TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.

Slides:



Advertisements
Similar presentations
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
Advertisements

The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
Approved Plots from CMS First Beam Runs 2-October-2008.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Early Commissioning of ATLAS First North American ATLAS Physics Workshop Tucson J. Pilcher University of Chicago.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
14/6/2000 End Cap Muon Trigger Review at CERN 1 TGC LVL1 Trigger System Link C.Fukunaga/Tokyo Metropolitan University TGC electronics group System link.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Preliminary analysis of p-Pb data update n. 6 Lorenzo Bonechi LHCf Catania meeting – 19 December 2013.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Luca Spogli Università Roma Tre & INFN Roma Tre
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
CLAS12 Drift Chamber Prototyping
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Integration and commissioning of the Pile-Up VETO.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Abstract Several models of elementary particle physics beyond the Standard Model, predict the existence of neutral particles that can decay in jets of.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
PRR of the TGC SLB and SSW (Reported by CF)
CMS muon detectors and muon system performance
CSC Trigger Primitives Test Beam Studies
Preparation of the CLAS12 First Experiment Status and Time-Line
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
8th International Conference on Advanced Technology and
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Global Trigger Finds Correct BX
Presentation transcript:

TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖

2004/12/ アトラス総会 2 Electronics commissioning concept ► TOF has been calculated, cable delay has been measured. ● Fine variable delay tuning (sub-nano step). ► Synchronization at early stage ● Easier tuning and reliable operation ● Coarse variable delay tuning (12.5 nsec step) ● Checking on test bench is effective ► One or a few parameters for Level 1 buffer depth and Beam crossing clock phase turning L1B BC clock High-pt board Sector Logic Star switch Slave board Patch panel ASD MuCTPI Synchronous 40 MHz beam crossing clock L1B

2004/12/ アトラス総会 3 Schedule Periodprogramitems during 2005 Mass production of electronics Bench testCrucial check of circuit performance From Feb commissioning of a 1/12 slice test pulse and cosmic-ray Fine delay including chamber response After installation, Nov. 2005: M1 2006: M2, M3 test pulseCoarse delay for synchronous circuits. Level 1 buffer depth Chambers are readyCosmic rayOverall check of up to now Trigger for other detector 2007 Single beam operation beam halo beam gas Overall check of up to now Bunch crossing clock phase Trigger for other detector

2004/12/ アトラス総会 4 Inspection of circuits using test bench ► Slice test using completed circuit (at KEK?) ► Validation of trigger performance ► Hardware simulation software is ready ● hit pattern trigger signal High-pt board Sector Logic Star switch Slave board Patch panel ASD BCID Software

2004/12/ アトラス総会 5 Trigger signal from TGC ► limited angle, only from vertex Low pt High pt Low pt High pt M1 M2 M3 Z (mm) R (mm) From Update of Technical Design Report, 09 June 2000

2004/12/ アトラス総会 6 On detector 1/12 slice test using test pulse and cosmic ray ► Assembling of 1/12 of TGC at building 180 ► Objective ● Final check of chamber and elec. before installation ● Fine delay value confirmation ► Remarks ● Angle of cosmic ray is limited for triggering ● Trigger board with FPGA High-pt board Star switch Slave board Patch panel ASD Trigger board

2004/12/ アトラス総会 7 TOF Test pulse run ► Pulse to ASD via Patch panel through variable delay ► Objectives ● Confirmation of Coarse delay value ● Level 1 buffer depth turning ► Remarks ● Simulate signal from particle ► Time of Flight ► Cable length correction High-pt board Sector Logic Star switch Slave board Patch panel ASD MuCTPI Synchronous Test Pulse L1B

2004/12/ アトラス総会 8 ~ 5 million cosmic muons enter the cavern enter the cavern in 15 minutes in 15 minutes upper hit lower hit Event Cosmic ray run ► Objectives ● Confirmation of delay values ● Chamber response to real particle ● Supply trigger for other detectors ► Remarks ● Mainly vertical flux ● TOF correction by delay should be reversed at upper side ATLAS Overview Week ATLAS Overview Week Saturday 02 October 2004 Pre-collision overview R McPhersonR McPherson Univ. of Victoria R McPherson

2004/12/ アトラス総会 9 Total  rate 105 kHz E  > 10 GeV 16 kHz E  > 100 GeV 1 kHz E  > 1 TeV 10 Hz L=10 34 Muons at cavern entrance E (GeV) Single beam run Beam halo muon Scattering of beam by residual gas Objectives ● Beam crossing clock phase tuning ● Overall check ● Provide trigger for other detectors Remarks ● Halo, only inner, TOF corr. reversed at upstream ● Gas, low pt. ATLAS Overview Week ATLAS Overview Week Saturday 02 October 2004 Pre-collision overview R McPhersonR McPherson Univ. of Victoria R McPherson

2004/12/ アトラス総会 10 Summary of Programs ► Run type, turning parameters Ratetiming L1B depth turning BC clock phase turning Trigger for other detectors From when 1/12 slice test goodfine delayNo assembling of 1/12 Test pulsegood Coarse delay yesNoyes cabling and low vol. Cosmic ray vertical mainly yes TOF corr. No yes TOF corr. HV on Beam halo inner mainly yes TOF corr. yes TOF corr. yes TOF corr. Single- beam Beam gas yes low pt yes Single- beam

2004/12/ アトラス総会 11 Summary ► Trigger performance check at bench test with hardware simulation software ► Timing parameter confirmation and tuning at commissioning stage, step by step ► Test pulse ► Cosmic ray ► Single beam; beam-halo and beam-gas ► Detector performance test by cosmic and single beam run ► Cosmic ray ► Single beam; beam-halo and beam-gas