Hawaii Energy Storage Seminar: Utility Regulation Service

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
Emissions Due to Plug-in Hybrid Electric Vehicle Charging in High Wind Systems Allison Weis Roger Leuken Jeremy Michalek Paulina Jaramillo Carnegie Mellon.
©2010 A123 Systems, Inc. All rights reserved. CSG-ERC 17 August Vehicle-to-Grid: Perspective from a Battery Manufacturer Andy Chu, Ph.D. VP, Marketing.
Experience you can trust. 1 Solutions for large-scale wind power integration in the European system EWEC2009 Energy and power management Frits VerheijMarch.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
EE535: Renewable Energy: Systems, Technology & Economics Energy Storage.
Gas Turbine Developments Needed to Aid Wind Power Integration Dr. Warren Katzenstein October 21, 2010.
Smart Storage Space and Water Heaters Resources for Grid Management, Renewable Integration, and Conservation Paul Steffes Steffes Corporation
Wind Turbines and Water Heaters Load Control For Providing Power System Balancing Services Ken Dragoon Renewable Northwest Project PNDRP July 2010.
Recent Advances in Energy Storage Honolulu, Hawaii May 10-12, 2004 Garth P. Corey Sandia National Laboratories Sandia is a multiprogram laboratory operated.
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
STORAGE OVERVIEW 2010 Steve Isser, JD, PhD Vice President & General Counsel Good Company Associates.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Moving Toward Hybrid Power Systems Creating value with utility scale energy storage ERCOT Renewable Technology Working Group April 2009.
Vehicle-to-grid Power Amardeep Dhanju & Dr. Willett Kempton April 14, 2009 Center for Carbon-free Power Integration University of Delaware Amardeep Dhanju.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Presented to: California Energy Commission Efficiency Committee Workshop Load Management Standards Scoping Presented by: Mike Heinrich EPRI Member Technical.
Advanced Energy Storage for Load Management 2008 Rulemaking on Load Management Standards Efficiency Committee Workshop March 3, 2008 Charles R. Toca US&R.
Barriers to Energy Storage providing Ancillary Services in ERCOT
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
June 16, 2009 Michael W. Howard, Ph.D. Sr. Vice President, R&D Group Renewable Resources and Operational Challenges.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
THE ALEVO ECOSYSTEM ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY ANALYTICS ECOSYSTEM ANALYTICS ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY FREQUENCY REGULATION.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
November 20, 2015 Challenges of Storage Development - Advanced Rail Energy Storage (ARES) Prepared for Bulk Storage Conference, Sacramento November 20,
PJM©2011 From Pilot to Production: Integrating New Storage Products in PJM Scott Baker PJM Interconnection ERCOT ETWG Storage Workshop December 2, 2011.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Changes in U.S. Regulatory Framework that Supports Energy Storage Deployment Jim Hart Vice President – South America.
Davion Hill, DNV GL Elizabeth Endler, Shell
Wind Management at MISO
Asia-Pacific Energy Regulatory Forum
Grid Integration of Intermittent Resources
CHILE CALIFORNIA COUNCIL
MIT tour of the California ISO Control Center March 31, 2015
31st USAEE/IAEE North American Conference
Hawaii Energy Storage Seminar: Other Energy Storage Technologies
New England Electricity Restructuring Roundtable
Energy Storage: A New Hope
Sandip Sharma ERCOT Manager, Operations Planning
Forecasting and Operations CAISO Case
Solar Energy Commercialization
Energy Storage System Drivers and Use Cases for Energy Storage Systems
Transforming the Electric Grid with Storage
Presentation transcript:

Hawaii Energy Storage Seminar: Utility Regulation Service John D. Boyes Sandia National Laboratories Energy Storage and Distributed Resources jdboyes@sandia.gov 505-845-7090 www.sandia.gov/ess June 16, 2010 Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL85000. SAND2009-2801P

Energy Storage for Non-Peak Shaving Applications Energy Storage Systems with short duration discharges (~15 min max) Applications Frequency regulation Power quality (UPS) Renewable integration and ramping Technologies Batteries Flywheels Supercapacitors

How Regulation Works Regulation – balancing utility generation with demand Up regulation – when demand exceeds generation (discharge) Down regulation – when demand is below generation (charge) ISO regulation signal every 4 seconds Conventional generators must respond within 5 minutes Storage systems can respond within seconds Current business models require a market mechanism Discharge Charge Courtesy: Beacon Power

Example of Regulation Demand from AES Frequency Regulation is a near zero-energy service compensating for the minute to minute fluctuations in total system load and uncontrolled generation. Thus it is an ideal candidate to be supplied by storage.

Storage Significantly Reduces CO2 emissions 80% Reduction From KEMA study: 20MW of Regulation over a 20-year operating life Courtesy: Beacon Power

Market Changes Are Necessary for Energy Storage to Provide Regulation Service Business model for Beacon and AES Own and operate the storage system Sell regulation service into an open, day ahead market FERC and ISO’s have developed ancillary market rules for storage Regulation Service is the first example Energy storage is a separate asset class Dispatch fast performers first ISO manage storage state of charge (SOC) Adjust set point every 5 minutes 15 minute storage duration provides 100% coverage

Wind Ramp Rate Control = ~ +180 MW/ 30 min For 60 minute ramp requires absorbing 45MWh into storage = ~ -120 MW/ 2 ½ hrs For 5 hour ramp requires discharging 150MWh from storage A 20 MW, 15 minute Beacon Flywheel system contains 5 MWH PNM Data from a 200 MW wind system Red line is wind system output Blue line is the Area Control Error (ref only) Black line is eyeball linear ramp rate Green line is eyeball doubling of ramp duration

1st 20 MW Flywheel Regulation Plant NYISO – Stephentown, NY May 2008 FERC approved market rules July 2009 DOE Loan Guarantee October 2009 NY PSC approved project November 2009 Ground breaking 4Q 2010 4 MW capacity 1Q 2011 20 MW capacity

2nd 20 MW Flywheel Regulation Plant PJM Interconnection Awarded $24M DOE stimulus grant Established site control at two potential sites in PJM area Interconnection agreements under negotiation

Operational 2 MW Advanced Lithium-ion regulation system at an AES Substation

Spinning Reserve Capacity 12 MW Los Andres, Chile Largest Lithium-ion battery system in service on the power grid

Energy Storage Systems Serve High Power/High Cycle Applications Regulation Service is a reality Regulatory changes were required Renewable integration is becoming a reality As penetration levels increase, storage will become a viable option Renewable ramping requires large systems