1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.

Slides:



Advertisements
Similar presentations
Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
Advertisements

Coles Point Wastewater Treatment Plant
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
City of Modesto FY Proposed Budget Utility Funds Utility Planning & Projects Public Works Finance.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
SOUTHEASTERN WISCONSIN WATER SUPPLY ISSUES AND REGIONAL WATER SUPPLY PLANNING PROGRAM OVERVIEW Presentation for Ozaukee County Board of Supervisors and.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION.
Prioritization of Drinking Water and Wastewater Projects Project Application – Region 6.
Saltwater Intrusion Monitoring in the Biscayne Aquifer near Florida City, Miami-Dade County, Florida: Chris Peters CH2M HILL Deerfield Beach,
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Savannah Water, the Lifeline of the Community.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Water System Planning Study
Rapid Assessment Process Project Strategic Plan Doña Ana MDWCA Water and Wastewater System Improvements Doña Ana County, NM Presented to: Stakeholders.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Safe Drinking Water Permit and Capacity Requirements Developer Services Summit November 16, 2010 Engineering - Asset Planning Vince Monaco.
Presentation prepared by: Toni Crosby Antoinette Aguirre Mike Belanger Beata O’Brien.
Santa Cruz AMA Virtual Tour Santa Cruz AMA Virtual Tour September 2000.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Preservation, Conservation and Restoration of North Carolina’s Water Resources CWMTF March 7, 2008.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Rapid Assessment Process Project Strategic Plan Village of Columbus Water Supply and System Improvements Luna County, New Mexico Presented to: Stakeholders.
Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas Water and Wastewater Facility Improvements in San Benito, Texas.
Department of Environmental Quality Water Infrastructure November 17, 2015 Water Infrastructure Funding to Financing.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Upcoming Rate Case February Department of Waterworks Owns and manages Indianapolis Water. Bi-partisan seven member Board of Directors oversees department.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Preserving The Upper San Pedro River Basin Presented to: The Upper San Pedro Partnership Executive Committee October 7, 2009.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Houston Area Water Corporation Northeast Water Purification Plant Houston Area Water Corporation Northeast Water Purification Plant October 13, 2000 CDM.
Our Water Systems
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Feasibility of Bass Lake Wastewater Treatment
Knoxville Utilities Board June 21, 2016
Redundancy and Emergency Interconnectivity (REI) Plan
Wastewater Management
PALM DESERT FEBRUARY 9, 2018 Dr. ALLAN BERNSTEIN TUSTIN CITY COUNCIL
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
Future Water Supply Evaluation
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
Antelope Valley-East Kern Water Agency
Presentation transcript:

1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005

2 PROJECT SPONSORS  Doña Ana MDWCA  Ft. Selden Water Company  Leasburg MDWCA  Jornada Water Company  Picacho MDWCA

3 PROJECT OVERVIEW  Wastewater Collection System from Radium Springs to the Las Cruces city limits (85 square miles/121 miles of collection lines)  2.0 MGD Wastewater Treatment Plant – Reclamation/Reuse  2.0 MGD Surface Water Treatment Plant –Supply Treated Surface Water to Domestic Water Providers

4 PROJECT OBJECTIVES  Groundwater Protection –Quantity (Groundwater, Surface Water) –Quality (Salinity, Septic Contamination)  Extend Water Service to Drought-Affected Residents  Conjunctive Water Management –Surface Water –Groundwater

5 PROJECT DEMOGRAPHICS  Total Population of Service Area: 18,300+  Total Households in Service Area: 6,000  Total Minority Population: 55%  Service Area Contains 8 Designated Colonias

6 TREATMENT PLANT SITE  Site 1 – Radium Springs  Site 2 – Radium Springs  Site 3 – South of Radium Springs  Site 4 – Near Community of Hill  Site 5 – Near Doña Ana County Transfer Station/East of I-25

7 EXISTING WATER SYSTEMS  Doña Ana MDWCA9,695  Fort Selden Water Co. 973  Jornada Water Company 260  Leasburg MDWCA 975  Leasburg State Park 40  Picacho MDWCA 977  + Approximately 1,200 individual wells serving remaining residents

8 EXISTING WASTEWATER SYSTEM  Wastewater Customers259  Design Capacity: Up to 550 Connections  Number of Septic Tanks/Cesspools6,000

9 FUTURE WATER SYSTEM  Water Connection Customers6,000  Population Served18,300+  Annual Average Water Use140 gpcd  Peak Demand5.2 MGD  Well Capacity3.5 MGD  Water Treatment Capacity2.0 MGD  Water Storage Capacity 5.0 MGD

10 FUTURE WASTEWATER SYSTEM  Wastewater Customers6,000  People Served18,300+  WW Treatment Plant Capacity2.0 MGD –2.0 MGD tertiary treated water available for reuse/reclamation

11 WATER TREATMENT ALTERNATIVES  Membrane Filtration  Conventional Water Treatment  ActiFloc System (Mixed Media Filtration) Estimated Construction Cost: $ $6.00/1,000 gallons

12 WATER DISTRIBUTION ALTERNATIVES  Water diversion from Leasburg Canal  Dedicated water transmission lines  Bulk water sales  New storage  Existing storage

13 WATER TREATMENT CHALLENGES  Diversion and pumping  Water storage and distribution  Sediment  Quality fluctuations  No year-round surface water supply

14 WASTEWATER COLLECTION ALTERNATIVES  On–site SystemsNot considered  Pressure Systems$0.75 million  Vacuum Sewer$ 25 million  Gravity Sewer$110 million

15 WASTEWATER TREATMENT ALTERNATIVES  Sequencing Batch Reactor  Conventional Activated Sludge Plant  Pre-Engineered Activated Sludge Plant  Membrane Bioreactor  STM-Aerotor Estimated Construction Cost: $ $6.00/1,000 gallons

16 ESTIMATED PROJECT COST  Wastewater Collection$25,000,000  Wastewater Treatment Plant$6,000,000  Surface Water Treatment Plant $6,500,000  Water Distribution Improvements $3,500,000 TOTAL COST$41,000,000 CURRENTLY FUNDED$ 4,266,500 FUNDING REQUIRED$38,233,500

17 CURRENT FUNDING SOURCES  State Appropriations$1,405,400  BECC$230,000  Federal Appropriations$1,289,000  CDBG Grants$256,000  NMFA Grants$425,000  NMED – RIP Loan$500,000  LRGWUO$28,000  Doña Ana MDWCA$78,889 Total Funds in Hand$4,266,500

18 FUNDING APPLICATIONS PHASE I CONSTRUCTION  Federal Appropriations (2005)$12,000,000  Water Trust Board $10,250,000  USDA-Rural Development$ 7,000,000  NMFA W/WW Grant Fund$10,000,000 Total Funding Applications$39,250,000

19 PROJECT SCHEDULE  Planning 2003/2005  Design 2005/2006  Construction –2007 Wastewater Collection System & Treatment Plant –2006 Surface Water Treatment Plant

20 CONCLUSION  Proactive Approach  Regional Effort for Conjunctive Water Resource Management  Groundwater Conservation/Protection  New Regulatory Precedent