Boot Camp - Conformity July 19, 2010 Detroit, USA.

Slides:



Advertisements
Similar presentations
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
Advertisements

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Security Conformity March 10, 2011 SF Bay Area. Agenda for Thursday, March 10th Discuss Security Testing & Certification Authority Review Security Testing.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
© 2011 EnerNex. All Rights Reserved. UCAIug OSG Conformity Meeting.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
SG Communications Sessions Tuesday, October 20th, 2009.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
OpenSG and Conformity Bruce Muschlitz EnerNex Corporation Knoxville October 2009.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
OpenSG Closing Plenary Oct 22 nd, Agenda SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
Draft Edge Conformity TG DraftSlide 1 Submission Title: OpenSG San Francisco Abstract Test Cases Date Submitted: February 3, 2010 Source: Edge Conformity.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Overview TIA TR-50 – Smart Device Communications Orlett W. Pearson March 2010.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Today’s Agenda Agree on recurring meeting secretary
Doc.: IEEE /0716r0 Submission July 2009 Kapil SoodSlide 1 Smart Grid and Date: Authors:
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
Energy Market Information Exchange OASIS Energy Market Information Exchange Technical Committee Work Plan Issues and Direction William Cox
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
6 January 2016Conformity Boot Camp1 Boot Camp Edge / Enterprise Conformity.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: January 28, 2010 Source: Edge Conformity Task.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG McLean Opening Report Date Submitted: May 2, 2010 Source: Edge Conformity Task Group Re:
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
ISA99 - Industrial Automation and Controls Systems Security
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Testing Technical Committee Paris, France August 24, 2010
Margaret Goodrich June 18, 2010
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
IEC TC57 Smart Grid Activities
Boot Camp - Conformity March 7, 2011 SF Bay Area.
doc.: IEEE <doc#>
“OpenADR” “Boot Camp” Overview
SG Communications Boot Camp
SG Communications Sessions
Presentation transcript:

Boot Camp - Conformity July 19, 2010 Detroit, USA

Bruce Muschlitz, EnerNexSlide 2 Boot Camp - Conformity Overview – What does this Working Group do? – Previous meetings – Knoxville, San Fran, DC – Guiding principles – Terms we use – NIST Activities – Our Activities – Re-organization

Bruce Muschlitz, EnerNexSlide 3 Boot Camp – Conformity Goals of the working group Coordinate Task Forces – Edge Conformity – Enterprise Conformity – Security Conformity Provide overall guidance Propose/Review task force deliverables

Bruce Muschlitz, EnerNexSlide 4 Boot Camp – Conformity Previous Meeting (Knoxville) Organized Group Introduced as one models Stressed conformance != interoperabilty Explained abstract vs. detailed tests Introduced “virtual” test environments

Bruce Muschlitz, EnerNexSlide 5 Boot Camp – Conformity Previous Meeting (San Francisco) Continued Group Organization Discussed “plug-fest” – won’t do this Discussed how other do this: – ISO Guide 65 – IEC and – Discussed Product Mark (logo) Recognized: Testing, SGIP TCC

Bruce Muschlitz, EnerNexSlide 6 Boot Camp – Conformity Previous Meeting (McLean) Organized Security Conformity Re-organized by Horizontal teams Discussed interaction with SGIP TCC Recognized Edge/ENT might work better as (Physical) Device/ (Middleware) Interface

Bruce Muschlitz, EnerNexSlide 7 Boot Camp – Conformity Guiding Principles Detailed Tests are not defined by UCAIug Testers shall adhere to the defined tests Equivalence of testers (no easy testers) Tester shall produce “full” test results Testers are free to script the tests

Bruce Muschlitz, EnerNexSlide 8 Boot Camp – Conformity Common Terms Conformance – meets spec? Interop – plays well with others? Positive tests – does it work right? Negative tests – recovers gracefully? Black Box tests – no inside knowledge White Box tests – view algorithms

Slide 9 Boot Camp – Conformity NIST Priority Action Plans Phil Beecher, PG&E

Bruce Muschlitz, EnerNexSlide 10 Boot Camp – Conformity NIST SGIP Standing Committees Smart Grid Architecture Committee Smart Grid Testing and Certification Committee – TCC committee will learn on our work – TCC will share some duties with out work

Conformity Activities Common Glossary Product Mark presentation Templates – test cases, use cases TISSUEs (Technical Issues) “Conformity Requirements Document”

Re-Organization Original organization based upon physical location of devices (distance from enterprise) New organization based upon interface functionality (real or virtual) – Real – wired or wireless protocols – Virtual - APIs

Bruce Muschlitz, EnerNexSlide 13 Boot Camp – Conformity Background Material conformity sggrid/bin/view/SmartGrid/WebHome

Slide 14 Boot Camp – Conformity Questions? Phil Beecher, PG&E

Boot Camp Edge / Enterprise Conformity

Edge / Enterprise Conformity Activity Certification Process Reference Manual Define Abstract Test Cases

What is the CPRM? Overview of device and system requirements Identifies best practice for device and system protocol design Defines the process used to define and maintain the quality of a Certification Program

Guiding Principles Open standards based Clean, layered architecture Robust certification program Focussed on application programming interface, not specific applications Layered conformance testing Performance testing considerations Economically viable

Organisational Requirements Identify organisational structure to support a robust certification and interoperability testing program – Program management – Test laboratory qualification – Logo management – Change control – Dispute resolution – Devices and systems

Program Overview

Context (systems)

Context (products)

OpenSG SG Conformity – Security Conformity July 19, 2010 Bobby Brown

Security Conformity Task Force

Security Conformity TF Charter Establish security conformance requirements for laboratories desiring to certify smart grid components and systems Establish clear scoping boundaries, perform research to identify existing models, and propose a high-level philosophy of approach Chair: Bobby Brown, EnerNex representing Consumers Energy, Vice-Chair: needed

Work Plan Reporting & Communication High-level Conformity Requirements Testing Use Cases

Goals Provide testing laboratories with best practice for cyber security testing. Provide environmental and technical considerations for entities developing internal cyber security testing processes Develop cyber security tools list and resources for security testing. Develop test cases Support funded efforts conducting actual testing to vet and assist in the development of the testing method, and cyber security metrics. Develop guidance for suppliers outsourcing cyber security testing – technical, procedural, communication, reporting, and status.

Conformance Definitions a)“Is any activity to determine, directly or indirectly, that a process, product, or service meets relevant standards and fulfills relevant requirements.” ISO/IEC Guide 2:2004 b)Conforms if… “has not been proven to be non- conformant with standard x”

Meeting Logistics Every Friday at 2:00PM Eastern Time (changing to every other week) Contact for dial-in information and to be added to

Detroit Face-to-Face Agenda 8-10 AM Thurs July 22 nd in Founders B-3 Review Charter & Work Plan Old Business AMI Use Cases Identify Standards (AMI)

Thank you! Bobby Brown, EnerNex

Slide 32 Edge Conformity Task Group Scope: – Conformance requirements – Testing requirements – Interoperability requirements for Home Area Network, Automated Data Exchange and Automated Demand/Response (HAN, ADE, ADR) Defining policy and requirements, NOT developing tests. Phil Beecher, PG&E

Slide 33 Edge Conformity Task Group Status: – Draft Scope/Charter document prepared - needs to be agreed – Guiding Principles document to be finalised – Certification Policy Reference Manual underway – Starting work on Abstract Test Cases Coordination: – with OpenADE, OpenADR and OpenHAN – with external groups and organisations, e.g. NIST, Zigbee Alliance, Homeplug Alliance

Bruce Muschlitz, EnerNexSlide 34 Boot Camp – Edge Conformity Questions?