FOUNDATION ELECTRIC POLES

Slides:



Advertisements
Similar presentations
DECORATIVE SINGLE COAT PLASTER FOR MARBLE CHIPS CLADDING SYSTEM ( PEBBLEDASH )
Advertisements

INAR 243 FLOORS.  Structural element  Proper ground for functions.
PIPE CULVERT By CH. VENKATARAMAIAH.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Carpentry Skilled Trades 1201 Footings and Foundations.
 Low Cost Housing is a new concept which deals with effective budgeting and following of techniques which help in reducing the cost construction through.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
GROUNDWATER CONTROL.
Foundation Systems.
Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Sant Baba Attar Singh Govt. Polytechnic College, Badbar, Barnala Measurements in.
Utility Data Collection and Use for Disaster Response Steve Henderson GIS Coordinator City of Gulf Shores.
Competency: Draw Foundation Plans
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Chapter 19 Floors.
QuickWalls® strong. fast. simple.
COLUMNS.
E4014 Construction Surveying
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Chapter 18 Foundations.
Building Foundations Foundation Walls.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
Sanitary Engineering Lecture 16
CONSTRUCTING A FIVE CABIN LATRINE
GUD AFTNOON. SUBJECT CODE : GE1151 BASIC CIVIL AND MECHANICAL ENGINEERING.
The ground must push up as hard as the building pushes down
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
Sources of water (RAIN)
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }
CAISSON FOUNDATION.
Preparing Foundations for Cylinders & ASME Tanks
MASONRY. Introduction Masonry→ construction of buildings units bonded together with mortar The building units →bricks, stones or precast concrete, Depending.
Gandhinagar Institute of Technology
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
Structures: Design and construction of stream crossings
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
Competency: Design and Draw Foundation Plans
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Arch bridges Arch bridges cannot bend, that is why they are made from many different types of materials such as masonry materials eg. Stone, brick etc.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
5.8: Intermediate Related Rates. Sand is poured on a beach creating a cone whose radius is always equal to twice its height. If the sand is poured at.
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Shelter Cluster Somalia ShelterCluster.org Coordinating Humanitarian Shelter Building Back Safer PILOT PROJECT KISMAAYO 1 Building Back Safer.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Building Materials Architecture Humanities Adkins.
Mahatma Gandhi Institute of Technical Education & Research Centre
PRESENTATION ON RESOURCE EFFICIENT BRICKS & FLY-ASH FILLING IN IIT ROPAR PROJECT by Er. Gopal Varshney S.E., CPWD CPWD, IIT ROPAR, PUNJAB.
5. FERROCEMENT.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
How to Make, Use, and Reuse an Arborloo. Step 1: Make the Concrete Slab Create 1 m Diameter ring of bricks and line with plastic and place brick/bucket.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
BHAGWAN MAHAVIR COLLEGE OF ENGINEERING AND TECHNOLOGY
California Bearing Ratio
Implementing Finishing Job of Building
Prepared By: Alka Shah Civil Engineering Department
Termiticide: Method of Application
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
MATERIALS AND CONSTRUCTION I
Installation And Estimation of Service Connection
Progress Report 11/10/11.
Govt. Polytechnic,Manesar
FBE05 – Mathematics and Statistics
Plain & Reinforced Concrete-1 CE3601
R.G.G.P (NARWANA) Power point presentation of Building construction
Competency: Design and Draw Foundation Plans
Competency: Design and Draw Foundation Plans
Subject: Civil Engineering Material Program : Civil Engineering Year/Part : II/I Class Load : 2 period/week By: Assistant Professor, Er. R.P. Neupane.
Presentation transcript:

FOUNDATION ELECTRIC POLES PRESENTATION

Pole Foundation:- Foundation: Foundation is required to support structure for transmission tower, lighting poles, and transformer erection etc in the field of electrical engineering.

For foundation of single wooden, concrete or steel pole, the pit is excavated to a required depth. Precast concrete poles or steel poles are inserted in the pit. Concrete mixture is poured layer by layer and is rammed every time. Mixture ratio is normally 1:2:4 of cement: san: stone.

Depth for foundation is generally 1/6 Th of the length of pole. Typical depth of foundation pits are as follows:                                  Pole size (meter):  9 10         12        15         18 Depth of foundation: 1.5     1.7          1.8        1.8          2 Depth for foundation is generally 1/6 Th of the length of pole.

Location of poles: Poles are located at least 1.5meter away from fire hydrant, underground cable trench, and 5meter away from road boarder and railway

Height of the pole in distribution system- 10M, 12M, 14M Span of the pole: Residential area: 30 to 50m Rural areas        : 50 to 60m

Foundation for 9 meter street pole :- a)  Lean concrete ratio-1:3:6 (cement: sand: stone) Volume:  0.7X 0.7X0.15 = 0.0735M3 Cement required per M3= 220kg Cement for above volume= 16.17 kg

b)   Pedestal PCC at ratio 1:2:4 Outer dia =0.540M Inner dia= 0.15M Height = 1.5M Volume = π/4 x (D2-d2) x H              = π/4 x (0.542-0.142) x 1.5              = 0.321M3 Cement required for ratio 1:2:4 @ =320kg per M3 For 0.321 M3 volume cement required = 320 x 0.312 = 102.72kg

c)  Copping ratio 1:2:4 Outer dia =0.30M Inner dia= 0.14M Height = 0.3M Volume = 0.021M3- 0.004M3)               = 0.017M3 Total cement consumption per pole =a+b+c = 16.17 +102.72+ 5.44 = 124.33kg

Earth pit chamber: Plaster 1:4 cement =5.47kg/M3 Brick masonry 2x0.6x0.45x0.115=0.062M3                        2x0.3x0.45x0.115=0.031M3                                        -------------                                            0.093M3 Cement consumption: 0.093x95=8.835kgs Plaster 4x0.3x0.45 = 0.54M3             4x0.6x0.1 = 0.24M3             2x0.3x0.15 = 0.09M3                                 ------------                                 1.05x5.47 = 5.749kg Total cement consumption   For one earth pit chamber = 14.58kg

FOUNDATION OF FEEDER PILLAR & TELEPHONE DB 1. Lean concrete: 1:3:6 Cement 0.11x 220kg/M3 2. Brick work = 2x1.0x0.5x0.075= 0.075M3                         2x0.5 x0.35x0.6= 0.21M3                              0.9 x0.5x0.3 = 0.135 ------------------------------------------------- Total                                          =0.42M3 Cement = 0.42x95kg/M3 (1:4 mortar)                  =39.9 kg 3. Plaster 12 mm thick 0.9 x0.3x2 = 0.54M2     Total  = 0.84M2 Cement: =0.84x547kg/100M2                 =4.6kg 4. Neat coat =1.7kg@1.9kg/M2 for area of 0.84M2 Total cement for one foundation = 70kg

Foundation of post top fixture a)      Lean concrete ratio-1:3:6 (cement: sand: stone) Volume:  0.7X 0.7X0.15 = 0.0735M3 Cement required per M3= 220kg Cement for above volume= 16.17 kg b)      Pedestal PCC at ratio 1:2:4 0.5x0.5x0.1 = 0.25M3x320 =80kg Height = 1.5M Cement required for ratio 1:2:4 @ =320kg per M3 c)      Copping ratio 1:2:4  0.3x0.3x0.045x320=14.40kg Total cement consumption per pole =a+b+c = 16.17 +80+ 14.4 = 110.57kg

THANK YOU THE END