Cross-Border Cooperation through Environmental Planning and Investment Institutional Strengthening Workshop Budva, Montenegro, 5 September 2007 Policies.

Slides:



Advertisements
Similar presentations
COMMONWEALTH YOUTH PROGRAMME AFRICA CENTRE COMMONWEALTH SECRETARIAT Youth Enterprise Development and Youth Employment Experiences and Lessons from Commonwealth.
Advertisements

Armand Racine Consultant Chemicals Branch
World Bank Infrastructure in the Europe and Central Asia Region: Urban and Water February 6, 2006.
Good governance for water, sanitation and hygiene services
The Danube Water Program
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
PEIP Project Tariff Policy for Water and Wastewater Services.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
Cross-Border Infrastructure: A Toolkit Barriers to Cross-Border Infrastructure Development Session on Regulation & Accountability The views expressed here.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Public Procurement in Transition Countries: Major Trends in Provision of Access to Justice 16 July 2014 UNCITRAL Standards for Transparency, Accountability.
PPP’s IN NIGERIA: Prospects in the Water Sector
Energy Regulators Regional Association - present and future - Maria Manicuta ERRA Bucharest APRIL 03-05, 2006 Black Sea Energy Conference.
Key National Indicators and Supreme Audit Institutions: U.S. and INTOSAI Perspectives Bernice Steinhardt Director, Strategic Issues U.S. Government Accountability.
Public Sector Perspective on CSR and Responsibility Who is Responsible for Responsibility? Santiago, Chile September 2005.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
REREP The Regional Environment Reconstruction Programme 7 th REReP Task Force meeting Belgrade, 30 th September – 1 st October 2004 “Report on Stability.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Problems of regulating tariffs for housing and communal services, which create obstacles for developing sub national borrowing March 6, 2007 Alyona Babak,
Workshop Agenda Belgrade, Service Families 2.Regional Solutions 3.Public or Private 4.Operator Models 5.Regional Solid Waste Disposal Arrangements.
PENSION REFORM EXPERIENCES IN CENTRAL AND EASTERN EUROPE Agnieszka Chlon-Dominczak Ministry of Economy, Labour and Social Policy, Poland Kiev, May 28th,
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
EBRD 2010 Regional Assessment of Public Procurement Legal Frameworks Assessment Scope, Focus and Methodology Eliza Niewiadomska EBRD Legal Transition Programme.
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
ETF Conference, Building & Financing European Transport Infrastructure, Brussels, 23rd Oct Building & Financing European Transport Infrastructures.
MUNICIPAL SOLID WASTE MANAGEMENT IN ROMANIA “Achievements and Barriers” Dr.eng. Alexei Atudorei ISWA Board Member Representative of ISWA - RDN Southeast.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen September.
WSSB Capacity Enhancement Workshop 1 Session 3 Contract Management Systems.
EBRD Technical Cooperation Programme Caroline Clarkson Official Co-financing Unit, EBRD Bratislava, 4 March 2010.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
EBRD 2010 Regional Assessment – Scope, Focus & Main Findings on the Public Procurement Law and Practice in the EBRD region Eliza Niewiadomska Legal Transition.
UNIDO Energy Development and Cleaner Production Programmes In Europe and NIS Grzegorz Donocik Chief Europe and NIS Programme Vienna Economic.
Assessing the Capacity of Statistical Systems Development Data Group.
‘State Capture in Transition’: Summary Findings Joel Hellman and Daniel Kaufmann The World Bank
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
MUNICIPAL SYSTEMS BILL September LEGISLATION n Municipal Demarcation Act, 1998 n Municipal Structures Act, 1998 n Municipal Systems Bill (1999)
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Introducing a New Concessions System – Latvian Experience.
SMALL GROUP DISCUSSION SESSION GROUP 2.
WATER AND SANITATION SECTOR (WSS) IN ESTERN EUROPE AND CAUCASUS Strategic Approach of KfW Development Bank Dr. K. Gevorgyan KfW Representative in Armenia.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
EBRD Public Procurement Assessment 5 key questions on eProcurement policies Eliza Niewiadomska Legal Transition Programme European Bank for Reconstruction.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
1 Private Sector Roles in Delivering Public Services: Policy Options for Developing Cities Penelope Brook The World Bank.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
Legal reform in transition countries - the EBRD approach Legal reform in transition countries - the EBRD approach Presentation to World Bank 25 February.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Kathy Corbiere Service Delivery and Performance Commission
Financing Alternatives in WSPs Patrick Nduati Mwangi, WASPA Conference, September 2011 Water and Sanitation Program.
Regional Experiences in Health Financing Reforms Lessons for Uzbekistan? February 2006.
Findings from forthcoming regional flagship report Skills, not just diplomas Findings from forthcoming regional flagship report Lars Sondergaard May 6,
The World Bank and Institution Building in the New Member States and Candidate Countries Financing Growth and Cohesion in the Enlarged EU Daniela Gressani,
FINANCIAL SUSTAINABILITY OF WSPs: Overcoming the Barriers Eng. PETER NJAGGAH WASREB, Kenya Innovative Water Sector financing.7 th – 12 th November 2011,
2016 SWA Meeting of Ministers of Water, Sanitation and Hygiene: Technical Meeting Addis Ababa, Ethiopia, 17 March National accountability mechanisms in.
UNFCCC Technical Workshop on Joint Implementation Bonn, 13 February, 2007 Session 2: Parties Involved in JI Projects – Panel Experiences and Expectations.
Danube Water Conference 2017, Vienna
Sewerage and Sanitation Policies in Indonesia
Danube Water Conference, Vienna, May 2017
Water Supply and Sanitation Projects in Indonesia An Overview of Their Performance International Seminar on Water Supply and Sanitation Sector Reform in.
Alexei Zverev Senior Counsel, EBRD Budapest , 7 March 2007
Michael Jacobsen, Project Director - Water 18 MaY 2017
The SWA Collaborative Behaviors
progress of the water reform in bulgaria
Afrodita Popa Adriana Pienaru
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Cross-Border Cooperation through Environmental Planning and Investment Institutional Strengthening Workshop Budva, Montenegro, 5 September 2007 Policies for reform of water sector utilities in SEE (Balkans)

Session Overview  Introduction to the water sector industry in the Southeast Europe (SEE)  Rationale for reform in the sector  Benchmarking & performance measurement indicators  Key Success Features and Alternatives for reform and transformation  Lessons Learned from Transformation Effort  Conclusions and recommendations

Definition of the Water Sector  Provision of services in: 1.Safe, drinking & continous water supply. Water supply system includes:  Raw water intakes, transmission pipes, drinking water treatment plants;  Water distribution networks, pumping plant, storage reservoirs, and related infratsructure 2.Environmentally accepted wastewater disposal. Wastewater systems includes:  Sewerage network, pumping plants, reservoirs and wastewater treatment plants (WWTPs)

Water Sector Strategic Context in SEE Organization & regulation of water sector  Organized mostly at municipal level: organization through municipal departments or municipal (public) enterprises is the most common form in the region, i.e. municipal WSS (water & sewerage) utilities.  Framework water legislation exists in all countries: the local government water regulation is the most common form, involving municipal authority setting tariffs (political influence)  Coverage of the population with water supply, sewerage and wastewater tretament is far from complete.

Water Sector Strategic Context in SEE Reasons for Poor Performance in Infrastructure:  Delivery of infrastructure services usually occurs without competition  Individuals & organizations responsible for managing & delivering services are not given incentives  Users are not involved in the process* * Source: World Bank, World Development Report 1994, Infrastructure for Development

Transition Indicators of WSS Sector in the CEE Countries – EBRD Perspective Category 1Category 2Category 3Category 4 Albania; Belarus; BiH; Kyrgyz Rep.; Tajikistan; Turkmenistan Armenia; Azarbaijan; Macedonia; Georgia; Kazakhstan; Moldova; Russia; Serbia; Montenegro; Slovak Rep.; Ukraine; Uzbekistan Bulgaria; Croatia; Latvia; Lithuania; Poland; Romania; Czech Rep.; Estonia; Hungary; Slovenia; Minimal Decentralization and Comercialisation Moderate Decentralization and Comercialisation Fairly large degree of Decentralization and Comercialisation Large degree of Decentralization and Comercialisation

The “vicious” cycle of WSS Utility Lack of Financing Poor Management Practices Service performance problems Poor operational efficiency Poor tarrif collection & cost recovery Low “bankability” of municipal utility and its investment projects Deteriorated climate for private sector participation Water services demand: Customer perception, affordability and political acceptability Core Issues

Core Issues of WSS Utilities  Operational Efficiency  Inefficient internal operations  Over-sized or poorly configured systems inherited from the past  Performance problems in service provision:  Low service coverage  High physical water losses and UFW  Unreliable and variable drinking water quality  Inadequate wastewater treatment capacity  Management Practices  Planning, communication, and control

The concept of “Bankable” WSS Utility  The concept incorporates considerations of the creditor’s confidence in both the: 1.Viability of the public utility or municipal government as a creditworthy institution, and 2.Viability of the utility’s investment project to be financed as a reliable source of future revenue flow  “Bankable” WSS utility is defined as one fully recovering:  its operating & maintenance (O&M) costs and taxes  Debt service  Meeting givernance and business performance norms Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

The concept of benchmarking ‘A systematic process of searching for best practices, innovative ideas, and highly effective operating procedures that lead to superior performance, and than adapting those practices, ideas, and procedures to improve the performance of one organization’ Metric benchmarking (Performance Indicators): What is wrong? Process benchmarking (Activities): Why is that wrong?

Performance Indicators in the water sector – metric benchmarking Quantitative comparative assessment of company performance over the time  Water resources indicators  Personnel indicators  Physical indicators  Operational indicators  Quality of Service indicators  Financial and economic indicators Purpose: Identify areas of under-performance

Process Benchmarking  Focused on individual processes (set of activities) within the organization. There are four key processes: 1.Production process 2.Distribution process 3.Sales process 4.General process  The purpose is to improve the performance by “learning from others”

The Transformation Process  The key question: How to end up the “vicious” cycle and successfully transition form the state of poor technical, financial and managerial performance to a “bankable” condition? Key initial factor: The degree of the utility’s autonomy from the municipal government

Key Features Contributing to the Success of the Transformation Process External Features Internal Features Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

Key External Success Features  External Features  Effective and transparent legal/regulatory framework  Strong leadership and political will  Financial assistance from public sources  Fiscal discipline imposed in financial agreements  Coordinated technicall assistance from the international community Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

Key Features Contributing to the Success of the Transformation Process  Internal Features  Public outreach/participation  Fair labor transition process  Installing a business culture within the organization  Improved understanding of the customer base  Accessing external expertise and experience through contracting Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

Transformational Strategies Corporatization Performance Agreements Private Sector Participation Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

Corporatization  The process of restructuring and reform the utility by applying the management practices and internal incentives that “mimic” those of private businesses:  Sound corporate governance  Driven by customer demand and  Focused on financial targets important to achieve operational efficiency and full cost recovery Establish clear commercial objectives Establish appropriate managerial authority and autonomy Implement effective performance monitoring Provide rewards and sanctions for performance Ensure competitive neutrality

Corporatization (cont.)  Corporatization is associated with:  Making rational investment choices where resources are limited by hard budget constraints  Employing cost recovery approaches to maximise user based revenues to the extent possible and within affordability constraints  Ensuring managerial independence while holding utility managers accountable for delivering an acceptable quality of service  Transparency and competition in the procurement of goods and services to ensure good value for money and avoid opaque practices and corruption

Performance-based Agreements  Performance-based agreements between water authorities and local utilities with explicit targets and clear incentives for service providers  Targets may include:  Unaccounted for water  Accounts receivable  Connection efficiency  Performance fee to the operating utility  Penalties may be involved against persistent failure to achieve certain targets

Private Sector Participation  Range of options of private sector involvement with the public sector under different conditions of risk and reward to both parties:  Service contracts  Management contracts  Lease contracts  Concessions  BOT contracts, and  Divestiture (Privatization through sale)

Menu of PSP Structuring Techniques “RISK” (Private Sector Investment Required) “REWARDS” (Returns to The Private Sector) High Low Construction Contract Service/ Management Contract Lease Concession Divestiture Low High

Characteristics of PSP Arrangements Type of contract DurationWhat the public sector receives What the contractor receives Nature of contractor performance Service contract1-3 yearsMinimized costs Improved quality Fee from the government Definitive, technical type of service Management contract 3-8 yearsIncreased efficiency Fee incentivesManage the operation Lease8-15 years Working capital Rent All revenues, fees or charges Manage, operate, repair, maintain Concession/ BOT years Investment capital Concession fee All revenues from consumers Manage, operate, repair, maintain, invest

Lessons Learned fromTransformation Efforts  Take advantage of events that raise public demand for transformation  Seek out and support champions for transformation  Conducive legal/regulatory framework is key  Incorporate public participation into assistance activities  Consider labor implications for transformation  Identify possibilities for mobilizing both public and private resources  Emphasize the application of sound business practices Taken from USAID Publication: Case Studies of Bankable Water and Sewerage Utilities

Conclusions  Poor performance of the water utilities in the Balkans (the vicious cycle)  Low bankability and lack of financing  WSS utility benchmarking as a management tool for assessment and improvement  Different strategies for transformation towards bankable conditions  Key success features for transformation and lessons learned