Seung-gi GUG Korea Maritime University Chairman of FERNS TWG Seung-gi GUG Korea Maritime University Chairman of FERNS TWG 24 th -25 th, Sept., 2007 STATUS.

Slides:



Advertisements
Similar presentations
1 Seoul-Melbourne Multilateral MOU on Cooperation in Countering Spam 19 November 2004 Lim, Jae-Myung Spam Response Team Korea Information Security Agency.
Advertisements

Christina Skantze. Baltic Sea Strategy initiative – why? New political context for cooperation – EU-enlargement, integration Underline priorities and.
LORAN-C Friend or Foe? Mike Bedford British Cave Research Association Cave Technology Symposium th April 2010, Horton-in-Ribblesdale, North Yorkshire.
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
1 Cooperation in the Baltic Sea Region: "The EU Strategy" VIII Annual International Conference: CROSS-BORDER COOPERATION: THE RUSSIAN FEDERATION, THE EU.
NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes.
Minimum Requirements for the Issuance of Boatmaster‘s Certificates (Resolution No. 31) – Amendments' proposal SC.3/WP.3 39th Session, Geneva, june.
GHS STOCKTAKING WORKSHOP FOR SOUTHEAST, EAST, AND CENTRAL ASIA Siang –Hee Tan Executive Director Beijing, Sept th 2010.
The Game Plan for Loran-C Modernization John J. Macaluso U. S. Coast Guard Mitchell J. Narins U. S. Federal Aviation Administration International Loran.
The Radio Technical Commission for Maritime Services Report to MACHC-15 Manzanillo, Mexico Rafael Ponce
1 International Family of Economic and Social Classifications United Nations Statistics Division.
LORAN C By Farhan Saeed.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
1METLTM – DAMGM ILA Convention and Technical Symposium 32 nd Annual Convention and Technical Symposium of the International Loran Association Boulder,
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
ELoran Maritime Service Provision: Initial Thoughts By Dr Sally Basker, Professor David Last, Dr Paul Williams Date: International Loran Association, Orlando,
Rolf Zetterberg Swedish Maritime Safety Inspectorate Nordic Institute of Navigation e-Navigation Conference Oslo /17 Status of LRIT.
Differential eLoran Reference Station for Maritime and Precise Time Applications Gerard Offermans, Arthur Helwig, Reelektronika NL International Loran.
“SAFETY THROUGH QUALITY” Vessel Traffic Management and Information System on Romanian Danube ( Ro – RIS )
International Civil Aviation Organization REGIONAL GNSS RELATED ACTIVITIES Secretariat ICAO APAC OFFICE GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
Integration Development Programme in the Field of Statistics of the Eurasian Economic Union for EEC THE EURASIAN ECONOMIC COMMISSION.
32 nd International Loran Association November 3-7, 2003 FERNS Status and Future Tamotsu Ikeda Erik Johannessen Linn Roth.
LONG RANGE IDENTIFICATION AND TRACKING (LRIT) A FLAG STATE PERSPECTIVE
___________________________________________________________________________ 2008/TPTWG30/IEG/01 Agenda Item: 7.0 Action Plan for the Intermodal & ITS Experts.
James T. Doherty Institute for Defense Analyses 16 October 2007
33rd APEC Transportation Working Group Tokyo, Japan October Presenter’s Name: Kinya ICHIMURA Special Assistant to the Director of the Office,
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
Tenth Annual Meeting of the WG: Objectives and Agenda Jennifer H. Madans U.S.A. 10/29/20151.
RECOMMENDATIONS FOR THE INSTITUTIONALIZATION OF THE ACTIVITIES OF THE REMJA WORKING GROUP ON MUTUAL LEGAL ASSISTANCE IN CRIMINAL MATTERS AND EXTRADITION.
STATUS REPORT SWG SO by PLN HAPUA MEETING WORKING GROUP 2 – TRANSMISSION SUB WORKING GROUP– SYSTEM OPERATION 6th Oct 2010, Kuala Lumpur - Malaysia.
Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli:
IRES: an update on the revision process Vladimir Markhonko United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa,
Tripartite Meeting Tokyo, September 2007 Ship Recycling An Overview of Regulatory and Industry Developments Presented by INTERTANKO and ICS on behalf of.
1 International Family of Economic and Social Classifications United Nations Statistics Division.
RSOE Status Report Hungary Belgrade, Roles of RSOE in IWT projects ProjectRSOE role WP5 Leader, Partner Communication Leader, Partner SuAc.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
National Protection and Rescue Directoratewww.duzs.hr Presented by: Mr. Damir Trut, Deputy Director25 February 2008, Bled-Slovenia.
The 22nd Meeting of The IAEA Technical Working Group on Nuclear Power Plant Instrumentation & Control ( TWG-NPPIC) May 2009.
Update on ESCAP Work on Trade Facilitation and implementation of the ROC-TF mechanism Regional Organizations Cooperation Mechanism for Trade Facilitation.
LORAN Modernization Loran Data Channel Mr. Raymond Agostini International Loran Association Orlando, FL October 15, 2007.
FERNS Tamotsu Ikeda Tuesday, October 16、 2 007. REPORT on The Fifteenth Session of the Council of the Far East Radionavigation Service (FERNS) 1. Opening.
Statistical Cooperation with ENP-South Twelfth meeting of the Management Group on Statistical Cooperation March 2010 Luxembourg Agenda item 6.1.
PIANC RIS Guidelines 2011 Edition 3 Smart Rivers Conference 2011 PIANC RIS working group Cas Willems.
European eLoran Status Dr Sally Basker & Dr Nick Ward General Lighthouse Authorities of the United Kingdom and Ireland International Loran Association,
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport policy Bilateral screening:
The importance of resilient position-fixing for e-Navigation George Shaw PNT Seminar, RNN, Stockholm 18 May 2011.
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
Agenda item 1.16 VHF data exchange system (VDES).
1 THE OIE REPORT 32 nd VICH SC Meeting / 6 th VICH Outreach Forum Meeting Jean-Pierre Orand, Anses, France, OIE Collaborating Centre.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
FERNS Status and Future
Status report on CJK NGN Working Group
Activity of the High-Level Group for Partnership, Coordination and Capacity Building for Statistics for Agenda 2030 on Sustainable Development (HLG) Gulmira.
19th GRI Coordination Group meeting
European Labour Law Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli: Please, check the web site for.
Modern Russia’s Approach to Energy Cooperation in Northeast Asia
Status report on CJK NGN Working Group
WRC-07 decisions and follow-up
GSC Emergency Communications Task Force Report (GSC-EM TF)
e-Navigation Overview
3. SafeSeaNet A data exchange network and a standardisation of the main information available on ships (all flags) and their cargo Providing a clear picture.
WSC Market Report Task Force Meeting
European Labour Law Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli: Please, check the web site for.
United Nations Statistics Division
Task Force on Target Setting and Reporting TFTSR
Structural Funds: Investing in Roma
United Nations Statistics Division
United Nations Statistics Division
Presentation transcript:

Seung-gi GUG Korea Maritime University Chairman of FERNS TWG Seung-gi GUG Korea Maritime University Chairman of FERNS TWG 24 th -25 th, Sept., 2007 STATUS and FUTURE of FERNS CHAINS AD HOC MTG on LORAN/CHAYKA, Haugesund, Norway

2 1. Overview on Far East Chains Contents 2. Activities of FERNS 3. Required Modifications to Implement e-Loran 3. Required Modifications to Implement e-Loran 4. Conclusions

1. 1. Overview on Far East Chains

4 Far East Radio Navigation Service

5 FERNS chains(6 chains, 16 stations)

6 ADMIMISTRATIVE SCHEME FOR FERNS COOPERATING CHAINS FERNS Council IICMOMAF, KoreaJCGCMSA T: F: T: F: T: F: T: F: Khabarovsk CSDaejeon CSChiba CS T: F: T: F: T: F: T: F: B-ChainC-ChainD-ChainE-Chain Alexandrovsk Petropavlovsk Ussuriisk Tokatibuto Okhotsk Pohang Kwangju Gesashi Niijima Ussuriisk Niijima Gesashi Minamitorishima Tokatibuto Pohang Rongcheng Xuancheng Helong F-Chain Xuancheng Rongcheng Raoping G-Chain Hezhou * Raoping Chongzuo B = Russian chain(Russian-Japanese) C = Korea chain(Korean-Japanese-Russian) D = N.W. Pacific chain(Japanese-Korean) E = China North Sea chain, F = China East Sea chain, G = China South Sea Chain

2. Activities of FERNS

8 Activities ◦ Sessional Council Meeting - Annual MTG hosted by Rotation among the Member Countries - on the General Matters for the Chain Operations according to FERNS Agreement and Operational Guidelines - 16 th Session : 29 th Oct. – 2 nd Nov. 2007, Tokyo, Japan ◦ Technical Working Group Meeting - Intersessional MTG of the Council MTG (if needed) - during the Sessional Council Meeting - on the Technical Matters for the Chain Operations & other Radio-navigation services ◦ Bilateral Meeting - during the Sessional Council Meeting - on the Technical Matters between 2 countries concerned ◦ Joint Measurement & Meeting (annually, Japan- Korea) - Measurement for Loran Signal Using the Evaluation Vessels - Data Exchange

9 Agenda 1. Opening of the session. 2. Adoption of the agenda. 3. Presentation of reports by each country on the Loran- C/Chayka programme. 4. Operational matters for FERNS co-operating chains. 5. Technical matters for FERNS co-operating chains. 6. Co-ordination of other radionavigation services in the Far East. 7. Any other business. 8. Date and venue of the next session. 9. Closing of the session. Council Meeting

10 Technical Working Group Improvement program for FERNS Co-operating Chains (Task 1) (1)Collect information on Loran-C in USA, Europe, IALA and others (2)Develop technical improvement of Loran-C/Chayka among operational countries concerned (3) Survey activities on radionavigaion including future plans in foreign countries except FERNS member states. (4)Prepare a draft future plan of FERNS Co-operating Chain Mutual interference between DGNSS stations (Task 2) (1)Confirm or review locations of DGNSS stations deployed in Far East Region (2)Prepare an up-dated survey report on mutual interference between DGNSS stations (3)Study the method for improvement on technical and operational issues of the DGNSS system (4)Prepare a draft report for DGNSS improvement plan

11 Technical Working Group Information exchange on future plan of DGNSS in FERNS members (Task 3) (1) Understand the current activities and future program on DGNSS in IALA (2) Consider and discuss the future program on the technical cooperation of DGNSS in Far East Region Information of the type of Loran-C/Chayka and other integrated user equipment (Task 4) (1)Exchange technical information on radio navigation user equipment (2) Report the result of the field survey on Loran-C/Chayka users and equipment Practical use of AIS in the AtoN field (Task 5) (1) Exchange information on AIS application and prepare the report concerned (2) Discuss the expansion of AIS applications Interim report at the session of FERNS Council in 2007 & 2008 respectively Final report at the 18th Session of FERNS Council in 2009

12 North West Pacific Chain (GRI 8930) 5 Korean Chain (GRI 9930) Joint Measurement

13 Best Combination of Station(GRI8930) Best Combination of Station(GRI9930) Voyage No : Period : – 5.17(37days) Period : – 5.17(37days) Measurement Area : South Sea Measurement Area : South Sea Cruising range : 2,368NM Cruising range : 2,368NM W/X(0.8%), W/Y(6.9%),W/Z(91.5%) W/X(0.8%), W/Y(6.9%),W/Z(91.5%) Y/Z(0.75%) [ 等級區分 ] W/X0.8% W/Y6.9% W/Z91.5% X/Y X/Z Y/Z0.75% [ 等級區分 ] W/X15.5% W/Y1.7% W/Z X/Y82.8% X/Z Y/Z Voyage No : Period : – 5.17(37days) Period : – 5.17(37days) Measurement Area : South Sea Measurement Area : South Sea Cruising range : 2,368NM Cruising range : 2,368NM W/X(15.5%),W/Y(1.7%),X/Y(82.8%) W/X(15.5%),W/Y(1.7%),X/Y(82.8%) 6 Joint Measurement

14 Best Combination of Station(GRI8930) Best Combination of Station(GRI9930) 60.3% 36.3% 3.4% W/Z X/Z Y/Z X/Y W/Y W/X [ 等級區分 ] Voyage No : Period : – 7.26(42days) Period : – 7.26(42days) Measurement Area : East Sea Measurement Area : East Sea Cruising range : 1,609NM Cruising range : 1,609NM W/X(2.05%),W/Y(18.25%),W/Z(37%), W/X(2.05%),W/Y(18.25%),W/Z(37%), W/Z(0.25%),Y/Z(42.45%) Voyage No : Period : – 7.26(42days) Period : – 7.26(42days) Measurement Area : East Sea Measurement Area : East Sea Cruising range : 1,609NM Cruising range : 1,609NM W/X(3.4%),W/Y(36.3%),X/Y(60.3%) W/X(3.4%),W/Y(36.3%),X/Y(60.3%) [ 等級區分 ] W/X2.05% W/Y18.25% W/Z37% X/Y X/Z0.25% Y/Z42.45% 7 Joint Measurement

15 Best Combination of Station(GRI8930) Best Combination of Station(GRI9930) [ 等級區分 ] W/X19.3% W/Y15.9% W/Z X/Y62.3% X/Z1.43% Y/Z1.05% [ 等級區分 ] W/X W/Y20.3% W/Z79.7% X/Y X/Z Y/Z Voyage No : Period : – 11.4(18days) Period : – 11.4(18days) Measurement Area : West Sea Measurement Area : West Sea Cruising range : 1,667NM Cruising range : 1,667NM W/Y(20.3%), W/Z(79.7%) W/Y(20.3%), W/Z(79.7%) Voyage No : Period : – 11.4(18days) Period : – 11.4(18days) Measurement Area : West Sea Measurement Area : West Sea Cruising range : 1,667NM Cruising range : 1,667NM W/X(19.3%), W/Y(15.9%), X/Y(62.3%), W/X(19.3%), W/Y(15.9%), X/Y(62.3%), X/Z(1.45%), Y/Z(1.05%) X/Z(1.45%), Y/Z(1.05%) Joint Measurement

16 Voy No.1 Voy No.2 Voy No.3 Voy No.4 Voy No.5 Voy No.6 Voy No.7 Voy No.8 Voy No.9 Voy No.10 Joint Measurement

17 Voy No.1 Voy No.4 Voy No.5 Voy No.8 Voy No.9 Joint Measurement

18 Joint Measurement

3. Required Modifications to Implement to e-Loran

20 To implement to e-Loran Goals of e-Loran Better Accuracy Improved Availability System Integrity Continuity

21 To implement to e-Loran DescriptionsStatus TOT ControlNo UPSNo Fast Coupler SwitchYes UTC SyncNo Cesium SteeringNo TCS (Transmitter Control System)No ABS (Automatic Blink System)No Data ChannelNo How many users? e-Loran Status of Korean Chain

22 To implement to e-Loran Upgrade for eLoran System-Price ( ) Item Description Local In- Country Korean contractor cost Harbors Pohang LORSTA Cost Kwangju LORSTA Cost Chain Control Cost Pyangteg Monitor Cost Gonjulgap Monitor Cost 1 Time of Transmitter Control 92,000 23,000 2UPS200,000200,00 3TCS(including ABS)1,265,0001,150,000575,000 4Data Channel230, ,000 5 RAIL(Remote Automated Integrated Loran) 288,000 6Upgrades SAM Control58,000 7 Differential Loran Integrity Monitor 115,000 8 Differential Loran Reference Station 220,000 9 ASF Compensation and Chain Calibration Survey TBD eLoran receivers at $1000 each 550,000 Sub. total$550,000$220,000$2,190,000$2,075,000$850,000$81,000 11Installation $233,000 Grand total $6,280,000

4. Conclusions

24 WHAT’S THE FURTRUE OF LORAN IN FAR EAST? On the Assumption that …… WHAT’S THE FURTRUE OF LORAN IN FAR EAST? On the Assumption that …… Essential Conditions How to increase the Users? (Mandatory or Regulation???) Opening & Providing the eLoran Technology (No special Permission or Patent to use it) Cooperation among Countries concerned the chain operation Revising the FERNS Agreement and Operating Guidelines (with the diplomatic channel)

25 Thank you for your kind attention! Thank you for your kind attention!