Business unit (if required) www.btwholesale.com. business unit (if required) www.btwholesale.com SDH Serving Nodes Determination at the Point of Handover.

Slides:



Advertisements
Similar presentations
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Advertisements

BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE INDEPENDENT.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Geoff Hammond Head of Revenue Assurance. Agenda Interconnect – CRAB the start Current Wholesale Revenue Assurance Focus PPC current position PPC Radial.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
Internal Application: Old Process Hiring Agency Post position Receive HCM-4B Prepare HCM-9 Send to applicant services Receive 9&4B Print and review Send.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Interconnect Policy & Contract
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Ophthalmic Payments National User Group Meeting 2 nd July 2009.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Interconnect Policy & Contract
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.
MSIL Discussion with Industry Steve Wright/Doug Harrison 11 th January Issue 1.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
PeopleSoft Travel/Expense CONUS. Overview What is driving this change? What is changing? Where can I find all this information? FSKU Process impact demo.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Online Business Account
18-WAN Technologies and Dynamic routing
Placing an order for Etherway Fibre and Etherflow Connected
IGG Agenda – 30th October 2008 Minutes from last IGG meeting
Exit Capacity Substitution and Revision
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Cost Allocation review – CoMC update August 18
Joint Office Presentation for Modification 0678
XRN4790 – Introduction of winter read/consumption reports
Action NTS0504: - Provide comparative demand data over a sample number of years NTS Charging Methodology Forum (NTSCMF) 23rd June 2014.
Information Provision for Transitional Exit Capacity
Accounting Services Updates
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
NCC Carrier Price List (CPL) Guidance Slides
Customer Issue Management CoMC Update for April & May 2019
Customer Issue Management CoMC Update for June 2019
How to Cease your Service
Customer Issue Management Dashboard CoMC
Presentation transcript:

business unit (if required)

business unit (if required) SDH Serving Nodes Determination at the Point of Handover (A- End)

business unit (if required) Agenda Published data Serving SDH nodes for CSH ISH ISH Extn Data Process Questions

business unit (if required) Published Data 5 files are produced Postcode to Serving Exchange File (PSEF) Supplementary PSEF Serving Exchange File DPCN file SDH Node file The files are available on the BTWholesale.com website

business unit (if required) Partial Private Circuit pricing - CSH CSH SDH serving node is determining by matching the postcode to the Main Distribution Frame using either the Postcode to Serving Exchange File or The Supplementary Post code to Serving Exchange file. The MDF from either of the files above is matched in the Serving Exchange file. Exceptions:- Where the postcode is not available, then the grid reference is used to determine the charging SDH node. Where match is to a PDH node, the nearest Serving SDH node is used SDH node CP CSH Building CSH Link BT Responsibility CP Responsibility Postcode or GR

business unit (if required) Partial Private Circuit pricing - ISH ISH node is determining by matching the postcode to Serving SDH node where the footway box is sited. The SDH node is on the Advanced Capacity Forecast and the postcode is on the SDH node file. Exceptions: Where match of ISH is at a non SDH Serving Exchange, the nearest SDH node is used. SDH node ISH Link CP CSH Building BT Responsibility CP Responsibility Footway Box

business unit (if required) Partial Private Circuits Pricing – ISH Extn Network SDH node CP CSH Building ISH EXTN Link CP Responsibility BT Responsibility Footway Box

business unit (if required) Partial Private Circuits Pricing – ISH Extn ( Actual Network Routing) SDH node CP CSH Building ISH EXTN Link BT Responsibility Footway Box CP Responsibility SDH node Footway Box

business unit (if required) Partial Private Circuit pricing – ISH Extn Agreement with Industry required To use The CSH serving SDH node determination methodology or The ISH Serving SDH node determination methodology. In most cases, the Serving SDH nodes are the same. Difference in circuit pricing on ISH and CSH methodology Where the actual BT fibred Serving SDH node is different when compared with the determined SDH node from the postcode to MDF match or Where the footway box is not at the CP site for the PoH building and the postcode of the footway box has not been supplied.

business unit (if required) Partial Private Circuits Pricing - ISH Extn Impact Using the CSH methodology: Pros Footway boxes within the same postcode area will calculated from the same SDH node. Cons CPs must provide the correct postcodes for all footway boxes NOT within the CP’s site. BT will use the CP site for calculation of the circuit otherwise. All CP circuit orders must have the correct postcode of the footway boxes to be valid. Where footway box postcode is not available, grid reference will be used to determine the nearest Serving Exchange node

business unit (if required) Partial Private Circuits Pricing - ISH Extn Impact Using the ISH methodology: Pros All the postcode data reside within BT systems. CPs do not need to supply the footway box postcodes to BT. CPs do not need to supply the grid reference data to BT. Con Footway boxes within the same postcode area may be fibred from different Serving SDH node. Therefore comparing the Trunk and Term distances from different footway boxes although in the same area may not be valid.

business unit (if required) Published Data - Proposal Step 1 Update the Postcode to Exchange files by end by 31 st January Step 2 All changes to the postcode file will be updated quarterly and notified 1 month in advance of the effective date. Step 3 All files will be kept on Our networks website going forward. Old files to be archived. Step 4 Distance disputes will be calculated using the data relevant to the period in which the order was raised. Step5 All circuits distances will correlate to the distances calculated with input data at the time of order. i.e. where the distances are calculated by Grid Reference input, the distances will remain valid even when postcodes become available. Step 6 The ISH SDH node methodology is used for the ISH Extn determination

business unit (if required)