MF Pad Considerations. Date: June 9, 2011 2 400 Hz Power Converter –The 400-Hz connectors installed on power pop-ups: The part number for the 400-Hz connector.

Slides:



Advertisements
Similar presentations
Telecommunication Rooms
Advertisements

 E4 Electrical Installation #1 Power Distribution.
Frankfurt (Germany), 6-9 June 2011  In France, LV customers are mostly < 18 kVA and single-phase.  Some LV networks are unbalanced and it generates important.
EMerge Browser Managed Security Platform Module 2 Hardware install.

Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EE4503 Electrical Systems Design
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Disaster Electrical Power An early draft Ray J. Vaughan, MS Last update 6/15/2015.
EET Survey of Electronics
Problem # 2-3/4 A core-type transformer rated at 37.5 kVA, 2400 – 480 V, and 60 Hz has a core whose mean length is 1.07 m and whose cross-sectional area.
Transformer Construction
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Transmitting Electricity
Electrical Power Systems
CCTV SYSTEMS CAMERA POWER SUPPLIES.
Dealer Certification Section 2: Building the Network Physical Planning & Documentation Power Sources & Distribution Voltage Drop Calculations Copyright.
UMKC Senior SUBSTATION DESIGN TEAM
Baluns and video amplifiers
Electrical Fundamentals
WHO WANTS TO BE A MILLIONAIRE?
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Communication Markets Division © 3M All Rights Reserved. Telecom Visit for Noise Mitigation Improve Network Performance with 3M™ Solutions.
1 Paging and distributed speaker systems BASIC TELECOMMUNICATIONS.
1. ALTERNATING CURRENT- THE CURRENT SWITCHES DIRECTION BACK AND FORTH. Used in generators, motors, and power distribution centers 2.Direct current- electricity.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Building Your LPFM Station Presented by John George.
Transmission Media The physical pathways that connect computers and devices on a network.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
“Transformers – Roberts in disguise”
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
2011 MF LRG New Orleans, LA Ground Testers: Two Types Fall-of- Potential “Stakeless” Clamp-on method.
ELECTRICAL DESIGN GUIDELINE STEPS Maria C. Gonzalez.
June 11, 2010NATIONAL POWER ELECTRONICS CONFERENCE1 A HARDWARE GRID SIMULATOR TO TEST GRID-CONNECTED INVERTER SYSTEMS ARUN KARUPPASWAMY B DR.VINOD JOHN.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Announcements For lectures 9 and 10 please be reading Chapter 3
Wind Energy. How does wind energy work? The wind blows on the blades and makes them turn. The blades turns a shaft inside the nacelle (the box at the.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
BACKBONE SUBSYSTEM. CABLING SYSTEM Backbone Subsystem The Backbone cabling subsystem is based on cabling segments, which link such connection centers.
Fall 2009 Module 8 Inverters. Converts the DC power produced by the solar modules into AC power used on the utility grid.
Power Supply The basic function of power supply is to convert the AC supplies available at wall socket, that which is unusable by the computer. The SMPS.
Lifeguard ® PO2 Sensors ‘Tee’ Tutorial © 2015 Cochran Consulting, Inc. Introduction PO2 Sensor Factors PO2 Sensor Tee Installation Cochran Consulting,
Lecture 09Electro Mechanical System1 Chapter 11 Special Transformers.
Electrical and RF Safety. Electrical Safety Generators Generators convert mechanical energy to electrical energy. They actually consist of two devices:
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Single Phase and three Phase Distribution Substation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Using a Multimeter.
A+ Guide to Managing and Maintaining your PC, 7e
Electricity is produced at the power station.
Trigger or Starting Point
Distribution substations
ELECTRONICS & COMMUNICATION 3-SEM SHANTILAL DHOLIYA ( )
Transformers.
The Automatic Weather Station (AWS)
UPS Connectivity Options: PPDM ( )
DC to DC power converters: Types and performance index!
Grounding for Amateur Radio
Trigger or Starting Point
Transformers A transformer changes the high voltage from the main power lines to the 120 volts your appliances use.
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Dual-Wire Dual-Operator Programmable Continuous Monitor
Ahmed Kulab Moh. Abed Foaad Al-Habeel
Protecting Your Shack From Lightning (as best you can)
On the Korean Contributions for
Electrical Energy Generation and Transmission
Presentation transcript:

MF Pad Considerations

Date: June 9, Hz Power Converter –The 400-Hz connectors installed on power pop-ups: The part number for the 400-Hz connector receptacle that mates with our 400-Hz cables is part number MS90555-C SZ. Contractors installed 60-Hz connectors, wouldn’t mate with 400-Hz connectors –400-Hz power source used is a 60-kVA converter. The 60- kVA output is the same output as a single MMG-1A unit. Building housing the 400-Hz converter at south end of the entire pad. The distribution distance to opposite end could produce voltage drops that may affect test equipment. Recommend 400-Hz power source in future construction be located in the center of pad or more than one 400-Hz power converter, one at each end of the MF Pad

Date: June 9, Grounding Interconnected ground system with ground rods under each grounding cup. Grounding points every ten feet..6 Ohms to ground The grounds for the transformers, pop-ups, and grid rods are interconnected. Good because all grounds must be tied together. Even the fence is a ground that must be tied to pad ground

Date: June 9, Grounding

Date: June 9, Power/Voltage Output Initial voltage output, both 60-Hz & 400-Hz, were high enough to cause warning alarms on RTCASS stations at night. Had to have Facilities turn voltage outputs down