Mid-Columbia Coordinated Hydro Operations Model John C. Howard CddHoward Consulting Ltd. CEATI 2009.

Slides:



Advertisements
Similar presentations
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Advertisements

NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Software Analysis Tools
E: Track II Project level analyses Robert Lempert, RAND 1.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Watershed and River Management Program (WaRSMP) Description of Yakima River Basin and Yakima Storage Project MMS and Yakima River Basin models Global Climate-Change.
Seasonal Volume Forecasts Using Ensemble Streamflow Prediction for the 2006 Water Year Steve King, Hydrologist Northwest River Forecast Center.
Dennis P. Lettenmaier Alan F. Hamlet JISAO Climate Impacts Group and the Department of Civil and Environmental Engineering University of Washington July,
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
St. Johns River Water Supply Impact Study by Getachew Belaineh Ph. D., P.H. 1 Brian McGurk P.G. 1 Louis Motz Ph. D., P.E 2 Follow up Review meeting March,
Climate Change and Water Resources Management WEB pages on water management activities Max Campos San Jose – Costa Rica.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Federal Columbia River Power System Operations Planning.
Reclamation Mid-Term Operational Modeling Seasonal to Year-Two Colorado River Streamflow Prediction Workshop CBRFC March 21-22, 2011 Katrina Grantz, PhD.
EGEE 102 – Energy Conservation And Environmental Protection Renewable fuels.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
U.S. Army Corps of Engineers TMT Annual Review Weather and Water Summary Presented by Karl Kanbergs USACE, Water Management Division December 7, 2011.
Cascadia Subduction Zone Earthquakes and Critical Infrastructure Workshop Edward Perez, FERC Background - Part 12D Report. - Every 5 years. - Top-to-bottom.
Virtual Weir Phase 5 Investigations (Preliminary Results) Canberra 29 September, 2009.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers, 2009 Technical Management TeamDecember 11, 2009 Lessons Learned 2009 Bill.
Potential effects of climate change on the Columbia River Basin: Hydrology and water resources Dennis P. Lettenmaier Department of Civil and Environmental.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Hydro Power 102. Hydroelectric Models in the Northwest.
Columbia River Basin Dams FCRPS--29 federal dams (USACE and BOR) Hydropower (50-65% of the region’s needs) Flood control Irrigation Recreation Navigation.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
A Dynamic Interval Goal Programming Approach to the Regulation of a Lake-River System Raimo P. Hämäläinen Juha Mäntysaari S ystems Analysis Laboratory.
1 Archiving Requirements – Current Requirements A. Juliann Meyer Sr. Hydrologist – Data Systems Missouri Basin River Forecast Center and RAXUM Team Leader.
ST HydroExpert 1 Version 1.1 © HydroByte Software HydroExpert Decision Support System HydroSim XP Simulation Model Startup Tutorial Version 1.3 –
James VanShaar Riverside Technology, inc
Modeling Development CRFS—Technical Meeting November 14, 2012.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Downstream Survival of Juvenile Stream Type Chinook Salmon and Steelhead Through the Snake/Columbia River Hydropower System and Adult Return Rates AFEP.
Resource allocation and optimisation model RAOM October 2003.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
EU Strategies for the Danube River 1 An Integrative Research Project on the Future of Water in the Upper Danube Basin Wolfram Mauser Department.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
1 Seema Thakur (st107641) Advisor: Dr. Weerakorn Ongsakul Optimal Generation Scheduling of Cascaded Hydro-thermal and Wind Power Generation By Particle.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
Water Resources Planning and Management
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Where the Rivers Meet: Salvelinus confluentus Migrations in the Upper Mid-Columbia River Mark Nelson USFWS Mid-Columbia River FRO WA/BC AFS AGM March 29,
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
WATER RESOURCES DEPARTMENT
Presented by Jon Traum, P.E.
Northwest Fisheries Science Center Technical Management Team
GENESYS Redevelopment Strawman Proposal
Northwest Fisheries Science Center Technical Management Team
Vetting the GENESYS Model
Direct Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers: Update with 2007 Results Northwest Power and Conservation Council.
Two-Dam Independence Project Update
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

Mid-Columbia Coordinated Hydro Operations Model John C. Howard CddHoward Consulting Ltd. CEATI 2009

CddHoward Consulting Ltd. Slide 2 Plan for this talk System of seven dams Objective and constraints for optimization Results for three study scenarios Excel optimization environment issues

CddHoward Consulting Ltd. Slide 3 Purpose and Scope of this Study Purpose Identify opportunities for revised coordination of river system operations Scope Cascade of seven hydro projects Study Historical Scenarios with a range of Hydrologic and System-Load Conditions Uses an iterative QLP optimization

CddHoward Consulting Ltd. Slide 4 Columbia River Basin Mid-Columbia Canada USA

CddHoward Consulting Ltd. Slide 5 Mid-Columbia System Grand Coulee Chief Joseph Wells Rocky Reach Rock Island Wanapum Priest Rapids TOTAL FT MW KW/CFS 334 7, , , ,

CddHoward Consulting Ltd. Slide 6 Grand Coulee 334 ft 7,049 MW 24.8 kW/CFS

CddHoward Consulting Ltd. Slide 7 Chief Joe 176 ft 2,069 MW 13.1 kW/CFS

CddHoward Consulting Ltd. Slide 8 Wells 74 ft 890 MW 5.4 kW/CFS

CddHoward Consulting Ltd. Slide 9 Rocky Reach 94 ft 1,320 MW 7.1 kW/CFS

CddHoward Consulting Ltd. Slide 10 Rock Island 43 ft 622 MW 3.3 kW/CFS

CddHoward Consulting Ltd. Slide 11 Wanapum 83 ft 831 MW 6.0 kW/CFS

CddHoward Consulting Ltd. Slide 12 Priest Rapids 60 ft 788 MW 4.5 kW/CFS

CddHoward Consulting Ltd. Slide 13 Hourly Optimization Maximize Energy-In-Storage at Last-Hour Meet Historical Hourly Load (± 5MW) Realistic Plant Operations, Wave Routing, Local Sideflows, Encroachments and Seasonal Discharge Constraints (Fish)

CddHoward Consulting Ltd. Slide 14 Plant Envelope Model

CddHoward Consulting Ltd. Slide 15 WEL: 890MW 35 Miles Transient Wave Routing

CddHoward Consulting Ltd. Slide 16 Ungauged or Poorly Estimated Varies by 1% to 10% of Inflow(t) Preprocessed to balance mass Irrigation Returnflows & Sideflows Douglas County, WA Grant County, WA

CddHoward Consulting Ltd. Slide 17 Encroachment Grant County WA Rock Island Wanapum Significant Issue for most of the projects Encroachment Model Function of DS elevation and US discharge Example: Wanapum pool encroaches on Rock Island tailwater

CddHoward Consulting Ltd. Slide 18 Environmental Constraints 7ft Higher Pools on LaborDay Weekend 5ft Higher Pools on LaborDay Weekend Increased Min Flows in March and Oct-Nov Increases in Maximum River Stage in the Mid-Mornings of March and Oct-Nov

CddHoward Consulting Ltd. Slide 19 Coordinated Generation Meet time varying load Move water to ‘right’ pool at ‘right’ time Operate plants consistent with Unit Commitment & Dispatch Meet constraints

CddHoward Consulting Ltd. Slide 20 Excel as a Modelling System Data Analysis and Verification Formula Coding Database Coding Spreadsheet Debugging Deployment Easy Tricky Easy Difficult Tricky Basic Optimization

CddHoward Consulting Ltd. Slide 21 Model Validation Switch Model into ‘Simulation Mode’ Historical Discharges drive Model Results create ‘Basis for Comparison’ Historical vs Validation vs Optimized Compare Model Generation and Pool Levels to Measured data.

CddHoward Consulting Ltd. Slide 22 Plant Model Schematic and Modes 7 Dam Cascade Historical System Load Optimize Mode ± 5 MW Optimized Discharge Δ MW Validation Historical Discharge Validation Mode Historical Plant MW Δ

CddHoward Consulting Ltd. Slide 23 Tables for Project Configurations Date & Time Driven Tables for Operational Constraints Hourly-Data Worksheet for the Current Scenario Data and Configuration Project ConfigurationsHourly DataHourly Constraints

CddHoward Consulting Ltd. Slide 24 Scenario and Optimization Control pic – toolbar pic – torn worksheet tabs, stacked

CddHoward Consulting Ltd. Slide 25 Evaluating Results Actual Operations Contain Inconsistent Data Validation is Replicable Validation is the Gold Standard Compare Model to Validation

CddHoward Consulting Ltd. Slide 26 Optimized Hourly Stored Energy

CddHoward Consulting Ltd. Slide 27 Summary 3.5% More System Energy in Sample Scenario Operations Dependant on Load Forecast Excel can be a good Open Platform

CddHoward Consulting Ltd. Slide 28 Thank You!

CddHoward Consulting Ltd. Slide 29 Optimized Hourly Pool Level Changes Scenario 1

CddHoward Consulting Ltd. Slide 30 Optimized Generation Improvements Scenario 1