Pennsylvania Mine Removal Update Snake River Task Force Meeting February 12, 2014.

Slides:



Advertisements
Similar presentations
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Advertisements

June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
BoRit Superfund Site Timeline
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Pennsylvania Mine and the Snake River Task Force.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Environmental Streamlining Task Force Water Quality Ordinance April 5, 2012.
Summitville Gold Mine Disaster
Lucia Machado, NPS Coordinator.  Under Section 319 of the Federal Water Pollution Control Act (Clean Water Act) ◦ Part (h) provides the grant program.
Project Update August Gortmore TMF Phase 1 completed December 2008 by Priority Construction Ltd. Phase 2 completed June 2010 by SIAC Construction.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
Earth Science 4.3 Water, Air, Land Resources
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
ONTARIO’S ABANDONED MINES REHABILITATION PROGRAM Presentation for IAEA/CNSC Workshop Elliot Lake, ON May 1, 2014.
Upper Blackfoot Mining Complex
Storm Water Pollution Prevention Training
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Colorado Division of Reclamation, Mining & Safety Idarado Natural Resource Damage Remediation Project CDRMS Office Locations Denver Grand.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Mining and the Environmental Impacts. Mining Methods.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
April 3, 2012 Acid Mine Drainage Source Control Program Design Investigation Upper Tenmile Creek Mining Area Site Angela Frandsen, PE Helena, Montana.
Emergency Waste Management in the Bunker Hill Superfund Site Bruce Schuld – Program Manager Idaho Department of Environmental Quality Kellogg Bunker Hill.
The Evolution of Mining Reclamation and Regulation in the San Juan Mountains Mark Walker Technical Assistance to Brownfields (TAB) Program May 29, 2015.
Evaluation of Non-Traditional Sources of Cooling Water Sujoy Roy and Michael DiFilippo Tetra Tech Inc, Lafayette, CA and MND Consulting, Berkeley, CA EPRI.
TERRAMIN AUSTRALIA Limited
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
1 LOCKFORMER ELECTRIC RESISTIVE HEATING CASE STUDY U.S. EPA Emergency Response Branch Steve Faryan, On-Scene Coordinator ,
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Office of Research and Sponsored Programs William S. Messer, Jr., Ph.D. Vice President of Research.
Upper Newsome Creek Habitat Improvement Pre-solicitation Restoration of Upper Newsome Stream Reach 3 and Haysfork Sediment Pond Restoration.
Protecting against acid rock drainage is important at mines where sulfide minerals are present. Image: G. Plumlee, USGS Metals-4-1.
Past and Present Efforts. History – Early acid rock drainage and wetlands investigations 1989 – US Forest Service Special Use Permit for pilot.
Power Plant Construction and QA/QC Section 2.6– Water Treatment
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Water Sources & Pollutants FS Unit 5 FCS-FS-5: Students will discuss why water and pH are important factors in food preparation and preservation. C. List.
Pennsylvania Mine Removal Strategy Snake River Task Force Meeting May 29, 2013.
ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Mining and the Environmental Impacts
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Revision presentation. The drainage basin 1.the edge of highland surrounding a river. 2.An area from which all precipitation flows to a single stream.
Plaistow BOS Meeting 7/24/2017
Protecting against acid rock drainage is important at mines where sulfide minerals are present. Image: G. Plumlee, USGS Metals-4-1.
Mining.
Groundwater Contamination
ENV 345 Innovative Education- -snaptutorial.com
On-Site Wastewater Treatment Systems
The Clean Water aaact of 1977
Chapter 11 Section 3 Using Water Wisely.
What is acid rock drainage?
Water Types of water Sewer systems TCU/VIA 6th semester workshop
Protecting against acid rock drainage is important at mines where sulfide minerals are present. Image: G. Plumlee, USGS Metals-4-1.
Effects of Disasters on Wastewater Treatment and Collection Systems
Steps To Prepare Site For Site Work Construction Calhoun GA.
SGC Mining and Reclamation Evaluating Animas River Water Quality
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

Pennsylvania Mine Removal Update Snake River Task Force Meeting February 12, 2014

Project Objectives Reduce exposure levels and control off-site migration of contaminants Phased approach to deal with both surface and sub-surface sources Successful collaboration (combine resources) Removal Action under 40 CFR, Section (b)(2)

…2035 Underground Investigations(DRMS) Phase 1: Site Preparation Phase 2: Underground Bulkhead #1 Phase 3: Reclaim Waste Piles Phase 4: Seal-off Level C Surface Water Pathways (if necessary) Phase 5: Underground Bulkhead #2 (if necessary) Phase 6: Construction of Treatment System (if necessary) Phase 7: Post-removal Site Control (if necessary) Progress Completed Planned

FY 2013 Work Completed Roads/Access (EPA) – Surface, drainage improvements, crossings Site Prep (EPA) – Lay down area, rock source, drainage Water/Waste Management for Underground Work (EPA) Prep/Clean/Secure Level F Adit (DRMS) Level F Waste Pile consolidation/improvement (EPA)

Level F Prep Bulkhead #1 Location Bulkhead #2 Location (optional) View of F-level Cross Cut

Plans for FY-14 Mobilize July 7 th Install First Bulkhead (DRMS) Waste/Water Management (EPA) Address Level C and Upper Works (EPA) Maintain Roads/Access (EPA) Begin Re-vegetation (EPA) Clean/Investigate the Drift (DRMS)

Questions? View of C-Level Cross Cut