June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.

Slides:



Advertisements
Similar presentations
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
EIC Workshop 21 May 2008 Experience with high trigger R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division Topics Cebaf’s Large.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
R.S. Slepnev 1, A.V. Daniel 1, M.S. Golovkov 1, V. Chudoba 1,2, A.S. Fomichev 1, A.V. Gorshkov 1, V.A. Gorshkov 1, S.A. Krupko 1, G. Kaminski 1,3, A.S.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
E906/Drell-Yan: Monte Carlo, Data Acquisition and Data Analysis Paul E. Reimer Expected Rates and Monte Carlo (WBS 2.5.1) Data Acquisition (WBS 2.4) –CODA.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
A Tracking Trigger for CLAS12 Mac Mestayer What is a tracking trigger? - “level-1” type, fully pipelined How does it work? - uses FPGA logic - “nearest-neighbor”
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
5 MeV Mott Polarimeter Progress Riad Suleiman April 10, 2012.
Silicon Front End Electronics and Data Acquisition System for PHOBOS experiment at RHIC Pradeep Sarin for PHOBOS Collaboration October Fall 2000.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
August 3, 2005ASI-Praha 2005 Karen Dow Polarized Electron Scattering from Polarized Deuterium at BLAST ASI: SPIN-Praha-2005 Karen Dow MIT Bates Linac.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Analysis of d(e,e’p)n in BLAST Aaron Maschinot Massachusetts Institute of Technology Spin 2004 Conference Trieste, Italy.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
IEEE Real Time 091 Data Acquisition System for Multi-channel Gas Detector Hongyu ZHANG, Kejun ZHU, Haitao ZHU Institute of High Energy Physics,
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Precision Measurement of G E p /G M p with BLAST Chris Crawford MIT Laboratory for Nuclear Science Thesis Committee Review Meeting 2003/12/4.
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Digital Trigger System for the COMPASS Experiment
CLAS12 Forward Tracking: Status and Challenges
R. Alarcon, APFB 2017, August 25-30, Guilin, China
Data Acquisition (DAQ) Status
Hall A Compton Electron detector overview
FORWARD CARRIAGE UPDATE – March-July 2015
The IFR Online Detector Control at the BaBar experiment at SLAC
Example of DAQ Trigger issues for the SoLID experiment
CLAS12 Timing Calibration
Polarized Internal Gas Target in a Strong Toroidal Magnetic Field
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Recent results from BLAST detector
Presentation transcript:

June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition

June 7, 2004Karen Dow The Bates Large Acceptance Spectrometer Toroid End View 8 Coils, Toroidal magnetic field, two sectors instrumented Top View Drift Chambers, Scintillators, Cerenkovs and Neutron Counters (not shown) BLAST is optimized for studying the spin structure of the nucleon and light nuclei, using polarized internal targets and a stored polarized electron beam.

June 7, 2004Karen Dow Detectors 16 Time-of-Flight scintillators with 2 phototubes each: ADC and TDC 4 Cerenkov boxes: ADC and TDC 4 Back Angle Time-of-Flight scintillators (BATs) with 2 phototubes each: ADC and TDC 8 Ohio neutron counters (4m long by 10cm thick) with 2 phototubes each: ADC and TDC 28 LADS neutron Counters (1.8m tall by 15 or 20cm thick) with 2 phototubes each: ADC and TDC Drift chambers with 165 cells of 3 wires each, arranged in 3 chambers of 2 superlayers each (+- 5 degree stereo angle): drift chamber TDC (18 wires per track, nominally) A total of 116 ADC, 116 TDC and 495 drift chamber TDC channels per sector Per Sector:

June 7, 2004Karen Dow A Typical (e,e’p) event

June 7, 2004Karen Dow Electronics Analog splitter for phototube signals with passive delay for ADC CAMAC for the programmable trigger (LeCroy and CAEN) JLab Trigger Supervisor SIS 3801 VME scalers; SIS 3610 input register for target status PEC fixed delay for phototube TDC signals In-house built VME modules for neutron counter discrimination, logic and delay FASTBUS ADCs and TDCs (LeCroy 1881M, 1875A and 1877) LeCroy 1458HP high voltage mainframes

June 7, 2004Karen Dow History of CODA at Bates Design goal for BLAST was to use off-the-shelf components, including DAQ software – less than 1FTE to support DAQ. First used in 1998 with CAMAC for early tests of detector rates with a stored electron beam. CES8210 for VME-CAMAC interface. Triggered on interrupts from LAM in a BiRa LAMPF trigger module. Used in 2000 with one FASTBUS crate and SFI front-panel triggers for tests of BLAST prototype detectors. Used in 2001 in detector test facility to characterize time-of-flight scintillators, Cerenkovs. One FASTBUS crate, SFI front-panel triggers. BLAST commissioning began in 2002 with two FASTBUS crates, Trigger Supervisor. Level 2 trigger implemented fall of Reliably taking production data.

June 7, 2004Karen Dow DAQ Components FASTBUS L MVME162 FASTBUS R MVME162 VME TS MVME162 EB ET VME Scalers MVME162 CES8210 CAMAC Trigger visual_scal trigger gui ER disk dblast07 EPICS server dblast09 Compton Polarimeter dblast13 onlineGui (Root) HV gui (EPICS) elog dblast08 Target Control Beam parameters

June 7, 2004Karen Dow Some Information Event size about 1.6kByte – keep all ADC pedestals for time walk correction on leading edge discriminators. 8 different event types, loosely associated with physics. Some types are heavily prescaled. 4 configurations (level 1 triggers; level 2 triggers; non-strobed mode; cosmics) Level 1 trigger rate about 20 events/mA, running now at a ring fill current of 150mA. Second level trigger based on wire chamber hits takes us down to a bit over 1event/mA. About 15-20% dead at 150mA. Plan to implement buffering in ADCs and TDCs in the next two weeks. Then we expect to have basically no dead time until we hit an event rate of about 330 events/sec, when we hit the Ethernet bandwidth. We don’t anticipate rates that high, so we don’t plan to upgrade to PPCs. Experiment ends 12/04.

June 7, 2004Karen Dow Summary Bates has been working with CODA for 7 years – first with CAMAC, then with FASTBUS. Reliably taking data at 320kB/s (typical), have run as high as 550kB/s. Accomplished with a small manpower investment (about 3 man-years).

June 7, 2004Karen Dow Electronic Logbook – Beginning and End of Run

June 7, 2004Karen Dow onlineGUI for raw data monitoring

June 7, 2004Karen Dow EPICS High Voltage GUI

June 7, 2004Karen Dow Visual Scalers

June 7, 2004Karen Dow Trigger GUI