Band-2 Prototype Cartridge Project – Summary for ASAC meeting Optical design was completed, implemented and characterized. MMIC CLNA designs complete,

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

ALMA BAND 2 EVALUATION RECEIVER AT THE 12 m TELESCOPE David Forbes, Thomas Folkers, Robert Freund, Eugene Lauria, Martin McColl, Mark Metcalfe, George.
Silicon-Organic hybrid Fabrication platform for Integrated circuits Kick-off Meeting 01/08/2010 Partner Presentations - UKA.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Systems Analysis, Prototyping and Iteration Systems Analysis.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Integrated Receivers.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Institute of Astronomy and Astrophysics, Academia Sinica (ASIAA)
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array NRAO Millimeter/THz.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
ECE1352F University of Toronto 1 60 GHz Radio Circuit Blocks 60 GHz Radio Circuit Blocks Analog Integrated Circuit Design ECE1352F Theodoros Chalvatzis.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
1 CMPT 275 Software Engineering Software life cycle.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
ANASAC Meeting Title North American ALMA Development Program Review Michael Shannon, Program Manager 17 September 2013.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
KFPA LO Modifications (from single pixel results) Critical Design Review January 30, 2009 G. Anderson.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
1 mm Polarization Science with CARMA Chat Hull UC Berkeley, Radio Astronomy Laboratory Collaborators: Dick Plambeck, Greg Engargiola, & all the CARMA staff.
Sharing Differentiation Suggestions Refining Collaboration Goals December 7, /18/20151.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Construction of a Heterodyne Receiver for Band 1 of ALMA N. Reyes 1, P. Zorzi 1, F. P. Mena 1, C.Granet 2, E. Michael 1, C. Jarufe, F. Colleoni, Francisco.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Infrasound Technical Workshop 2008 Session 1 Summary – Sensors and Calibration.
1 mm Polarization Science with CARMA
IRAM 08/02/12 – Run 3 Cryostat New Pulse-Tube (helium-free). Laboratory performances : Cooling-down time  30-48h Number of cooling cycles so far12 Base.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Australia Telescope Users Committee Technologies Report - Oct 2008.
Click to add text Systems Analysis, Prototyping and Iteration.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Q, Ka, K, Ku & X-Band Receivers
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
BPM for Spectromety development status A. Lyapin.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
THz SIS devices and waveguides AETHER Sub-Task 4.2 & 4.3 KOSMA: University of Cologne Karl Jacobs, Netty Honingh 1.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
NERC Published Lessons Learned Summary
for the KOSMA Detector and
Beam Measurement Characterization and Optics Tolerance Analysis of a 900 GHz HEB receiver for the ASTE telescope Alvaro Gonzalez, K. Kaneko, Y. Uzawa.
Design of the 64-channel ASIC: status
Status of the Mechanics at Ciemat.
Complementary ISTC Projects #3888, 3889p
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Mini-drawers, FE-ASIC , Integrator
VMM Update Front End ASIC for the ATLAS Muon Upgrade
WP02 PRR: Master Oscillator and RF Reference Distribution
iALMA WP4 – ALMA band 2 passive components
iALMA WP4 – ALMA band 2 passive components
EVLA NSF Mid-Project Review System / Antenna Status
Harmonisation Working Group Update on Harmonisation Project
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Inflating Padding Antifracture Girdle
EVLA Advisory Committee Meeting System Status
Correlator Growth Path
An GHz integrated, multi-chip downconverter designed and built at the CDL by Matt Morgan and Tod Boyd. The white substrates are.
Undulator Cavity BPM System Status
ThomX – Commissioning Meeting – 25/01/2018
Breakout Session SC3 – Undulator
Performance of the Band 3 ( GHz) receiver for ALMA
Presentation transcript:

Band-2 Prototype Cartridge Project – Summary for ASAC meeting Optical design was completed, implemented and characterized. MMIC CLNA designs complete, wafer run in progress at the foundry, expected completion is January Prototype cold cartridge has been assembled and tested – comprises of final designs for horn, OMT, feed-throughs – but still using backup hardware (e.g. “chip- and-wire” CLNAs) where necessary. A prototype WCA/LO has been assembled and integrated with an interim single polarization 2SB downconverter (based on commercial mixers) after existing MMIC 2SB chips (originally proposed for this project) were found to have a problem. Made preliminary measurements for the Band-2 receiver, iterated receiver configurations, and have a new optimized signal flow configuration based on these initial results (e.g. need to add RF post amplifier, RF band definition filter etc). Currently waiting for parts to implement the final dual-polarization 2SB mixers – expected to be available by end of October Once the revised configuration of the dual polarization 2SB down-converter is completed, final evaluation of the Band-2 prototype receiver will commence in early November. Intend to finish evaluation by December 2015, to allow sufficient time for documentation/final report.

Band-2 Prototype Cartridge Project Band-2 Cartridge as installed in test cryostat

Band-2 Prototype Cartridge Project We have integrated a backup mixer into the LO WCA, so as to continue with cold cartridge Photo of a standard Band-6 WCA modified to incorporate a RF amplifier and RF down-converter (one-channel, temporarily for initial testing).

Band-2 Prototype Cartridge Project F=92 mmF=86 mmF=87.2 mm Horn diameter = 0.591” Aluminum mandrel for the Band-2 horn after electro- deposition Finished Band-2 Horn Finished Band-2 Lenses Test Mandrel cut open after electro-deposition Mandrel prior to deposition

Band-2 Prototype Cartridge Project RF hybrid used for the single channel 2SB down-converter built using a pair of commercial mixers. A dual channel version of the RF hybrid is being machined in the CDL workshop to implement the final down-converter.