMMARY PSMC Meeting April 20 – 23, 2010 LMI, McLean, VA.
The Department of Defense Acquisition Process
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Presentation transcript:

1 1 Defense Acquisition Guidebook Progress Update March 27, 2012

Many Key Policy/Business Process Changes since WSARA Better Buying Power Memos Changes to Statute Since WSARA Should Cost/Will Cost Memos Revisions to the AS/TDS/SEP/LCSP/PP Outlines Revisions to Technology Readiness Assessment Process Improving Milestone Process Effectiveness Memo DTM Requirements for Life Cycle Management and Product Support Other Approved DTMs More detailed WSARA Implementation Guidance Etc. 2 These and other changes to policy/business practice argued for an update to the DAG

Policy Changes since WSARA 3 USD(AT&L) September 14, 2010 and November 3, 2010: Better Buying Power Memos Establish, and Manage to, Affordability Targets/ Requirements Perform Systems Engineering Trade-off Analysis Drive Productivity growth through Will Cost/Should Cost Management Manage Production Rates Set Shorter Program Timelines Promote Real Competition Competitive Acquisition Strategies Remove Obstacles to Competition Open Systems Architecture and Rules for Acquisition of Technical Data

Policy Changes since WSARA 4 PDUSD(AT&L) Document Streamlining Memorandums Program Strategies and System Engineering Plan (April 20, 2011) Program Protection Plan (June 18, 2011) Life-Cycle Sustainment Plan (September 14, 2011) Provide guidance and templates for document preparation Content re-focused Descriptions minimized Data emphasized to support effective program planning and management decisions

A Phased Process Phase I – Process Guidance: Assess chapter revisions necessary to align with approved policy/business practice Design a plan of action for each chapter Chapter editors coordinate with each other Do not establish new policy Finalize all chapters (in process) Publish (online) full update (targeted April 30 th ) Phase II – Things we must do later: Update based on approved DoDI (in draft—waiting for acting USD(AT&L) permission to begin informal coordination) Update based on other approved policy/business practice 5

Guidebook Chapters 1. DoD Decision Support Systems 2. Technology Development Strategy/Acquisition Strategy 3. Affordability & Life-Cycle Estimates 4. Systems Engineering 5. Life-Cycle Logistics 6. Human Systems Integration 7. Acquiring IT, including National Security Systems 8. Intelligence, Counterintelligence, & Security Support 9. Test & Evaluation 10. Decisions, Assessments, & Periodic Reporting 11. Program Management Activities 6

DAG Chapter 2 Update Total Rewrite TDS and AS content re-structured as approved by PDUSD(AT&L); becomes backbone of the chapter LCSP becomes a separate document; addressed in Chapter 5 APB content moved to DAG Ch 10 Driving DAG Ch 2 change: WSARA; NDAA FY11 §812, §813 & §814; Better Buying Power memos; AT&L Memos & DTMs: 6/3/11 (T&E); 5/11/11 (TRA); 4/22/11 (Should Cost); 3/21/11 (Reliability DTM); 10/18/10 (Space Systems DTM); 8/20/10 (AS); PD,USD(AT&L)-approved AS/TDS outline; Approved LCSP & PPP outlines; and Other

DAG Chapter 10 Update Significant and Extensive Changes Changes in statute, policy and business practices ripple across broad content of Chapter 10 Better Buying Power Memos Changes to Statute Since WSARA (including multiple NDAAs) Expanding implementation of business practices supporting WSARA policy changes Should Cost/Will Cost Memo Revisions to the post-CDR assessment process Revisions to Technology Readiness Assessment Process Improving Milestone Process Effectiveness Memo (In Final Draft) OIPT Roles & Responsibilities Memo (in draft) Example Focus Areas Incorporate APB content from Chapter 2 Update Executive Reviews (e.g., add DPMs & DRMs) Role of IPTs ; roll forward relevant information from old “Rules of the Road” document Role of Independent Assessments (e.g., update re: May 11, 2011 TRA memo & link to new TRA guidebook (2011 vs. 2009); update post –CDR reporting to reflect Feb memo; include PARCA assessments) Information Sharing & DoD Oversight (e.g., update DAES section; add sections on tracking to MS A program cost targets and IOC targets; add section on tracking to should-cost targets) Add DPM, DRM & DAB Prep requirements, including DAB Milestone Templates Add New section on Should-Cost