Transversity Readiness and Timeline Xiaodong Jiang, March 17th, 2008. This document specifies the overall readiness for Hall A experiments E06-010/E06-011.

Slides:



Advertisements
Similar presentations
Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
Advertisements

Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
G2P Target installation and Beyond. Schedule Pivot before.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Preparation for CERN test beam
CLAS12 Calibration and Commissioning (CALCOM)
Hall A Compton Electron detector overview
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Run Coordinator Report for PVDIS (E08-011)
Polarized 3He target installation
Presentation transcript:

Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E at each stages to serve as a guideline for works from now till Oct. 6th,  Physics production starts (Oct 20). Commissioning (Oct 10-Oct.19). Pre-beam ready (Oct weeks from today). Installation (June 9 -Oct weeks). Pre-installation ready (June 9). BigBite detector test run (late May). Installation for test run+lowQ-ep (May 9-May16). A checklist during π 0 experiment (April 7th-May 7th). Remaining work during π 0 installation (April 6th). Work in the test lab: Cherenkov+BB frame modification (March 24-May 3. 6 weeks left). Work in the target lab (10 weeks left before June 9).

For each sub-system, please address the following: A working system ready by Oct. 6th ? Specify performance (# of p.e. etc.) ? Special need of Hall A technical support. Special safety issues need to be reviewed. A list of minimum tests and a timeline. Any long lead items need to be ordered ? Have spare parts in hand ? On-site manpower. Experts during the run. What if the next deadline is missed ?

Pre-beam Readiness Beamline. Polarized 3 He target and spin-flip. BigBite and shielding. HRS detectors. Trigger and DAQ, coin TOF, scalers. Slow controls. On-line monitoring and replay software. Manpower, RC, shift workers and expert list. Documentations and instructions.

Pre-beam Readiness: Beamline Beam GeV ? ARC energy measurement ready. MCC has automatic procedures for beam current ramp-ups. Compton ready, manpower to run Compton. Beam raster checked. Beam charge monitors calibrated during earlier runs. Moller ready for one-, two- and five-pass beam. BPMs ready, harps checked. OTR (?). Beamline serveyed relative to target cell. Near target shielding pieces in place. Downstream correction coils (hor. and vert.) and controls working. Beam dump viewer checked. Beamloss/Ion-chamber limits set. Happex luminosity monitors working, data in DAQ. Happex beam charge feedback working. Beam helicity in DAQ, scalers checked during earlier runs.

Pre-beam Readiness: pol. 3 He target Target polarization, min. 40%. Spin-flip in automatic mode, signal in DAQ. 10 production cells ready. NMR, EPR working. Water calibrations done. Reference cell ready for 3 He, N 2, H 2 gas. Laser optics ready for Long/Tran/Vert. Target ladder, cell positions aligned. Operation procedures and safety documents. Target operators trained.

Pre-beam: BigBite ch1+ch2+ch3 aligned. Readout ready. Spare preAmp cards tested. Gas Cherenkov beam checked, >8 pe (?) pre-Sh+Sh trigger set. Scin. timing offsets checked. HV, low-V in EPICS data. Remote set/reset. Online display. Shielding pieces in place. Magnet control ready. Read I&B into data. Spare parts in hand. Power, PMT bases etc.

Pre-beam: HRS-L Detectors S2M. Coin. TOF+software. A1. Short Gas Cherenkov. RICH detector and software. Commissioning plan. A list of standard online monitoring plots. A list of experts.

Installation (June 9-Oct. 6) BigBite and shielding HRS detectors Target Beamline Trigger. Coin TOF. DAQ. Controls. Test runs as early as possible. Documentations.

Pre-installation ready (June 6) Hall A floor and cable routes layout. DAQ platform shielding pieces. Downstream side shielding pieces for BigBite. BigBite detector shielding hut. Shielding pieces for BigBite front-end electronics. BigBite platform modifications. Safety procedures and reviews.

Transversity test run+LowQ-ep (late May) Cher.+Ch3+Scin.+presh+shower. Detector/cable map. Debug all channels. First round of pre-sh+sh calibration. Front-end trigger, threshold control. Coin. TOF in e+p, BB+HRS+beam timing. DAQ, scalers and beam helicity sorted. A fake target spin-flip signal into DAQ. Read Lumis into DAQ (?) EPICS data stream, voltage controls. Online software.

Installation plan for May test run Doug Ed+Jack.

A checklist before May test run At the end of the meeting.

A Checklist before π 0 (April 7) BigBite fits to 30 o, 1.5m drift with the magnetic shielding piece (?) Identify all major hardware interferences for transversity (done ?) Cable layout. Delay+signal+HV cables ready. Spare cables in place. Beam helicity+sorted scalers for BB. Front-end electronics in the hall. BB detector shielding blocks in the hall.

Work in the test lab (March 24 – May 3) Remove ch3. Fix broken wire. Modification of the detector frame. Gas Cherenkov mirror aligned, assembled, cosmic-ray checked. Ch3 back into the frame. Short cables+read out cards checked. Gas Cherenkov box leak-tight, mounted into the new frame, gas system ready.

Work in the target lab (before June-9). !!! Work list details (J.-P.) !!! Followed by installation schedule. A list of minimum tests.

Logistic supports for transversity JLab documents (RSAD, ESAD, safety). A Wiki page for most technical details. Online instructions, shift howto. Run coordinators, shift sign-up. Shift worker training documents. Shift checklist, run sheet. Scripts for good runs, beam charge, #-evt.