1 Linked-Service Address Discussion Thursday - April 8, 2004 (Updated 4/12/04 to include meeting results) Airport Hilton - Austin.

Slides:



Advertisements
Similar presentations
Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
Advertisements

Retail Market Guide Updates.  ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their.
Retail Market Subcommittee Update to TAC February 5, 2004.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
1 Pre-TX Set 1.5 Data Clean Up. 2 Pre-TX SET 1.5 Data Clean-up Process In-Review - currently 12 (Original Quantity = 863) –June RMS, count 207 In-Review.
Retail Sub-Committee Update Robert Connell June 14, 2002.
Role of Account Management at ERCOT PRR 672 Collaborative Analysis Presentation to RMS November 8, 2006 DRAFT ONLY.
1 Update from ERCOT Retail Market Services to RMS April 23, 2003.
1 Transaction or Issue Clean Up. 2 Linked-Address Issue Multiple ESI IDs Linked to a Single Service Address Record Background Counts Matrix Completed.
1 ERCOT True-Up Resettlement Restart Criteria Discussion Retail Market Subcommittee Meeting, February 24, 2003.
1 MIMO/Stacking (Including Tx SET Version 2.0) Post Implementation Success Report.
1 RMS Update - ERCOT June 10, Supporting Reports Section.
1 RMS Update on Move-In / Move-Out Task Force October 16, 2002.
Market Impact Assessment TF Final Report to RMS June 11, 2008.
09/15/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
1 Update from ERCOT Retail Market Services to TAC January 9, 2003.
TX SET January 21, 2009 Retail Release Items for February 21, 2009 Kathryn Thurman ERCOT.
Rob Connell May 1, 2002 Retail Sub-Committee Update.
1 Supporting materials for RMS Recommendations for improvements from EDIM team (ESI ID Data Integrity Management team)
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
ESI IDs Retired in Error! RMS – August 10, 2005 Discussion.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
Texas SET Version 3.0 Production Implementation Plan.
Report to RMS January 14, TTPT Key Dates and Deadlines as of 1/14/03 1/05/04 - Mandatory Connectivity Kick Off Call & Penny Tests begin 1/12/03.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
1 MVI/MVO Workshop June 3 – 12, 2002 Workshop Results.
Rob Connell May 29, 2002 Retail Sub-Committee Update.
Retail Market Subcommittee Update to COPS Kathy Scott March 17,
1 RMS Update on Move-In / Move-Out Task Force November 14, 2002.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
1 Transaction or Issue Clean Up. 2 Linked-Address Issue Multiple ESI IDs Linked to a Single Service Address Record Background Counts Matrix Completed.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
1 Critical Retail Issues RMS Update RMS Meeting Results 2/01 RMS Formed 3/01 RMS Identified “pent-up” issues Tx Set transaction development Service Order.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
1 TX SET Update to RMS November 12, RMGRR Activity RMGRR065 – Disconnect and Reconnect for Non-Payment Updates and Corrections – –Normal Timeline.
1 RMS Update By Don Bender January 9, RMS Approved Resolution Upon TAC approval, suspend further True-up settlements for True-up resettlement.
Feb 18, TAC Report to the ERCOT Board February 18, 2003.
Update to RMS August 4th, RMGRR129 – Revision to Customer Rescission Completion Timeline Timely execution of a customer rescission after completion.
February 10, 2010 RMS ERCOT 1/24/10 Production Issue Overview and Lessons Learned Karen Farley Manager, Retail Customer Choice.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
February 19, 2009 ERCOT Follow up on questions from 2/11 discussion on proposed Expedited Switch rulemaking changes…
1 TX SET Mass Transition Project RMS Update March 15, 2006.
Update to RMS December 18, Project(PR) 010_03 SCR756 Part B – High Level Timeline DRAFT:  Planning Phase: ~ (End of 2013) ◦ Business requirements.
1 TAC Report to the ERCOT Board January 17, 2006.
ERCOT Portal Replacement Phase 2 Project Update to RMS Presented by Dave Odle Thursday, October 16 th, 2003.
Retail Market Subcommittee Update to TAC March 4, 2004.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Retail Market Subcommittee Update to TAC May 6, 2004.
MIMO Stacking Document and the current RMG are inconsistent with current logic and should be updated.
SHARYLAND TRANSITION TASKFORCE (STTF) UPDATE UPDATE TO RMS APRIL 1,
1 Update from ERCOT Retail Market Services to RMS August 14, 2003.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
MMWG Performance Measures Questionnaire. Performance Measure Reporting Requirements The reporting requirements allowed the commission to obtain information.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Summary of the November 11, 2002 Market Synchronization “How-to-Fix” Decisions For presentation to RMS November 14, 2002.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
MarkeTrak Issue Resolution Tool Retail Market Participant Workshop.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
Multiple ESI IDs Linked to a Single Service Address Record Linked-Address Action Items.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
Pro-Active Transaction Resolution Measures
Pro-Active Transaction Resolution Measures
Stacking Implementation Plan
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Demand Response – ERCOT discussion items
Presentation transcript:

1 Linked-Service Address Discussion Thursday - April 8, 2004 (Updated 4/12/04 to include meeting results) Airport Hilton - Austin

2 Objectives Introductions, Expectations and Meeting Rules Review Current Data Linked-Service Address Issue –Background –Tasks completed to date –ERCOT Analysis –ERCOT database “fix” activities Review TDSP insights gained during initial address compare Provide a forum for Market Participants to air concerns and proposals Gain Market consensus for further activities Note potential areas for process improvement Define Next Steps, Timelines and Objectives (Group agreement on these objectives) Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

3 Introductions and Meeting Rules Introduction by attendees –Company Representing –Role in this Effort –Expectations for today Today’s Meeting Rules –We will do our best to stay on agenda (Parking lot peripheral topics) –Keep discussion to one-at-a-time during meeting times –Focus on objectives –Focus on what is good for the market –Incorporate lessons learned from previous projects and recent analysis –Additional business process improvement suggestions will be captured –We will use this presentation as a working document Next Steps –Report results to RMS next week Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

4 Background On the 02/18/04 Retail Market Call, a CR reported a concern regarding discrepancies between ERCOT’s Portal and the TDSP’s customer information system. The CR provided specific example for ERCOT to research. Analysis, released by ERCOT on 3/8/04, has identified that linked service addresses were established in the ERCOT Siebel system based upon data provided during conversion in In these instances, a TDSP provided the same service address for multiple ESI IDs. During the conversion process, a single database record was created which linked a single service address to multiple ESI IDs. The Address Field components making up the address record in the ERCOT Siebel system are Address-street name, Address Overflow, City, State and Zip code. The current effect is that an 814_20 address change to any one of the address- linked ESI IDs effectively changes the address, in ERCOT’s system, of all ESI IDs linked to that same record. Approximately 11 percent of the ESI IDs in the ERCOT Siebel system are affected by this "linked address" issue. Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

5 Completed Items 3/8/04 - Information released to the Market during Retail Market Call 3/9/04 - Initial conference call with TDSPs to discuss issue and proposed process 3/10/04 - Retail Market Call additional information 3/12/04 - ERCOT provided TDSPs a list of all ESI IDs with linked-addresses 3/16/04 - Follow-up conference call with TDSPs to discuss process further - ERCOT had ad-hoc discussions with CRs 3/17/04 - Follow-up discussion with a CR - Follow-up at Retail Market Call to detail proposed process 3/31/04 - TDSPs responded to ERCOT with mismatched address analysis results 4/7/04 - ERCOT completed analysis of address mismatch data received from TDSP 4/8/04 - Market Meeting to discuss issues and further Market activities Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

6 TDSP ERCOT CR Original Lists Compare Analyze & Summarize Results Mismatch List w/ Addresses Post Master Mismatch List (130K) Compare CR Addresses to Mismatch List and determine any Inadvertents Compile Data for Meeting March 31 st April 2 nd March 12 th April 8 th Market Meeting Austin Airport Hilton Send CR Current Ownership List (17K) April 21 st Market Meeting CRs Report Analysis Results MPs Define Next Steps Send ERCOT Summary Count of Inadvertents Submit FasTrak Issue For Inadvertent Provide Information on Address Matching Mechanism

7 Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record) TDSP ERCOT CR “Fix” Database New List of all ESI IDs Compare Post Compare Results Mismatch List w/ Addresses Submit 814_20s Process 814_20 Receive 814_20 Schedule to Complete April 24 th Retrieve and Compare Hold till MP Agreed Date

8 TDSP Quantity Breakdown Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

9 ERCOT Analysis Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

10 ERCOT Analysis of Mismatched Addresses Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

11 ERCOT Analysis of Mismatched Addresses with non-AREP Activity Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

12 Activity Selection: Includes the following Statuses: –In Review –Permit Pending –Scheduled –Complete –Complete w/o Transactions For Transaction types: –Move-In –Move-In from CSA –Move Out to CSA –Move-In/Force Move Out –Switch –Drop to POLR Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record) Excludes the following Statuses and Transaction Types: –Cancelled –Cancel Pending –Cancelled by Customer Request –Cancelled by Customer Objection –Cancelled Permit not Received –Cancelled w/Exception –Rejected by TDSP –Unexecutable –MVO Date Update –CSA –Move Outs –Historical Usage

13 Data Files Prepped by ERCOT: A Single Master Mismatch File list containing: –ESI Id –TDSP Duns –TDSP Address Data (Address, Overflow, City, State, Zip) –ERCOT Address Data (Address, Overflow, City, State, Zip) –ERCOT Status (Active, De-energized, Inactive) –ERCOT Premise Type Separate Current Rep of Record Data for Mismatch ESI Id Lists containing: –CR Duns Number –ESI D Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

14 Points for Consideration There will continue to exist a subset of ESI ID that will have the same service address. For example a house, guard light and barn may all have the same address. CRs will continue to find multiple ESI IDs at a single service address in the future. Based upon the TDSP response, there are 447,458 ERCOT ESI Ids that are part of the Link-Service Address discussion that have correct addresses. The TDSP will not be sending 814_20s on these and they will continue to have same addresses on the Portal and the Extract. All ESI IDs with the same service address are not included in the stats – only those with linked-address issues at ERCOT Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

15 TDSPs to provide Address matching experience insights (Detail Data of inclusion/exclusion criteria to be provided) Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

16 Next Steps – (Determine if CRs have inadvertently gained any ESI IDs) 1.ERCOT to provide MPs with the Master Mismatch list of ESI IDs the TDSP have identified by 04/12/04 2.ERCOT to provide current CRs list of ESI IDs they own that are part of the Master Mismatch List - filtered to ESI IDs that have had non-AREP activity 3.From 1 and 2 above, the CR determines if they were ever ROR for an ESI ID (additionally if they were ever ROR for an address in the list) –CR could prioritize by status, premise type, age of ownership or if relationship terminated in the past 4.In instances where the CR determines current or previous ownership of the ESI ID, the CR compare TDSP address to CR address(es) to determine if the ESI ID was gained inadvertently a.If yes, the CR will file an inadvertent gain FasTrak issue i.Additionally, the CR will report back to ERCOT a list of ESI IDs they believe were gained inadvertently by 4/19/04. 5.ERCOT to provide summary data at the 04/21/04 Market Meeting on this subject Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

17 Next Steps – (ERCOT Database correction) Updates to be given at least once weekly on the Monday Retail Market Call and summarized at RMS until process is complete ERCOT to determine a process to establish a one-to-one relationship between impacted ESI ID and service address record in the ERCOT Siebel system. Process initiation will begin 04/12/04 and will flow through the testing environment and a roll-out to production on 4/24/04. –ERCOT to add the address overflow field to the ESI Id look-up function on the Portal (SIR 8012) –ERCOT to add the address overflow field to the TDSP ESI Id Extract (SIR 8668) ERCOT to provide TDSPs with a list of affected ESI IDs after final database fix TDSPs to compare final list to their system addresses and submit 814_20 address modification for any address mismatches –Date for TDSPs to release 814_20 corrections to be determined at the 04/21/04 Market meeting on this subject Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

18 Additional Action Items: 1.Centerpoint to send ERCOT a list of retired ESI IDs that CNP was unable to perform the address comparison –ERCOT to post the above list for MP’s use 2.TDSPs to detail their address matching analysis process by 4/16/03 –ERCOT to compile data for the 4/21/04 meeting 3.ERCOT to schedule next meeting for 04/21/04 4.ERCOT to send CRs, upon request, the entire list of 577K ERCOT ESI IDs associated to the linked-service address issue 5.ERCOT’s next list to TDSPs (after ERCOT database correction) will contain a field for a common identifier (ie. If 5 ESI IDs are linked those 5 will have a common identifier) 6.Market to discuss potential areas of process improvements 7.Market to discuss parking lot items Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

19 Potential Areas of Process Improvement CRs to create an exception process when the TDSP provides an 814_04 (which ERCOT send to the CR in 814_05 transaction) that has a different address than the CR originally submitted TDSPs to perform a periodic synchronization of TDSP system service addresses to ERCOT system service addresses and provide 814_20 updates to resolve inconsistencies. (using the TDSP ESI ID Extract as the ERCOT data source) Define a Market Process CR should use when they find multiple ESI IDs at the same service address using either the ESI ID look-up or on the TDSP ESI ID extract Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)

20 Parking Lot Items 1.Other ESI IDs with same address? (There is the potential for other ESI IDs in the ERCOT system that were not linked, but have the same address which could also have caused the same customer switching issues.) 2.Is there a way to make addresses unique? 3.What is plan for clean up of Non ERCOT areas? – will capture correction when they enter the Market because most haven’t been updating the ERCOT system. Linked-Service Address (Multiple ESI IDs Linked to a Single Service Address Record)