Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.

Slides:



Advertisements
Similar presentations
NEW JERSEY DAM SAFETY RULES AND REGULATIONS. What is a dam? "Dam" means any artificial dike, levee or other barrier, together with appurtenant works,
Advertisements

TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Mount Polley Mine: Short Term Water Treatment/TSF Design Joint MEM/MOE Presentation June 2, 2014.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
BCC PUBLIC HEARING Concrete & Asphalt Plants Ordinance Adoption Hearing ZONING DIVISION January 27, 2015.
BCC Public Hearing Concrete & Asphalt Plants Ordinance ZONING DIVISION December 2, 2014.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Earth and Rockfill Dams
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
April 5, 2012 Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams,
Cortney L. Ohs, Ph.D. Aquaculture Ponds. Topics Site Considerations –Water –Soil –Topography –Types of ponds –Cost Construction of ponds –Levee ponds.
Tailing Dams – A Consultants Perspective
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Iowa Hill Pumped-storage Development PI:
NRC LICENSE APPLICATION PROCESS
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
San Dieguito Wetland Restoration Update on Progress by SCE June 3, 2004.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Certification Requirements
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Thomas F. Joos, P.E. Civil/Structural Engineer BNL Plant Engineering Division May 8, 2007 NSLS-II Conventional.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
TVI Resource Development (Phils), Inc. September Gossan Dam Embankment Construction Late July 2005 Placement of Core Zone Material. Placement of.
January 30, 2014 Kurt Parkan, External Affairs Manager Industry Outlook Forum Kenai Peninsula Economic Development District.
Sediment Channels Kentucky Department for Natural Resources Division of Mine Permits Sept. 6 and 14, Oct. 4 and 18, 2012.
GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Olary Creek Township Mine site Main tailings Repository “TSF” 0.5 km Radium Hill Aerial Photograph N.
TERRAMIN AUSTRALIA Limited
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
Mine Waste Management Presented by Cam Scott, SRK Consulting
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
October 9, 2007 BCC Called Public Hearing on BZA #VA , 8/2/07 APPLICANT: Medianet of Central Florida Inc.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
BY ROY KROLL & COLIN KARK DIVISION of FLOOD MANAGEMENT FLOOD MAINTENANCE OFFICE.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Geotechnical Investigation
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
CFAC Review NSLS-II Conventional Facilities Update
Class I Injection Well Application Issues
Tennessee Safe Dams Program
4th Annual Construction Law Summit
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Unified Approach to Stormwater Monitoring in Southern California
Estler Lake Dam Rehabilitation
Earth and Rock fill Dams
How Well is Your Well? UIC Class I Well Construction Standards
Presentation transcript:

Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015

Existing Permit Open pit currently permitted to produce ore in excess of 20 years; Sufficient non-ore (waste) rock storage available for 20-year mine plan; Tailings impoundment embankment permitted to 6400 elevation (AMC datum); Maximum operating tailing impoundment water level is 6360 elevation;

Current Conditions Tailings impoundment; – Current water level elevation 6332; – Tailings rise is approximately 6-feet per year; – Permitted impoundment water level reached in 2020; – Must start embankment construction above 6400 in – Amendment 10 to Operating Permit 030A for Continued Mining must be in effect in – Amendment will provide for an additional 20 years of mining.

YDTI Embankment Construction: Concepts

Existing 6400 Embankment 5 General Arrangement Moulton Road Montana Resources Berkeley Pit Reclaim Pond Tailings beach East- West Embankment Aerial Photograph: June 2013 North-South Embankment West Embankment

Embankment Raise Concepts Typical North-South Embankment Construction Section Existing Tailings Existing downstream construction: Free draining waste rock zone Downstream Construction: Free draining waste rock

Embankment Raise Concepts Embankment Configuration – Typical East – West Section 6500 elevation crest NEW Waste Rock (free draining) EXISTING Waste Rock (free draining) EXISTING Tailings NEW Tailings Water drains to pond ~ 2500 ft Seepage through embankment

Embankment Design Concepts 8 West Embankment – Construction Section Montana Resources NEW Tailings NEW Waste Rock (free draining) NEW Waste Rock (low permeability) 6500 ft elevation crest Moulton Road > 800 ft Water drains to pond ~ 2500 ft Toe Drain

Embankment Design Concepts 9 Embankment Extension – General Arrangement Montana Resources Toe Drain Embankment Crest Moulton Road Water pumps back into TSF

Proposed 6500 Embankment – Configuration 10 Multiple Spigot Points Montana Resources Existing Embankment

Current Activities  Topsoil and overburden stripping and stockpiling; – Stockpiles located adjacent to Mouton Reservoir Road to block the view and noise.  Site investigation: – 14 drillholes – SPT and core – foundation for west embankment; – 3 deep angle core holes in area around low point in west ridge water table to understand geologic structure at depth; – 7 sonic drill holes through east-west embankment to verify foundation strengths; – 8 cone penetration holes to verify tailings characteristics.  Preparation for construction of toe drain.

Tailings Impoundment Permitting Applicant must submit a design document detailing how the facility design will address over 30 specific requirements, including: Analysis showing that the TSF will withstand a 1 in 10,000 year earthquake event or maximum credible earthquake, whichever is larger; Design criteria to manage the probable maximum flood event; Design document must be reviewed by a panel of three independent experts.

Tailings Impoundment Permitting The independent experts have been selected and approved by MDEQ: – Dr. Dirk van Zyl, PE – Professor Geotechnical Engineering, UBC – Dr. Leslie Smith – Professor Hydrogeology, UBC – James R. Swaisgood, PE, PG All three experts must sign design document prior to submittal to MDEQ. MR’s Engineer of Record is Ken Brouwer, Knight Piésold Ltd.

Permit Schedule Submit permit application - Q Submit design document – Q MDEQ declare the application complete and compliant and issue draft permit – Q Initiate MEPA review – Q – Select MEPA contractor – Public scoping – comments - public meeting – Draft MEPA document – Public comment – public meeting – Final MEPA document Issue Record of Decision and final permit – Q2 2018

Questions ?