Presentation is loading. Please wait.

Presentation is loading. Please wait.

PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection.

Similar presentations


Presentation on theme: "PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection."— Presentation transcript:

1 PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection

2 Overview Requirements –Receives LVDS differential signals from two ASD Boards (2 x 16-ch) –BCID Variable delays (common for 16-ch signals from a ASD Board) for phase adjustment, variable delays for the clock Effectively wider gate width than 25 nsec –Variable delays 25 nsec dynamic range with a step of sub-nano sec. –Two Test Pulse Generators for two ASD Boards with variable amplitude and variable delay –JTAG Control Process –0.35  m full-custom CMOS (Rohm)

3 Block Diagram of Patch-Panel ASIC

4 LVDS Receiver (I) Propagation delay vs. amplitude and offset voltage

5 LVDS Receiver (II) Dependence on supply voltage

6 Variable Delay (Block Diagram)

7 Delay of 32 delay units vs. VCON

8 Dynamic Ranges and Steps of the Variable Delay

9 Chip variation of the delay

10 Dependence on supply voltage

11 Dependence on ambient temperature

12 BCID Circuit

13 Effective Gate Width (26 – 48 nsec)

14 Test Pulse Generator

15 Supply voltage dependence of the amplitude

16 Control via JTAG BYPASS, No Boundary Scan –TRST_ is not supported. BCID (Port-A and Port-B) –Mask, Signal Delay, BCID CLK Delay, Gate Width Test Pulse (Port-A and Port-B) –Amplitude, Fine Delay, Coarse Delay Debug Variable Delay SEU flag

17 Control via input pins POL –Set whether anode or cathode signals PLL –ENB, ENV, ENP, SELECT_ENP (test purpose) –STEP0, 1:The number of Delay Units in PLL STEP decides the dynamic range and a step of the Variable Delay BCID skip (BYPASS) Test Pulse Trigger (TPTRG) RESET_ –Reset all the register to the defaults. –Initiate PLL lock sequence

18 Radiation Environment (Patch-Panel ASIC) TID RTC=10.5 krad –SFsim=3.5, SFldr=5, SFlot=2 RTC=0.3 (Gray/y) x 3.5 x 5 x 2 x 10 years = 105 Gray Simulated Radiation Level (SRL) for SEE –SRL = 2.11 x 10 10 h/cm 2 /10years Rohm 0.35  m CMOS Process –The same process with SLB ASIC We can deduce the radiation effect from the result of SLB ASICs. The voting logic is used to all the instruction and data registers.

19 Radiation Test (TID) Research Center for Nuclear Science and Technology (RCNST) in Univ. of Tokyo (26 Nov. 02) – 60 Co, 0.954 krad/min., 4 samples 30, 30, 30 and 85 krad –Biased during irradiation Current measurement –The increase of the current can be observed at more than 30 krad. –Functionality checks before/after irradiation No functional defect was observed in all 4 chips.

20 DC current (TID)

21 Radiation Test (SEE) AVF Cyclotron at CYRIC of Tohoku Univ. –Proton beam: E=70 MeV, I=2-4 nA –Beam Fluence and profile using dosimetry 0.1mm thick Cu foil put on the DUT Gamma-ray spectra from activated radioisotopes will be measured using a Ge detector. Intensity distribution of the  -ray will be measured with an Imaging Plate. 4 ASICs will be tested. Beam time is 17-18 Dec. (48 hours)

22 Mass-Production 10,368 + spares = 15,000 working chips –The re-production of the mask will dominate the price. Combine the mask and mass-production with other ASICs –JRC ASIC (5 mm x 5 mm, 1600 chips) –SLB ASIC (10 mm x 10 mm, 3000 chips) –Rohm has started their consideration how to proceed the mass-productions. –International Tendering in summer 2003 –Completion of the mass-production by the end of 2003

23 Inspection At IC production line (Rohm) –Need negotiations, but they are hesitating. DC parameters (DC currents) At KEK –AC measurements PPGs, FIFO Modules and PT4 modules in VME Development of a Test Board and software Comprehensive tests should be done as a PS-Board –2 [person X month] Manpower for inspection


Download ppt "PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection."

Similar presentations


Ads by Google