ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.

Slides:



Advertisements
Similar presentations
D-Link Assist Introduction Neil Patel October 2010.
Advertisements

S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
DSS Advisory Board Christoph Schäfer Rack Safety System.
HV system migration to USB interface Presented by Korolev M.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
LV and HV status of the RPC system RPC detector and trigger group.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Status of NA62 straw electronics Webs Covers Services Readout.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
19/05/10FV 1 HyTec crate – DCS integration issues.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Systec CAN-USB Box ― Overview and Status JCOP Team Meeting 2 November 2006 Beat Jost/Cern-PH.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
10/09/10FV 1 News and observations from Brussels' meeting.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
LAV front-end and readout status
DCS WG report 9/09/11 FV.
EMU Slice Test Run Plan a working document.
DCS WG report 9/09/11 FV.
The initial step on your ABB care journey
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Specifications What should it cover Goods Services Warranty
Presentation transcript:

ISEG HV power supplies for NA62 R. Fantechi 6/4/2011

Facts Iseg approach triggered by Large Angle Vetoes – Reasonable solution to be used instead of the old OPAL distributors Not reliable No current measurement No capability for single channel on/off Painful integration in the NA62 DCS – Specific components selected Crate ISEG ECH 238_1200W – 8 slots, CANbus control HV module EDS n_504 – 32 channel, 1 crate slot, CANbus control via backplane – 0-3KV, 500  A/channel, floating ground – Already used at CERN

DCS compatibility Thanks to Mateusz Lehmann (ALICE) I got the confirmation from Iseg that EDS n_504 and ECH 238_1200W are compatible with fw component. Below few comments about these crates : “ The ECH 238_1200W is equipped with another CAN-controller than the old Crates. But, to be compatible with older systems, these controllers also are "downwards-compatible". That means, via a software switch, the units can be switched into the "old" operating mode of the ECH 238 Crates (same Items, same commands....). Also, if they are not switched into the old operating mode, they can be controlled with the same control software like the old ones, because new commands are only added, not replacing old ones. (Currently I am not sure which new commands are implemented, because the system is quite new) “ Difference between Iset and Itrip: “ Iset and Itrip are different commands depending on the type of module. For example the EHS F6 60 units have an Iset. If KillEnable is disabled, Iset means the unit shall limit the output current at this value. So if this current value is reached, the unit is switching into current control mode and the voltage is following the current. If KillEnable is enabled and Iset is set, the channel will shut down as soon as this current value is reached. The Distribution modules of EDS series (like EDS or EDS ) are not equipped with a current control. So in these modules there can only a value of current be set for the shutdown. This is Itrip. So if Itrip is reached, the channel will shut down and not limit the output current. “

Offers - 1 Several interactions with ISEG – First of all a LAV-only enquiry What is needed + 1 crate and 10 boards as spares The first offer has an error (prices swapped): use the actual prices 84 HV boards, 13 cratesEuro 84 boards, 3380 euro/unit crates, 3680 euro/unit optional fans, 340 euro/unit Total Total with 13% rebate

Offers - 2 Interest for the same hardware by MUV, SAV, CEDAR – Offer for more objects Some more uncertainty about delivery as some parts come from Japan A first delivery of 3crates/24modules after weeks, the rest after one month 112 HV boards, 16 cratesEuro 112 boards, 3380 euro/unit crates, 3680 euro/unit optional fans, 340 euro/unit Total Total with 16% rebate

Offers - 3 Additional request for a split order – Buy three full crates first Make extensive tests on a real case – Then buy the rest – In this case only 8% rebate for the first order, then 16%. Additional 7.5 K€ – Then better to order all the modules with a split delivery. Questions about the order – To NA62 Steering Committee: source of funding and subdivision We know already that the LAV part is covered by the insurance compensation for the 2008 flood – To CERN administration: the procedure for the order Need a tender, pass through committees, could Epool be involved, etc.

Maintenance contracts Hardware and software contracts being discussed – EP Pool for the hardware They will prepare a list of all material used at CERN Form the basis of discussion with ISEG All the hardware present at CERN will be included The future NA62 hw will be included Experiment contribution proportional to the installed hw base Fixed fee for a repair of a module 2 year warranty for the purchased modules Validity of the contract (as with Wiener and CAEN) up to end 2019 – EN/ICE for the software Takes over the responsibility of OPC server from ALICE when the contract will be activated Contract being drafted 3 levels of support – Description of the problem and remote reproduction analysis at ISEG site – Remote access to CERN by an ISEG engineer – A visit of an ISEG engineer at CERN (not covered by the contract)