G. Dissertori ETH Zürich 4.11.2004 ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
The Detector Control System for the ATLAS SemiConductor Tracker
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
G. Dissertori ETH Zürich ECAL ESR - DCS 1 ECAL Detector Control System G. Dissertori Electronics System Review, Oct 9, 2003 Status report Trigger/DAQ.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
André Augustinus 16 September 2002 Safety issues.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003.
FPix DCS Subgroup Report
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
ATLAS MDT HV – LV Detector Control System (DCS)
CMS-ECAL DCS Prototype
CMS-ECAL Front-End monitoring Matteo Marone
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report Trigger/DAQ project  DCS CMS DCSECAL DCS

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 2 Outline u Overview u Precision Temperature Monitoring (PTM) u ECAL Safety System (ESS) u PVSS Monitoring (and related issues) u Note : For details on the PTM and ESS hardware (sensors, readout) I refer to the DCS ESR, May 04!

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 3 Overview ECAL module crystal PCBs for VFE and FE cooling LV, HV Laser system Offline, DAQ Data Bases Data Bases PVSS prec. temp. sensor Monitoring ESS temp. sensor + WLD Monitoring Safety, PLC interlock cooling, faults humidity sensor

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 4 PTM Precision Temperature Monitoring - PTM S. Zelepoukine, IHEP Protvino and ETHZ

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 5 PTM n Requirements: u very high precision temp. monitoring : check stability of water cooling system, to stay within deg C. l no hardwired feedback to cooling u relative precision : 0.01 deg C u one sensor/module on thermal screen and grid u main water IN, main water OUT

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 6 Patch panel Patch panel Thermal screen Grid Sensor probes location inside SM: Probes of type 1 (N = 4 + 4)Probes of type 2 (N = 2) Number of probes (per SM): = 10 Each probe has its own signal cable – twisted pair M1M2M3M4 PTM : Sensor location

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 7 PTM : Sensor location (SM0) M3 probe M3 cable from M3 probe cables from M1 and M2 enter M3 via different windows Patch panel location

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 8 55 mm St.steel; outer / inner dia = 4 / 3 mm by F.Mossiere PTM : immersion probes

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 9 Location of immersion probes Turned out during electronics integration for SM10: Location/mounting of these probes is critical, in the sense that operations on the PP can lead to damaging them. Alternatives?

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 10 SM – top view PTM immersion probes Cooling manifolds Current probe location is proven for probe to be easily damaged while people are working at the patch panel… PP Better location would be: Now… Location of immersion probes

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 11 PTM/HM: intermediate connection SM – top view PP SM10 in H4: 2 sensors from 14 (1 PTM and 1 HM ) are lost due to the poor intermediate connection quality… SM production (from now on): All PTM/HM sensors are to be installed in B27 without an intermediate connection – sensor cables are directly connected to the PP connector. SM production (from now on): All PTM/HM sensors are to be installed in B27 without an intermediate connection – sensor cables are directly connected to the PP connector. Intermediate Connections

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 12 PTM : Readout - Layout ELMB Cur.src PC / PVSS ECAL UXC55 balcony: Counting room 20x2 STP cables CANbus cables ~ 500 sensors (NTC thermistor Betatherm; 25C; indiv.calibrated; better than 0.01C rel.accuracy) Readout electronics: ELMB based; ELMB reads voltages and converts to digital data, then sends data via CANbus. DC-DC converters DC Power supplies DC Power supplies Monitoring application: PVSS based; data storage/archiving, visualization/trending, warnings/alarms. Network access Galvanic isolation

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 13 Recent Results n First results from SM10 at H4: u Sensors, sensor probes, read-out practically final u Reading 4 sensors on grid, 3 sensors on thermal screen, and Water IN/OUT l One sensor lost, most likely due to bad intermediate connection inside SM before PP u Since about one week : installed 2 sensors on backplate l Above M1 and M4

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 14 Cooling Stability Zoom

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 15 M4 M3, M2 M1 Grid Thermal screen Water - IN 0.01C M1 M4, M3 Cooling stability = 0.01C (incl. day/night oscillations) Zoom :

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 16 Just to show uncompressed (in time) data… 10 min Grid Thermal screen Water - IN Ambient Div = 1.0C Div = 0.01C

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 17 M2 M1, M3 M4 M1 M2 M3 M M1 M2 M3 M Inside the electronics compartment From ESS, see later…

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 18 Grid side Water – out (blue) Th.screen side Water – in (red) Grid side (zoom) Th.screen side (zoom) Water – in (black) Ambient 4x sensors are located on the SM10 external surfaces: On Backplate (Grid side): M4, M1 Thermal screen side: M4, M1 4x sensors are located on the SM10 external surfaces: On Backplate (Grid side): M4, M1 Thermal screen side: M4, M1 Th.screen side – roughly equal to ambient (18.2C); Grid side – 23.4C (and much heat is dissipated by the massive metallic support!). Th.screen side – roughly equal to ambient (18.2C); Grid side – 23.4C (and much heat is dissipated by the massive metallic support!).

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 19 Just to show uncompressed (in time) data… Grid side Water – out (blue) Water – in (red) Th.screen side Grid side (metallic surface) Th.screen side (plastic surface) Water – in (black) ambient Div = 1.0C Div = 0.2C

G. Dissertori ETH Zürich ECAL Cooling Review - DCS C 23.4 C C Air conditioner ~18 C SM10 in H C heat ~30 C Heat flow out of ECAL?

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 21 heat ? ? ? ? Heat flow out of ECAL?

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 22 Conclusions on PTM n Cooling stability: u Achieved 0.01 C in the long-term, including day/night variations u Have a monitoring application, Serguei is working on a more “final” version… n Temperatures on outer surfaces u Recent measurements performed by Serguei u Is heating towards outside (or inside, depending on orientation) an issue? For other detectors? For other SMs ? u As next step, Serguei will move external sensors to lateral surfaces… n Hardware u Resolve issue of immersion probes u Intermediate connections will not be there any more

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 23 ESS ECAL Safety System - ESS formerly : TSS (Temperature Safety System) Belgrade group, ETHZ See also CMS NOTE

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 24 Full system autonomy in all aspects; Independent, continuous temp. monitoring of the ECAL VFE + FE environment in both ECAL SM + EE; Precision : 0.5 deg C Archiving of temp. data and system status information for analysis of system and detector performance; Reliable hardwired interlocks with ECAL HV and LV Power Supply systems; External Alarm Interfaces with ECAL Cooling system, as well as interface with general CMS DSS; Also with the newly proposed Water leakage detection system! Prompt reaction on any external alarm or critical change of temperature inside the ECAL by issuing, in a proper time sequence, Warnings and Alarms to: 1. HV System Crates (hardwired interlocks), 2. LV System Crates (hardwired interlocks), 3. System Operator (soft PVSS Warnings and Alarms); Maximum possible level of robustness, reliability, safety and maintainability; ESS : Requirements

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 25 Three interconnected system layers: ESS FE Layer Temperature conversion and channel multiplexing - ESS FE Layer, ESS PLC Layer Data acquisition, data processing and interlock generating - ESS PLC Layer, ESS Soft Layer System monitoring and system control - ESS Soft Layer; Schematic layout RS485 ?

G. Dissertori ETH Zürich ECAL Cooling Review - DCS NTC 470 Ohms There are in total NTC 470 Ohms thermistors (EPCOS) positioned in pairs at each measurement point ( “Twin” sensors ). 2x twisted pair cable SCEM = SCEM = , 2x2x0.05mm2, PETP insulation outside diameter 2.9mm, PETP insulation ESS : Sensor Location 40-90m long 9xSTP cable sections SCEM = SCEM = – 9x2x0.008 mm2 outside diameter 7.2 mm, MA 18 P

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 27  We got 2 complete setups needed for a redundant system Siemens S Family PLC System for ESS: ESS : PLC

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 28

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 29 Principle Controls Actions n See also Xavier’s alarm/action matrix… n Critical Reading : Temperatures (TSS) u Software warning. If persistent: u Switch OFF relevant HV/LV power supplies via ECAL-PLC n Critical Reading : Water Leak u Software warning. If persistent: u Switch OFF relevant HV/LV power supplies via ECAL-PLC u Message to Cooling PLC : close SM n safety lines n Critical Reading : Sniffers (on CMS-DSS PLC) u Switch OFF power on ECAL racks (to be implemented by CMS-DSS) ? u See also Ch. Schaefer’s talk…

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 30 Principle Controls Actions n DSS Watch Dog : ECAL-PLC not running u Switch OFF power of the ECAL racks u Note : ECAL-PLC checks that Cooling-PLC is running! n Critical Reading on General Cooling PLC (TS) : u Message to the CMS-DSS PLC and the Cooling PLC u Actions (?) : Stop water, switch OFF power of ECAL racks n Critical Reading : DCU temperatures (on PCBs/Capsules) u Software warning. If persistent? u I would say : no automatic action n Critical Reading : PTM temperatures u Software warning. u I would say : no automatic action

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 31 Principle Controls Actions n In general, for ESS - DSS interactions: u ESS should take principle actions u Only when DSS sees that ESS is “dead”, DSS should take action! u Exceptions : l Sniffers (go directly to DSS) l Others?

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 32 Experience up to now n Excellent performance of ESS u Sent relevant interlocks during SM0 tests u No problem during SM10 running up to now u See ESR May04 review talk for details on SM0

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 33 PVSS Monitoring and Control S. Zelepoukine, P. Milenovic, R. Ofierzynski, F. Beaudette, A. Lister, R. Gomez-Reino Also : Thanks to S. Schmeling / JCOP

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 34 Standard Controls n Continuous Monitoring (display/storage via ECAL-PVSS) u Temperatures from ESS u Temperatures from PTM u Temperatures from DCUs (not implemented yet at H4) u Water Leakage Detection System (via ESS) u Humidity u Cooling System (temperatures, flow, pressures) u HV and LV u Status of Laser System

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 35 PVSS at H4 : Prototype for ECAL n First complete set-up of PVSS DCS system u At H4, includes: u PTM - HM - ESS - LV - HV - Cooling - Laser u + Supervisory system u Every application implements a Finite State Machine u Based on PVSS II, v.3, and the JCOP framework u Distributed system (Windows XP) on 3 PCs : l 1 : Supervisor, Laser, Cooling l 2 : HV, LV l 3 : PTM, HM, ESS u Should be similar at P5 l I see no reason to have dedicated PC just for Cooling Monitoring

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 36 PVSS at H4 : Data Logging u For the moment, all data go to the PVSS archive (proprietary) u Not easy to get data out (apart trending, which is ok) l not foreseen as final solution (!) u Done because of pressure to get the FSM at H4 etc running u On the long term : ORACLE u Some first tests last year with HV, but did not learn too much u A new expert is joining the efforts (Rick Egeland, Minnesota) l He will try to help us setting up the commun. with ORACLE and to develop scripts to easily retrieve data u We will not write all DCS data to conditions DB at high frequency. Rather at low freq. ( 1/ (1 - 10) min ?) or when major changes occur l Could write all DCS data to some dedicated DCS DB, which is archived at some stage (after a couple of years?). TBD u But not more to say for the moment…..

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 37 Supervisory System : 1

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 38 Supervisory System : 2

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 39 Supervisory System : 3

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 40 Cooling Application See also Xavier Pons’ talk: For ways of changing limits, OPC connection, etc. Note: This application only monitors user can not operate the cooling system from here !

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 41 ESS Application

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 42 Conclusions n Hardware u PTM : u performs according to specs u Able to monitor temperature stability to 0.01 C u To be resolved : issue of immersion probe location u ESS: u Have purchased redundant Siemens PLC system u All tests up to now very satisfactory u To be finalized : l Water leak detection l Hardware links with Cooling l Exact protocol of further software communication with Cooling

G. Dissertori ETH Zürich ECAL Cooling Review - DCS 43 Conclusions n Software u Have developed first (in CMS) complete distributed monitoring system based on PVSS u Was rather difficult and painful endeavour, have learned important lessons, also for other subdetectors u To be implemented : Monitoring of PCB/capsule temperatures from DCUs u Monitoring of cooling : ONLY monitoring, no action/operation by shifter u Have to identify man-power for the development of the P5 set-up, based on what we developed for H4