Presentation is loading. Please wait.

Presentation is loading. Please wait.

Boot Camp - Conformity March 7, 2011 SF Bay Area.

Similar presentations


Presentation on theme: "Boot Camp - Conformity March 7, 2011 SF Bay Area."— Presentation transcript:

1 Boot Camp - Conformity March 7, 2011 SF Bay Area

2 Boot Camp - Conformity Overview Org Chart
<month year> doc.: IEEE <doc#> Boot Camp - Conformity Overview Org Chart What does this Working Group do? Previous meetings – Knoxville, San Francisco, DC, Detroit, Fort Lauderdale Terms we use NIST Activities Our Activities Slide 2 Bruce Muschlitz, EnerNex Page 2 <author>, <company>

3 UCAIug Org Chart (simplified)
Technical Oversight Committee IEC61850 Testing CIM OSG Security Comms Conformity Edge Enterprise System SGIP TCC

4 Boot Camp – Conformity Goals and Activities of the working group
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Goals and Activities of the working group Coordinate and create Conformity Task Forces based on needs. Edge Conformity Enterprise Conformity Security Conformity Provide overall guidance Propose/Review task force deliverables Slide 4 Bruce Muschlitz, EnerNex Page 4 <author>, <company>

5 Boot Camp – Conformity Previous Meeting (Knoxville)
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Previous Meeting (Knoxville) Organized Group Introduced as one models Stressed conformance != interoperabilty Explained abstract vs. detailed tests Introduced “virtual” test environments Slide 5 Bruce Muschlitz, EnerNex Page 5 <author>, <company>

6 Boot Camp – Conformity Previous Meeting (San Francisco)
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Previous Meeting (San Francisco) Continued Group Organization Discussed “plug-fest” – won’t do this Discussed how others do this: ISO Guide 65 IEC and 17025 (superseded by ANSI-ASQ Accreditation Board Discussed Product Mark (logo) Recognized: Testing, SGIP TCC Slide 6 Bruce Muschlitz, EnerNex Page 6 <author>, <company>

7 Boot Camp – Conformity Previous Meeting (McLean)
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Previous Meeting (McLean) Organized Security Conformity Re-organized by Horizontal teams Discussed interaction with SGIP TCC Recognized Edge/ENT might work better as (Physical) Device/ (Middleware) Interface Slide 7 Bruce Muschlitz, EnerNex Page 7 <author>, <company>

8 Boot Camp – Conformity Previous Meeting (Detroit)
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Previous Meeting (Detroit) NIST TCC IPRM and CPRM coordination Abstract Test Case (ATC) template defined Slide 8 Bruce Muschlitz, EnerNex Page 8 <author>, <company>

9 Boot Camp – Conformity Previous Meeting (Ft.Lauderdale)
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Previous Meeting (Ft.Lauderdale) Worked with SGIP SGTCC to complete IPRM (IPRM=Interoperability Process Reference Manual) Agreed to align CPRM with NIST SGIP TCC IPRM Collaborating with EPRI to establish requirements-based testing activity Agreed Security Conformity Group to work collaboratively with SGIP CSWG Slide 9 Bruce Muschlitz, EnerNex Page 9 <author>, <company>

10 Boot Camp – Conformity Common Terms
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Common Terms Conformance – meets spec? Interop – plays well with others? Positive tests – does it work right? Negative tests – recovers gracefully? Black Box tests – no inside knowledge White Box tests – view algorithms Slide 10 Bruce Muschlitz, EnerNex Page 10 <author>, <company>

11 Boot Camp – Conformity NIST SGIP Collaboration
<month year> doc.: IEEE <doc#> Boot Camp – Conformity NIST SGIP Collaboration SGIP Test and Certification Committee Interoperability Process Reference Manual Published Q4 2010 Promotion during 2011 through WG8 End to End Testing group Work closely with Edge and Enterprise Conformity groups Slide 11 Phil Beecher, PG&E Page 11 <author>, <company>

12 Boot Camp – Conformity Background Material
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Background Material Slide 12 Bruce Muschlitz, EnerNex Page 12 <author>, <company>

13 Boot Camp – Conformity Questions?
<month year> doc.: IEEE <doc#> Boot Camp – Conformity Questions? Slide 13 Phil Beecher, PG&E Page 13 <author>, <company>

14 Edge / Enterprise Conformity
Boot Camp

15 Edge / Enterprise Conformity Activity
Certification Process Reference Manual Test Methodology and Abstract Test Cases 29 December 2018 Conformity Boot Camp 15 15

16 What is the CPRM? Overview of device and system requirements
Identifies best practice for product (device and system) protocol design Describes testing of specific technologies identified by OpenSG membership Describes the process used to define and maintain the quality of a Certification Program Companion document to SGTCC IPRM 29 December 2018 Conformity Boot Camp 16 16

17 CPRM Guiding Principles
Open standards based Clean, layered architecture Robust certification program Focussed on application programming interface, not specific applications Layered conformance testing Performance testing considerations Economically viable 29 December 2018 Conformity Boot Camp 17 17

18 CPRM Organisational Requirements
Identifies organisational structure to support a robust certification and interoperability testing program for products Addresses “devices” (incorporating hardware) and “system applications” (software only) Considerations: Program management Test laboratory qualification Logo management Change control Dispute resolution 29 December 2018 Conformity Boot Camp 18 18

19 Program Overview 29 December 2018 Conformity Boot Camp 19 19
Interoperability Test and Certification Authority P R O G A M Certification Program Manager Device / Product Certification Body Lead Laboratory Testing Organizations E Q S / L I C Y SSO / SDO Periodic Normalization Industry Implementers 29 December 2018 Conformity Boot Camp 19 19

20 SG System Components 29 December 2018 Conformity Boot Camp 20 20

21 Context of Individual Test Suites
29 December 2018 Conformity Boot Camp 21 21

22 Abstract Test Documents
Contents / methods based on X291 OSI Conformance Testing Methodology and Framework for Protocol Recommendations for ITU-T Applications – Abstract Test Suite Specification Each document summarises requirements for: Test Methodology or Methodologies PICS proformas Test suites Abstract Test Cases Other information? 29 December 2018 Conformity Boot Camp 22 22

23 General Model for Multi-Party Testing
Lower Tester Control Function TCP LT3 UT3 LT2 TCP UT2 LT1 TCP UT1 PCO PCO PCO Y-ASPs IUT (P) PDUs PCO (P) PDUs PCO PCO (P) PDUs X-ASPs X-Service-Provider 7 September 2010 Abstract Test Cases

24 Current Status CPRM Test Case Documents Completed recirculation ballot
Available as companion document to SGTCC IPRM describing organisational and testing requirements to help achieve interoperable products Test Case Documents Enterprise Conformity project underway OpenHAN – working on test methodologies, test harness functionality Need to start OpenADE and OpenADR 29 December 2018 Conformity Boot Camp 24 24

25 EPRI (CIM) Test Methodology to OpenSG Systems
Test Methodology designed to compatible with: IEC CIM 61968 SGSystems (AMI-Ent, OpenHAN, OpenADR, OpenADE, etc.) Test process defined, documented and repeatable Interop test using Virtual Lab Environment 29 December 2018 Conformity Boot Camp 26 26

26 Agenda for Thursday, March 10th
Overview Security Conformance & Charter Overview TCC and CSWG Testing & Certification Subgroup Review Security Testing Methodology

27 Review Security Conformity TF Charter
Establish security conformance requirements for laboratories desiring to certify smart grid components and systems and; Establish clear scoping boundaries, perform research to identify existing models, and propose a high-level philosophy of approach. Chair: Bobby Brown, EnerNex Vice-chair: needed (Sandy Bacik)

28 Review CSWG Testing & Certification
Is NISTIR 7628 Testable / Actionable? Is AMI Security Profile 2.0 Testable / Actionable? SGIP TCC Coordination Tasks Miscellaneous Tasks

29 Testing & Metrics GAO Report – “no metrics for evaluating cyber security” Open Source Security Testing Methodology Manual (OSSTMM) by Institute for Security and Open Methodologies

30 OSSTMM Purpose Test conducted thoroughly
Test included all necessary channels Posture for test complied with laws and regulations Results are measurable Results are consistent and repeatable Results contain only facts derived from tests themselves?

31 Security Test Audit Report
Serves as proof of a factual test Holds Analyst responsible for test Provides clear result to client Provides comprehensive overview Provides understandable metrics

32 Outward Support CSWG Testing & Certification Sub-group
SG Security CyberSec-Interop


Download ppt "Boot Camp - Conformity March 7, 2011 SF Bay Area."

Similar presentations


Ads by Google