Profiling Working Group October 16, 20031 PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.

Slides:



Advertisements
Similar presentations
Profiling Working Group May 15, PWG Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for WMS Meeting June 18, 2003.
Advertisements

Retail Market Subcommittee Update to TAC February 5, 2004.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Role of Account Management at ERCOT PRR 672 Collaborative Analysis Presentation to RMS November 8, 2006 DRAFT ONLY.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Profiling Working Group July 17, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting July 17, 2003.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
TX SET Update to RMS Wednesday, October 10, 2007.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
1 RMS TAC Update March 6, Texas Test Plan Chair; Bill Bell Centerpoint Energy Vice Chair; Leanne Hayden Centrica COMET Chair; Terry Bates TXU.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group June 12, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting June 12, 2003.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
1 RMS Update - ERCOT June 10, Supporting Reports Section.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
Demand Response Status Report Calvin Opheim October 9, 2007.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
PWG Profiling Working Group March 20, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 20, 2003.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Renewable Generation Profile Implementation Plan.
TX SET Update to RMS Wednesday, November 7, 2007.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
1 Profiling Working Group Update to COPS October 14, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
Profiling Working Group March 18, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 18, 2004.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group January 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 14, 2004.
1 PRR479 IDR Optional Removal Threshold (ERCOT Project PR40055)
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
PWG Demand Response Follow Up Jackie Ashbaugh October 23, 2007.
Profile Working Group & TX SET Conference Call Thursday, October 11, 2007.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Retail Market Update November 6, Flight Time Lines Retail market has several market occurring in the second quarter Flight 0304, GISB.
Commercial Operations Sub-Committee Update to RMS
PWG Update Report By Ernie Podraza for RMS Meeting June 12, 2003
Presentation transcript:

Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003

Profiling Working Group October 16, Next PWG Meetings 10/22, 11/5, 11/19 and 12/4. PRR Draft on IDR Optional Removal Threshold. Permissible effective dates in profile change requests. PRR471 for NIDR to IDR Default Profile. Default Profiles. PRR469 for Protocols Section 18 to PRS. Annual Profile Type and Weather Zone Validation. Protocols Section , Future IDRs Impact Analysis. Retail Point to Point Transaction PWG Example: Profile Ids New TOU Schedule Process. ERCOT Load Research – PR30014 Project Timeline. Oil and gas properties profile change request. Gas/Convenience 24 hr Stores profile change request. Direct Load Control (DLC) Project Status. IDR Requirement Report.

Profiling Working Group October 16, PRR Draft on IDR Optional Removal Threshold 1.RMS requested PWG review Sara Ferris’s IDR Removal draft PRR on 9/26/ PWG on 10/01 wrote a new draft. 3.PWG shall complete the threshold value amount on 10/22. 4.PWG shall submit final recommended PRR to RMS on 11/13. 5.Except: IDR Optional Removal Threshold: A CR may request the replacement of an IDR meter with a Non-IDR meter provided either of the following conditions is met; a. If the Premise’s 15-minute maximum demand interval for the most recent twelve (12) month period does not exceed ??? kW (or ??? kVa); or b. Within 90 days of a new customer’s move-in. If during the next 12 months following the move-in, the Premise peak demand is greater than or equal to the threshold defined in (a) above then the IDR meter shall be reinstalled and the CR may incur appropriate charges.

Profiling Working Group October 16, Permissible effective dates in profile change requests 1.RMS requested on 9/26/2003 PWG to review and report back to RMS on 11/13. 2.PWG Chair is working with RRI staff to define the issue to present to PWG.

Profiling Working Group October 16, PRR471 for NIDR to IDR Default Profile 1.RMS approved 9/26/ PRS issued to market 10/09/2003 requesting a vote on urgency, comments due 10/22. 3.PRS to review 10/23.

Profiling Working Group October 16, Default Profiles Three Types IDR, NIDR and NIDR moving to IDR 1.PWG reviewed 7/30/03. 2.Requested ERCOT staff examine PWG suggestions if a new module can be added to the settlement software to allow ways of scaling the default profiles when both the IDR data is missing and/or a NIDR premise changes to IDR. 3.PWG and ERCOT staff to further discuss at the 8/19 PWG meeting. NIDR to IDR 4.PRR471 gained consensus approved at 9/11/03 PWG meeting on NIDR to IDR scaling. IDR 5.PRR352 for IDR proxy day routine change for 8 weeks to 12 month is Completed. 6.NIDR 6.NIDR default profile settlement routine was discussed at the 9/30 PWG mtg. ERCOT to review possible options with the current software.

Profiling Working Group October 16, PRR469 for Protocols Section 18 to PRS. 1.On 9/15/03 the PWG submitted a draft PRR entitled, “Compliance for Competitive Metering and Rulings to Load Profiling” to update Protocols Section 18 per the PUCT Rulings on Project Load Research and Load Profiling and Project on Competitive Metering. 2.RMS Chair approved the PWG going directly to PRS to assist in the timeline for the PRR approval by year end before competitive metering becomes effective on 1/1/04. 3.PRS comments due 10/17. 4.PRS to review 10/23. 5.Additional PRR is drafted by PRS for PWG review to ensure where the use of REP, CR and LSE is appropriate.

Profiling Working Group October 16, Annual Profile Type and Weather Zone Validation. 1.CNP expressed to the PWG Chair concern for the manpower needed for annual validation of profile ID assignments and concern for residential migration based on winter ratio of 1.5. Chair shall propose that the PWG reexamine the annual validation and profile id assignment process. 2.RMS to add to week market call meeting per RMS meeting 9/26/03. 3.PWG has discussed feasibility of ERCOT coding the Profile ID instead of TDSPs.

Profiling Working Group October 16, Protocols Section , Future IDRs Impact Analysis. 1.Per 8/19/03 PWG meeting discussions began on compliance to Section Future Requirements for IDRs ERCOT and the appropriate ERCOT TAC subcommittee shall evaluate the impact of the IDR Requirement as defined in this Section for possible revision prior to the introduction of competitive metering services to the market on January 1, ERCOT staff is working on comparing current IDR premises below 1000 KW verses if the premise had been on a NIDR profile as the basis of the impact study. 4.At 10/22 PWG part of the impact report shall be presented comparing current IDRs below 1000 kW to if they had been NIDR.

Profiling Working Group October 16, Retail Point to Point PWG Example 1.Direct Market Participant Transactions (DMPT) suggested name from PRS instead of point to point. 2.Protocols Section 1.1 may need to give permission for Protocols to hold these DMPTs. 3.Protocols Section 9 deals with settlement disputes instead of other disputes. 4.New section of Protocols has been suggested for the DMPTs. 5.The PWG is discussing if FasTrak is the forum to dispute a profile id assignment, or direct filing to TDSPs with or without a standard format.

Profiling Working Group October 16, New TOU Schedule Process PWG reviewed a first draft of a document to assist in how a CR would go about requesting and getting approval of a new TOU Schedule.

Profiling Working Group October 16, ERCOT Load Research – PR30014 Project Timeline October 10/16/03 Present timeline to RMS 10/08/03 Administer TDSP survey November December-May /20/03 Install sample design software 10/23/03 Meeting #1 with TDSPs 10/27/03 Install SAS Server 11/10/03 Administer CR survey 11/06/03 Meeting #2 with TDSPs 11/17/03 TDSP format agreement 11/20/03 Implement Tracking System 11/20/03 Design and select TDSP samples 12/10/03 TDSPs order IDRs 01/01/04 Receive sample IDR data from TDSPs 02/02/04 Install Load Research Software 04/01/04 Sample IDR data posted for CRs 05/03/04 IDR Installation Complete

Profiling Working Group October 16, Oil and gas properties profile change request 1.Submitted to ERCOT 3/6/03 by Pioneer Natural Resources, Priority Power Management, and Energy Data Source. 2.ERCOT to post to WEB. 3.Argument is that the aggregate profile is a very high load factor profile, close to flat. 4.ERCOT is to evaluate and submit recommendation to PWG. 5.May test the new PUCT Rule for reimbursement. 6.ERCOT shall post the methodology request to the Market Information System (MIS) and respond to the request within sixty (60) days of the posted date of the request. This period does not include the time to analyze and render the complete assessment of the request. 7.“ERCOT withholds a decision on making a recommendation on whether to adopt or to deny adoption of the suggested profile change; instead ERCOT finds the request, as submitted, is incomplete and deficient. The requestors are invited to address the incompleteness and deficiencies listed below and re-submit the request for further review.” 8.Per 6/19 PWG meeting, a straw-man in development for changes to the profile change request process and to allow lagged dynamic samples. PRR drafts to be reviewed at the 9/30 and 10/1 PWG meetings. 9.ERCOT staff has submitted a load research sample design to the requestor for approval. 10.Work continues on the PRR and LPGRR for added validation of profile change requests and lagged dynamic samples.

Profiling Working Group October 16, Gas/Convenience 24 hr Stores Profile Change Request 1.Submitted to ERCOT by Coral Energy. 2.ERCOT staff is discussing a load research sample design with the requestor.

Profiling Working Group October 16, Direct Load Control (DLC) Project Status 1.PRR 385 Section 18 is complete with Board Approval 5/20/03. 2.LPGRR is attached to PRR385, approved by TAC 7/02, reviewed by Board, and the LPG is updated). 3.ERCOT Schedule is pending, Project Manager assigned. 4.ERCOT and some Market Participants question priority going forward. 5.Memo, on Project on Competitive Metering, May 8, 2003, by Commissioner Perlman suggests that wires companies need to develop a rate structure that provides strong incentives for demand responsiveness by charging different rates during high load periods. 6.PRR388 and PRR400 does not completely cover DLC issues. 7.PRR Section 6 Language for DLC is being written for a PRR.

Profiling Working Group October 16, IDR Requirement Report 1.07/03/03, ERCOT issues IDR_threshold_analysis_ xls. 2.July 30, 2003, ERCOT issues a Market Notification for IDR Requirement File on Portal. 3.PWG discussed on 7/30/03. Background: a)The report was issued in the spring of 2002 and manually sent to MP contacts. b)The report was again issued in the spring of 2003 and manually sent to MP contacts. c)The report was automated on monthly basis on 5/2, 6/2, and 7/2/03.

Profiling Working Group October 16, The PWGremainingTo RMS