HBD Status Craig Woody BNL DC Meeting October 3, 2007.

Slides:



Advertisements
Similar presentations
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Advertisements

Tent Update 5 Feb 2008 Matt Durham for tent crew.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1 HBD Towards Run-9 Itzhak Tserruya H/L meeting, April 3, 2008 April 3, 2008.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
GEM Foil Development at ECIL
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Initial Performance of the PHENIX Hadron Blind Detector at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration N IEEE Nuclear.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
Status of Readout Boards
VTX readiness for RUN15 Y. Akiba.
Presentation transcript:

HBD Status Craig Woody BNL DC Meeting October 3, 2007

C.Woody, DC Meeting, 10/3/072  Framing and full testing of the 55 GEM foils (25 Au plated and 30 standard) ordered from CERN have been completed  On each foil, the production consists of the following steps (same procedure as last year): V test in air before framing V test after framing V test after soldering SMD resistors (steps 1-3 are done in a clean room) V test in CF 4 5. Gain mapping in Ar/CO 2 at 484V (steps 4 and 5 are done inside stainless steel test box)  Results A. Out of the 30 Standard GEMs: 28 passed all tests in the first try. 1 was damaged by us 1 had a production defect and was not framed. B. Out of the 25 Au plated GEMs: 16 passed all tests in the first try. 4 failed test #4 in the first try. They passed this test the second time after washing in de-ionized water. 4 failed test #4 even after the washing and were declared bad. 1 was accidentally damaged by us.  Status  The defective GEMs (1 standard and 4 Au plated) were sent to CERN for replacement.  All good GEMs including spares from last year are already at SUNY (with the exception of 15 standard GEMs that are at WIS). GEM Production Completed at WIS

C.Woody, DC Meeting, 10/3/073 HBD West Reconstruction Things are going more slowly than expected Upon arrival at Stony Brook, GEMs are full tested again in nitrogen and then given a long term test in CF 4. Modules are required to reach full gain (~ 5000) and hold voltage for many hours. This is very time consuming, but is equivalent to the test and conditioning they would undergo in situ at the IR Presently takes ~ 1 week to fully test and install one module Several GEMs have failed the long term test (sparked and damaged foils) We plan to speed the testing and conditioning process up by ~ factor 2 by sending a second test box from Weizmann to Stony Brook 3 fully tested modules installed in HBD West Have reduced external capacitance to a minimum and installed relay protection circuit to protect GEM from damage from sparks

C.Woody, DC Meeting, 10/3/074 HBD East Removed HBD East was removed from the East Carriage on 10/1 and moved to Stony Brook Presently under N 2 gas flow waiting for rebuilding after HBD West Gas system will be modified to increase flow to ~ 10 lpm

C.Woody, DC Meeting, 10/3/075 Further investigation of BERTAN PS for testing shown that it might be dangerous. Currently not in use. WIS sent a CAEN PS model 471 for the single GEM test. Currently in transit WIS will send next week its stainless steel test box to speed up conditioning (present bottleneck in the stack assembly) All new HV divider boards are out of production, the first one is ready with all resistors Work on protection relay boards is ongoing Question: Is is possible to install HBD West after the shield wall is closed ? Other Activities