Presentation is loading. Please wait.

Presentation is loading. Please wait.

Testing Technical Committee Paris, France August 24, 2010

Similar presentations


Presentation on theme: "Testing Technical Committee Paris, France August 24, 2010"— Presentation transcript:

1 Testing Technical Committee Paris, France August 24, 2010
Bruce Muschlitz Committee co-chair August 24, 2010 UCA IUG Testing Subcommittee Report

2 Summary Meeting Agenda
Maintain certified product list Maintain certified tester list Maintain test procedures Assist users and vendors in application of test procedures Interpret test procedures August 24, 2010 UCA IUG Testing Subcommittee Report

3 Testing Subcommittee/ Working Group Membership
Open to all UCAI User Group Members Have academic, utility, vendor, testers Each member has equal voice Please consider joining one of the Working Groups August 24, 2010 UCA IUG Testing Subcommittee Report

4 UCA IUG Testing Subcommittee Report
2009/2010 Meeting summary Met 1 time face-to-face (Pittsburgh PSRC) Met 14 times by teleconference Next meeting 24-August-2010 Room 242B August 24, 2010 UCA IUG Testing Subcommittee Report

5 UCA IUG Testing Subcommittee Report
Work Items Client Test procedure revised Test procedures change list (server errata) Server PIXIT template Merging Unit test procedures Tester accreditation procedure “developer’s version” of SCL schema GOOSE Performance Test August 24, 2010 UCA IUG Testing Subcommittee Report

6 2009-2010 Work Items (continued)
9-2 LE publisher test Review of FDIS – error codes Begin Testing Help desk Coordination with Open Smart Grid Coordination with NIST SGIP TCC August 24, 2010 UCA IUG Testing Subcommittee Report

7 UCA IUG Testing Subcommittee Report
Ongoing Work Hosting SCL plausibility checker Product Mark Edition preparation 9-2 LE Subscriber tests Interoperability testing Document cleaning (commercial marks) Revision to 9-2 LE (Merging Unit Spec) Ed2, PTP(1588), smpSync, 1 PPS-output August 24, 2010 UCA IUG Testing Subcommittee Report

8 Other Testing Activities
USA NIST Smart Grid Interop Panel Testing and Certification Committee UCAIug Open Smart Grid Conformity Working Group Edge Conformity Enterprise Conformity Security Conformity August 24, 2010 UCA IUG Testing Subcommittee Report

9 UCA IUG Testing Subcommittee Report
Future Work New IED types Gateways Ethernet Switch Software tool (SCL) testing Consider Interoperability testing Revise tests for Edition 2 Integrate CIM and OpenSG testing Integrate NIST SGIP TCC testing? August 24, 2010 UCA IUG Testing Subcommittee Report

10 UCA IUG Testing Subcommittee Report
Questions ? August 24, 2010 UCA IUG Testing Subcommittee Report


Download ppt "Testing Technical Committee Paris, France August 24, 2010"

Similar presentations


Ads by Google