UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,

Slides:



Advertisements
Similar presentations
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
Advertisements

Improvements to ME1/1 TMB Algorithm from Simulation Studies US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Alexei Safonov (Texas A&M University) For the EMU community.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Simulation of GEM-CSC Integrated Trigger: Status and Plans US CMS EMU Workshop Vadim Khotilovich, Texas A&M University for GEM DPG group.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
TMB-to-MPC Trigger Data Format Changes related to GEM US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
904 Status Recall last Group Meeting…
SLHC Muon Upgrades and Impact on Trigger
The Ohio State University
Timing/Synchronization Status
University of California Los Angeles
“Golden” Local Run: Trigger rate = 28Hz
Status of Full Simulation for Muon Trigger at SLHC
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Primitives Test Beam Studies
Effect of an ALCT SEU Much-overlooked good stuff
ME1/1 Electronics Upgrade
SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group
Presentation transcript:

UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight, see next page TMB rates Evaldas measuring rates for restricted TMB patterns

UCLA meeting, 2012 Hauser CSC Major Tasks

UCLA meeting, 2012 Hauser3 23-Nov-2012 Update CSC Gantt Chart from Martin

UCLA meeting, 2012 Hauser4 Selected Milestones, early 2013 A tentative & partial list of what seems “reasonable” to allow the work to proceed smoothly: Dec: Junction Box prototype finished, design verified TBD (Dec-Jan): PRR for DCFEB Feb: Patch panel prototype verified Feb: ESR (Electronics Status) and MPR (Manuf. Progress) reviews Mar: ODMB revised pre-production board w/Cu interface Associated software needs to be written in advance Mar: Software migrated from ME4/2 to ME1/1 FAST testing Apr: SX5 area ready to receive ME1/1 chambers May: production of half of the DCFEB, LVDB7, LVMB7 May: pre-production of 12 ODMB, OTMB for test setups Work on a more detailed CSC-specific schedule is ongoing

UCLA meeting, 2012 Hauser5 TMB Pattern Narrowing Test – draft talk TMB trigger patterns (LCTs) are “broad” for every chamber This gives maximum efficiency at lowest muon momentum (P~5 GeV) Inner chamber patterns could be narrowed with small efficiency loss – P is larger (for given P T ), and magnetic bending is less Rates are highest on the inner chambers (ME1/1, 2/1, 3/1, 4/1) Want to request special run(s) to investigate the effect of narrowing TMB patterns During low-luminosity collisions following Machine Development In the shadow of 5 hrs requested by Pixel detector to understand their radiation damage

UCLA meeting, 2012 Hauser6 Goals of the Pattern Narrowing Test Reduce CSC event size By reducing the number of CFEB and TMB readouts per event (especially out-of-time) Currently marginal, will improve with elimination of DCC bottleneck, but event growth could be non-linear Input to HL-LHC trigger studies Decide if replacement of all CFEBs is necessary ($6-8M) Change L1A latency (3.2  6, 10, or 20  s) and L1A rate (100  1000 kHz)? Critical issue is the use of the 96 buffers in the Switched Capacitor Array (SCA) ASIC used on CFEBs Storage of analog charge in 50 ns “buckets” Affected by CLCT “pretrigger” rate

UCLA meeting, 2012 Hauser7 CSC Readout Fragment Sizes FED753FED750 Affected by pile-up (soft muons, neutron hits, etc.) FED753 (ME4/2) anomalous due to ME4/2 No shielding wall, so many back-scattered particles So ME4/2 chambers were split between FEDs With and without ALCT zero-suppression FED753 ~2.7  2.0 kB, more typical FED 2.0  1.7 kB -15% reduction, typically

Stan Durkin CMS Upgrade Week 8 16 Cap Delay Cap Storage (Poisson)Cap Digization (Queue) Beam CrossingLCTL1A·LCT 0.8  sec2.2  sec 26  sec Transfer to DMB Complete Caps can be used for storage when all others in use For SLHC this is the main capacitor usage Data Bottlenecks in CSC DAQ at SLHC CFEB ’ s 96 Capacitors/channel is main DAQ rate limiter DCC ’ s SLINK-64 is second DAQ rate limiter (configurable) Simple Model CFEB Capacitor Storage

UCLA meeting, 2012 Hauser9 CFEB Readout Inefficiency may beacceptable, 0.01 is bad

UCLA meeting, 2012 Hauser10 Rate Plots Vadim – sim - rates integrated over rings Bug fix factor of 2 applied 19E6 Hz at 8E34 L i.e. 11.9E6 Hz at 5E34 L ME2/1 has 36 chambers, so 330 KHz/chamber at 5E34 L Misha – data – rates per chamber 30E3 Hz at 4.1E33 L i.e. 365 kHz/chamber at 5E34 L

UCLA meeting, 2012 Hauser11 Rates for LCTs in ME2/1 at 5E34 Which estimate Type of LCTME2/1 Rate Energy (TeV) DataMatched365 kHz Stan / Cousins et al. CLCT*525 kHz Khotilovich Matched, tightened** 330 kHz14 Rates per chamber at 5E34 luminosity Data/sim comparisons are “reasonable” Rates are likely to be a little higher than “data”… Pretrigger requires 3 layers, not 4 (LCT) Unknown increase from 8 to 13 TeV (Rate per CFEB: nominally divide by 5, but there is an edge overlap factor ~ not included) *CLCT vs. matched makes little difference. NB this was for an earlier version of TMB patterns that were wider. **TMB patterns 8-10 only, “skinny ALCT pattern”, factor of 2 for both endcaps applied

UCLA meeting, 2012 Hauser12 TMB Pattern Test Thus Far B904 ME2/1 cosmic rays Rate dropped 12  4 Hz with TMB pattern >=8 (TMB::CLCT_PID_THRESH_PRETRIG=8) P5 cosmic rays ME4/2 see 3  2 Hz Writing flash (new patterns) on ME2/1, 3/1, 4/1 took 21-27s per crate, so whole inner system ~13-14 min estimated Pattern distributions in CSCTF data Show plot from old Anna presentation for low-Pt muons … rather even by pattern #

UCLA meeting, 2012 Hauser13 TMB Pattern Test Plan With Collisions Use low-luminosity collisions after MD In shadow of 5-hour pixel radiation damage test Change patterns on inner (ME1/1, 2/1, 3/1, 4/1) chambers and ME4/2 Will affect most but not all FEDs, so can see event size difference with/without ME4/2 contribution ME4/2 a bit strange because outer chamber, and might suffer more efficiency loss Tighten + endcap (w ME4/2) to patterns 8-10 only Leave the other endcap alone as a reference Then loosen to patterns 6-10 only