Experience with Integrated Inspection and IP revision in CR Monika Přibylová.

Slides:



Advertisements
Similar presentations
High Level Group on Administrative Burdens 5 th March 2009 Administrative Burden Reduction in DG Environment Timo Mäkelä European Commission – DG Environment.
Advertisements

© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Better Work Indonesia Pilot Environmental Cluster Assessment Crowne Plaza Hotel, Jakarta, 10 June 2014.
Regulation on Industrial Discharge to Public Sewer Regulation on Industrial Discharge to Public Sewer Kinji YAMADA Kinji YAMADAJSWA.
Environmental Streamlining Task Force Water Quality Ordinance April 5, 2012.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
ECENA 1st Plenary Meeting, January, Zagreb, Croatia 2006
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Harmonization and Implementation/Enforcement of Environmental Legislation in the field of Industrial Pollution Control in Latvia Ilze Kirstuka Director.
Implementation and Enforcement of Environmental Legislation in Cyprus Christos Malikkides Head of Industrial Pollution Control Section Department of Labour.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Federal Energy and Environmental Regulation Agencies and Laws
ENVIRONMENTAL MONITORING AND REPORTING BY ENTERPRISES FEASIBILITY OF DEVELOPING MONITORING GUIDELINES FOR CHEMICAL INDUSTRY IN EASTERN EUROPE, CAUCASUS.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
COWI PowerPoint design manual# Communication & Design Workshop to Promote Ratification of CLRTAP Protocols Project Air Quality Governance in.
SATI TEXTILE GROUP IPPC IMPLEMENTATION 23 March 2012.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Final Conference June Maastricht, The Netherlands 1 Case Study: Kłodnica catchment, (Odra river basin) Poland Janusz Krupanek Institut for Ecology.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Steffen Bloch Nielsen, Juni 2006 Programme 10: :10Introduction to ROVESTA Miljø, 10: :40Relation between authorities and the laboratory 10:40.
Application of minimum criteria for environmental inspections in Bulgaria.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
1 Permitting of industrial facilities in Croatia.
ROMANIA INTEGRATED POLLUTION PREVENTION AND CONTROL - IPPC MINISTRY OF ENVIRONMENT AND WATER MANAGEMENT PRAHA June 2004 Iuliana Chidu EU Counsellor.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
1 st Program of Experience Exchange INSPECTION – PLANNING AND REPORTING (CURRENT SITUATION IN THE REPUBLIC OF CROATIA IN CORRELATION WITH IPPC) Brijuni,
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Jessica Williams. History/ Basic Information The CWA was formerly known as the Federal Water Pollution Control Act, which was made in 1948 and was the.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
The current legal situation
Ministry of Environment, Forests and Water ManagementAlbania ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Role of State Pollution Control Boards in Compliance and monitoring of conditions of Environmental Clearance Item No. 9.0.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium 11 TH STEERING COMMITTEE MEETING BELGRADE, 24 TH JUNE 2015.
Federal Energy and Environmental Regulation Agencies and Laws
CCS and the Environment
Environmental Laws.
Annexes of the Directive 96/61/ES on IPPC
North Area consolidation project
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
ECENA 3rd Plenary meeting
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Relationship between World Bank and Romanian EA requirements
IPPC Review Stakeholder Hearing
Building a PRTR Disclosure System in China
ENVE 321: Intro to Environmental Engineering
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

Experience with Integrated Inspection and IP revision in CR Monika Přibylová

Lonza Biotec Biochemical substances production for pharmaceutical and cosmetic industry Established in 1992 on in former botechnology research institure 2002 – expansion and modernisation – EIA, IPPC Main installations with env. impact: fermentors, boilers for steam production, waste water treatment plant Storage of chemicals

IP history 1st IP issued in 2003 – 14 pages of conditions Till now 6 modifications of IP (intensification of WWTP, additional processes, modification of chemical storage,…) Integrated environmental inspection 1x3 years Last integrated inspection in 9/2013 (water, air, waste inspectors on site)

Result of inspection Inspection protocol – revision of compliance of all IP conditions No breach of compliance About 1/3 of conditions is not relevant any more – in some case inspectors proposed to delete or modify the condiotions Protocol sent only to the operator „It is recommended to modify this condition!“

Application for 7. IP change 1.Recategorisation of air pollution sources + new conditions according to new air law, 2.Deleting some air emission sources from the permit as they have not been installed 3.Inclusion of 2nd emergency energy source (diesel engine) 4.Additional monitoring requirements due to the baseline report 5.Update of operation rules for air pollution sources 6.Deleting or modification of conditions which are not relevent according to recommendations listed in the inspection protocol