Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Liquid Hydrogen Absorber
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Installation of the T600 at Fermilab
He Plant, LN2 Systems and Commissioing
Production at Victoria University of Victoria
IT-4189 Supply and installation of a cryogenic distribution system
Teleconference ACS – FREIA 18th April 2017
LS1 Committee January 24th, 2014
Parts exchange for HL-LHC AUP Q1&Q3
Pierluigi Paolucci - I.N.F.N. Naples
Shipping (#4) of the components for 100’s Head welding.
Status of the PANDA Solenoid Magnet Production in BINP
Pierluigi Paolucci & Giovanni Polese
Teleconference ACS – FREIA 19th June 2017
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit carries 1920 electrical channels. 50 feedthrough units in total (+5 spares) are required, 25 per endcap. There are 4 different kinds of signal feedthroughs on each endcap cryostat, due to the varied detectors they are servicing. In particular, low voltage is supplied to the HEC preamplifiers, located in the LAr, via signal feedthroughs. Close collaboration with colleagues from BNL (barrel signal feedthroughs) ATLAS reviews Project Review, BNL, Jun Baseline Design review CERN, Oct 13 th 1997 Production Readiness Review, CERN, Jan 29 th 1999 Activity/Systems Status Overview, CERN, Feb One endcap cryostat shown during assembly

Endcap Signal Feedthrough Overview VCR Glands Heater and T probes Ambient Flange Bolt Ring (not shown) to attach to warm vessel Bellows Seal Ring Pin Carriers Bellows Bellows Cuff Ring Vacuum Cables Cold Flange Cold Box or Funnel Pigtail Cables 1920 channels to detector patch panels in the cryostat CF Flange for tests Funnel cut here before welding on cold vessel bi- metallic junction Seal ring OD = mm Total height = mm

Production Status (as of June 10, 2002) 44 feedthrough units produced of which 29 at CERN and officially received. Production expected to end in August or September 2002 All units required for the endcap cryostat C are ready at CERN since March 2002 vacuum cable installation final cold tests

Shipment to CERN crated feedthroughs first 4 HEC feedthroughs in shipping container at the University of Victoria (November 2, 2001) Each feedthrough has its own crate (they come in two sizes) 4 feedthrough crates are then packed together in a large container for shipment

Reception Tests at CERN Feedthrough units are tested upon reception at CERN: visual inspection leak test (ambient temperature) electrical test (cross-talk) The electrical testing equipment will also be used on the cryostat after feedthrough installation electrical testsleak tests

Quality Assurance / Quality Control QA/QC is critical to the success of the project Very detailed document released (QA/QC version 5, March 28, 2002) procedures and documents have been updated after the experience gained from building the first feedthroughs All TIS (CERN Safety) concerns have been addressed (Dec 00) All information stored in a purpose-built database material traceability production and reception test results available on the web: