2011 - oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Current ILC work at Fermilab Electrical Engineering Dept.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
LED notched fibre distributing system Calibration system for SiPM
JRA3 Institute of Physics ASCR Prague
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
Baby MIND Collaboration Meeting #2
HCAL task status report
LED notched fibre system at AHCAL Calibration system for SiPM
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group 1.QMB1 performance 2.QMB1 with Toroidal inductor at PCB 3.Trigger distribution 4.Notched fibre light distribution systems 3x24 5.Resume

oct - 6Ivo Polák, FZU, Prague2 Two calib. systems since 2003 CMB Quasy Resonant systems present Members of our group: –Physicists: J. Cvach group leader, J. Smolik, J. Zalesak –Electoronics: J. Kvasnicka, M. Janata, I. Polak –D. Lednicky

oct - 6Ivo Polák, FZU, Prague3 Calibration and Monitoring Board (CMB) CMB consists of: –12 UV LEDs, each LED illuminates 18 scintillating tiles –12 pin-photodiodes preamplifier (LED feedback) –Light flash is steerable in width (2~100ns) and in amplitude –Controlled externally by CANbus, T-calib (LVDS) and V-calib (differential analog signal) –Temperature readout, several sensors are placed on the module June 11, 2011TIPP 2011, Kvasnicka3 12 LEDs Photo-diodes HCAL 1m 2 BT , now WHCAL T=Temp sensor.. HCAL layer

oct - 6Ivo Polák, FZU, Prague4 LED driver on CMB The LED is driven differentially The key component is an IC IXLD02, a LED driver from IXIS company Reverse voltage is applied right after the pulse  LED stops to shine immediately Disadvantage: RFI (radio frequency interference) due to the sharp edges June 11, 2011TIPP 2011, Kvasnicka4

oct - 6Ivo Polák, FZU, Prague5 CMB results CMD worked well for the 1m3 HCAL phys. Prototype (and still works with WHCAL!) Used for –Low intensity: the Single Photon Spectrum (gain calibration) –High intensity: SiPM saturation –Temperature measurements (for corrections) June 11, 2011TIPP 2011, Kvasnicka5

oct - 6Ivo Polák, FZU, Prague6 QMB1 Quasi resonant Main Board –Modular system, 1 LED per board –DAQ + CANbus control, or stand-alone mode –LVDS Trigger distribution system –Variable amplitude, zero to maximum smooth –Pulse width fixed to abt. 5ns (UV or blue LED) –Voltages and temperature monitor –Width of PCB 30mm, depth 140mm

oct - 6Ivo Polák, FZU, Prague7 Quasi-Resonant LED driver Less RFI, not sensitive to magnetic field – tested up to 4T PCB integrated toroidal inductor (~35nH) Fixed pulse-width (~4ns) LED current 1V => 1A PIN signal 4ns/div 1A pp To be increased, to get more light. Longer pulse  Larger inductor GET more light!

oct - 6Ivo Polák, FZU, Prague8 8 6-LED QR driver Main Board = QMB6 Consists: - 6 QR LED drivers - 2 PIN PD preamps - CPU + communication module, CANbus - Voltage regulators - temperature and voltage monitoring

oct - 6Ivo Polák, FZU, Prague9 LED, optical power test DC and pulsed Optical Power Meter PM100D with Si sensor S130D by Thorlabs Some LEDs intended to calibration Prague, March 2010

oct - 6Ivo Polák, FZU, Prague10 QMB6 performance June 11, 2011TIPP 2011, Kvasnicka10 3 mm 5 mm Very nice single photon spectrum (due to <3.5 ns pulse) Nice saturation curves (12 LEDs illuminated by 1 LED) We did a test in 4T magnetic field with a minimal effect (<1%) on operation Dynamic range up to 200 MIPs per position LED optical power up to 0.4 nJ per pulse ~200 MIPs

oct - 6Ivo Polák, FZU, Prague11 Principal schema Larger inductor than the older QMB6

oct - 6Ivo Polák, FZU, Prague12 Signal distribution at 30 x 140 mm^2 Two flat cables, Twisted pair for Trigger

oct - 6Ivo Polák, FZU, Prague13 TRIGGER (T-calib) LVDS distribution to QMB1 Trigger from DAQ master slave Terminated 120ohm RX TX LVDS Up to slaves modules

oct - 6Ivo Polák, FZU, Prague14 3D draw of QMB1 LED fibre PWR 15V and CANbus T-calib LVDS flat cable

oct - 6Ivo Polák, FZU, Prague15 Mechanical layout of QMB1 Outer line: 30 (29) x 140 mm*2 4 mounting holes for M2.5 screw LED

oct - 6Ivo Polák, FZU, Prague16 Notches at one long fibre (24notches total) Notch # 4Notch # 24 last one, biggest Light coupled from tap LED side Taken on microscope with zoom ~50

oct - 6Ivo Polák, FZU, Prague17 Notched fibre illuminated by green laser pointer

oct - 6Ivo Polák, FZU, Prague18 Optical fiber: performance We have measured several hand-made notched fiber: –72 notches: tolerance within 20% –24 notches: tolerance within 15% –12 notches: tolerance within 10% We had a measurement mismatch with a fiber producer  We discovered, that the measurement methodology is crucial Latest measurements of the light yield –Through the 3mm hole on the PCB (FR4 with filled inner layer) –3 positions of the notch according to the PCB thru-hole June 11, 2011TIPP 2011, Kvasnicka18 “start” position“middle” position“end” position

oct - 6Ivo Polák, FZU, Prague19 work at 2011 QMB1 (1-chanel LED driver): –Done Topology, PCB design Communicating bus (CAN) CPU (Atmel AVR) Trigger distribution (LVDS) Trigger delay canbe tuned by C trimmer (~10ns) 4 mounting holes for screw M2.5 Fibre(LED) position set to center of PCB –PCB in production + assembly –To be done Debugging in October/beginning of Nov Set of notched fibers, semiautomat machine under development –Set: 3*fibre with 24 notches, creating a line of 72 notches. –3 sets will be delivered in November 2010 Idea

oct - 6Ivo Polák, FZU, Prague20 Resume QMB1 is in PCB design stage –Exact position of PCB holes to be defined –Exact UV-LED position, coupling to fibre to be defined QMB1 in hand with fw - expected in autumn We are open to collaborate with other group!