Presentation is loading. Please wait.

Presentation is loading. Please wait.

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.

Similar presentations


Presentation on theme: "PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System."— Presentation transcript:

1 PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System

2 Project Summary $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system Funded by the City of Arlington and Gilliam County The City of Arlington has a shovel-ready industrial park area with full water and sewer system service

3 Reservoir Construction

4 Airport Booster Pump Station Piping

5 250,000-Gallon Steel Storage Reservoir and Booster Pump Station

6 Mesa Industrial Park Area


Download ppt "PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System."

Similar presentations


Ads by Google