Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.

Slides:



Advertisements
Similar presentations
My Solar Oven By Nathan Varnell.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
CALICE Collaboration Meeting March 2014 Roman Pöschl LAL Orsay On behalf of: D. Grondin, J. Giraud J. Bonis, P. Cornebise, A. Thiebault, C. Bourgeois,
FEV Boards status N. Seguin-Moreau on behalf of
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
S.Movchan Straw manufacturing and QC
ECAL EUDET MODULE Summary talk
Ladder Assembly All tools and jigs produced Glue dispensing works
Plan of production of SiW-ECAL slabs in Japan
Equipment for Assembly – UK Experiences
CALICE Collaboration Meeting KEK/Japan – April 2015
Ecal Front End Electronics
NPS mechanical design 11/13/2018 Jlab meeting
HL-LHC upgrade at IPHC news
WP4 Dave Bailey 5th May 2006.
Presentation transcript:

Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases Assembly and insertion equipments Facilities (hall) Conclusions

Thursday Sept 17, 2009CALICE week IPN Lyon2 Process Phases for one slab 1. Brazing 2 ASUs line 2. gluing HT kapton on each ASUs line 3. Integrating first ASUs line with kapton in H structure 4. Integrating first copper drain in H structure 5. Turn over H structure 6. Integrating second ASUs line in H structure 7. Integrating second copper drain in H structure 8. Clamp and close the slab with copper tape

Thursday Sept 17, 2009CALICE week IPN Lyon3 ASU assembly bench (brazing) Patrick Cornebise Assembly and insertion equipments Binocular ASU Heating lamp under fabrication P. Cornebise, Y. Peinaud M. Lacroix et J. Dubois Fastening Guide Temperature sensors

Thursday Sept 17, 2009CALICE week IPN Lyon4 Manipulation equipment for ASUs line (suction pads) Assembly and insertion equipments Suction pads ASUs line G. Guilhem

Thursday Sept 17, 2009CALICE week IPN Lyon5 Manipulation equipment for ASUs line (suction pads) Assembly and insertion equipments Manipulator into ASUs lin ASUs line « stick » on manipulator

Thursday Sept 17, 2009CALICE week IPN Lyon6 HT Kapton We need equipment to fix and keep flat HT Kapton sheet during gluing on ASUs line Heating suction table under study HT Kapton Assembly and insertion equipments

Thursday Sept 17, 2009CALICE week IPN Lyon7 The mecanique resistance of conductive glue seem weak  Epoxy glue points will be probably required. Final approach of ASUs line must be without cross mouvement  Guidance équipement for ASUs manipulator HT kapton test gluing on glass Lead by Patrick Cornebise (LAL) and Remi Cornat (LLR) Assembly and insertion equipments

Thursday Sept 17, 2009CALICE week IPN Lyon8 Facilities (Building) ASUs line assembly bench * HT kapton gluing bench (suction table and guidance) Side table * Turn table * Module stand (module = 800kg) Cosmic bench ASUs line box beam storage * SLAB box beam storage Electronique test bench (ASUs line, HT…) Wardrobes for equipments, tools, spare parts…* Computeur office Equipements liste *Quite clean environment required

Thursday Sept 17, 2009CALICE week IPN Lyon9 Facilities Patrick Cornebise office : Too small The floor not support heavy object Use for other project (not empty). Inadequate access Location in hall 2 (LAL, bat 200) : OK but Unclean, dusty.  Build a clean zone (budget)  Mind to delay EUDET area Hall 2, bat 200 LAL

Thursday Sept 17, 2009CALICE week IPN Lyon10 10 m 4 m Hall 2 Facilities

Thursday Sept 17, 2009CALICE week IPN Lyon11 The team have make good progress on equipments. Assembly and integration zone still abeyance Next steps are : - Thermal test in module with several « slab » - See real PCB/ASU to finalise SLAB in mecanical point of view - Start facilites devolpment Conclusions