Presentation is loading. Please wait.

Presentation is loading. Please wait.

WSC Market Report Task Force Meeting

Similar presentations


Presentation on theme: "WSC Market Report Task Force Meeting"— Presentation transcript:

1 WSC Market Report Task Force Meeting
Shanghai, February 2011

2 Contents 2011 Market Report (Excel version)
Revised Table of Contents and proposed Deadlines Action items and proposed deadlines New/additional topics for 2011 Special Report from Japan

3 Revised table of contents with timeline – part 1
To be provided by the Association in: Due Date: 1. World Semiconductor Market Analysis 1.1 Executive Summary Japan 31 March 1.2 Regional Market Developments 1.2A China China 1.2B Chinese Taipei Chinese Taipei 1.2C Europe Europe 1.2D Japan 1.2E Korea Korea 1.2F USA USA 2. Worldwide semiconductor market 2.1 Semiconductor market size and growth 2.2 Market size by product 2.3 Market growth rate by product 2.4 Market size by region 2.5 Market growth rate by region 2.6 Market size by application   2.7 Selected Data on Key End Markets 2.7A Electronic equipment production - China 31 March 2.7B Electronic equipment production - Chinese Taipei 2.7C Electronic equipment production – Europe 2.7D Electronic equipment production - Japan 2.7E Electronic equipment production - Korea 2.7F Computer equipment production – US

4 Revised table of contents with timeline – part 2
To be provided by the Association in: Due Date: 3. Import / Export Data 3.1 China China 31 March 3.2 Chinese Taipei Chinese Taipei 3.3 Europe Europe 3.4 Japan Japan 3.5 Korea Korea 3.6 USA USA 4. Supplemental data 4.1 Data on capital expenditures 4.1A China 4.1B Chinese Taipei 4.1C Europe 4.1D Japan 4.1E Korea 4.1F USA

5 Revised table of contents with timeline – part 3
To be provided by the Association in: Due Date: 4.2 Data on R&D expenditures 1997 – 2010 4.2A China —— 4.2B Chinese Taipei Chinese Taipei 31 March 4.2C Europe Europe 4.2D Japan Japan 4.2E Korea Korea 4.2F USA USA 5. Background

6 Action items and proposed timeline
All Associations to check and confirm due dates, or communicate alternatives (meeting) All Associations – if not done already- to communicate TF member details to SIA in Japan Proposed timeline: First set of data by: st March SIA in Japan to distribute first consolidated excel version, and send to IAs by: th April IAs to send comments by: th April SIA in Japan to circulate draft presentation version, and send to IAs by: th April IAs to send comments to SIA in Japan by: th May Final Excel & Presentation version by: th May

7 Special Report from Japan: Proposed Topic
Provided by SIA in Japan TV & LED TV Market Newly Developed Product (3D, Smart TV, etc.) LED Market Energy-saving Product … and so forth

8 Timelines of Special report from Japan
Deadlines to follow WSC normal report

9 Thank You For Your Attention !


Download ppt "WSC Market Report Task Force Meeting"

Similar presentations


Ads by Google