THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

Abstract Real-time images of Earths space environment from NASAs IMAGE satellite will soon be available on the NOAA Space Environment Center Web site.
A new Network Concept for transporting and storing digital video…………
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
IPY Expression of Intent #422 Interhemispheric Study on Conjugacy and Non- conjugacy of Auroral and Polar Ionospheric Disturbances using Ground-based.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB.
The Upgraded and Expanded CARISMA Magnetometer Array: New Pi1 Substorm Science Capabilities I.J. Rae, Ian R. Mann (PI), K. Murphy, David K. Milling (PM),
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 Data Retrieval and Software.
THEMIS/GBO Engineering Peer Review CTR - 1 UCB, Oct 17, 2003 GBO/EPO Magnetometers: Overview C. T. Russell.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
SCIENTIST WORK STATIONS Advanced display tools will build on current software to allow for integrated displays of data from onboard instrumentation (e.g.,
PHEOS PSRR PSRR Objectives: Show that all system requirements have been defined and are traceable to top level science objectives. Further, all requirements.
ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
Wilga 2007 π of the Sky Full π system and simulation Janusz Użycki Faculty of Physics Warsaw University of Technology.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations.
Fall AGU 2005 Magnetic data in the classroom using a sustainable Education and Outreach program L. M. Peticolas 1, N. Craig 1, S. Odenwald 2, and A. Walker.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
Status Report on Advanced Mesospheric Temperature Mapper Activities at ALOMAR Mike Taylor, P.-Dominique Pautet Utah State University ASAC Meeting - Hamburg,
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
Instrument Performance Spefication 13 July 2001 SECCHI Consortium Meeting Cosner’s House, Abington Dan Moses.
Risk Management. What we offer? We provide IP video monitoring solutions for safety and security through our systems integration capabilities.
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
S. Frey et.al., THEMIS Ground-Based Observatory Analysis 1 San Francisco, Fall AGU, December 16, 2004 Analysis Used predicted THEMIS spacecraft positions.
788.11J Presentation “Deploying a Wireless Sensor Network on an Active Volcano” Presented by Ahmed Farouk Ibrahim Gaffer.
8/6/07 THEMIS GBO 1 Ground Based Observatory Network operation and first results. Stephen B. Mende and the THEMIS GBO team UC Berkeley, U of Calgary, UCLA,
Distributed Radar Networks Ray Greenwald JHU/APL.
Data Service at the World Data Center for Geomagnetism, Kyoto T. Iyemori, M. Takeda, M. Nose and Y. Odagi World Data Center for Geomagnetism, Kyoto Graduate.
Fall AGU 2005 Magnetic data in the classroom using a sustainable Education and Outreach program L. M. Peticolas 1, N. Craig 1, S. Odenwald 2, and A. Walker.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
THEMIS/GBO CDR Peer Review THEMIS – A Canadian Perspective Eric Donovan – University of Calgary April 26, 2004.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
THEMIS data on the web in science classrooms L. M. Peticolas and N. Craig URL: THEMIS: A Quest to Understand the Onset.
1 Access and Use of Auroral Imaging Data Harald U. Frey Space Sciences Laboratory University of California at Berkeley Credit: D. Hutchinson.
ICS VIII Banff Canada March 27-31, 2006 To be convened by Eric Donovan & John Samson Shameless focus on THEMIS! To be held at the Banff Center Webpage.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
ICALEPCS 2005 Geneva, Oct. 12 The ALMA Telescope Control SystemA. Farris The ALMA Telescope Control System Allen Farris Ralph Marson Jeff Kern National.
THEMIS/GBO Review 1 Banff, March 29, 2006 Ground Based Observatories (GBO) System Design Overview Operational Status Lessons Learned S. E. Harris University.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
THEMIS/GBO Site Tour 1 January 2006 Ground Based Observatories (GBO) Tour of Current Sites (Jan ‘06) Stewart Harris.
Status of Cloud Cameras Roger Clay, Paul Davidson, Bruce Dawson, Andrew Smith and Neville Wild University of Adelaide Malargue, 11 November 2002.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, E. Donovan 2, S.B. Mende 1, E. Spanswick 2 1 SSL, University of California,
THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, and E. Donovan 1 University of California, Berkeley 2 University of.
THEMIS/ GBO SciRR splinter 1 UCB/SSL, 06/02/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB _101220_ATHA.
THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)
ISUAL Design Concept S. Mende. SDR 7 Jun NCKU UCB Tohoku ISUAL Design Concept S. Mende Sprite Example Sprite Image obtained by Berkeley/NCKU 1999.
THEMIS Prototype Imager [ initial field testing ].
Canadian Magnetometry for THEMIS: CANOPUS Magnetometer Array Update Ian R. Mann, D.K. Milling, A. Kale, I.J. Rae, T.M. Loto’aniu Dept. of Physics, University.
GOES Data Status Mutual Benefits of NASA THEMIS and NOAA GOES
Nat 4/5 Computing Science Interfaces
From LSE-30: Observatory System Spec.
UCLA Support for THEMIS
The Instruments Faraday Cup CfA/U of Mich & MIT
TEMPO Instrument Update
ISUAL Imager Stewart Harris.
Canadian Ground-Based Optical Programs
Site Monitoring Requirements
THEMIS program: an Overview
Launch and On-orbit Checkout
HMI Top Level Requirements
Presentation transcript:

THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review

THEMIS/GBO 2 Banff, March 29, 2006 Ground Based Observatories (GBO) Requirements and overview H. U. Frey University of California - Berkeley

THEMIS/GBO 3 Banff, March 29, 2006 GBO Team Institutions University of California – Berkeley (UCB) S. B. Mende – GBO science lead Provides ASI development, system engineering, GBO system fabrication and construction, data archive and dissemination, deployment of 4 stations in Alaska University of California – Los Angeles (UCLA) C. T. Russell – magnetometer science lead Develop and provide ground magnetometer and GPS for GBO / EPO University of Calgary E. Donovan – Canadian science lead Providing GBO system deployment (16 stations) in Canada, field management, data collection, development participation University of Alberta I. Mann – magnetometer scientist Providing access to Canadian magnetometer network

THEMIS/GBO 4 Banff, March 29, 2006 GBO Site Locations IMAGE FUV substorm onset identification Of 1173 events indicated within GBO longitude sector, 2% are outside the FoV of all- sky cameras

THEMIS/GBO 5 Banff, March 29, 2006 Examples of collected data

THEMIS/GBO 6 Banff, March 29, 2006 GBO Science Objective GBO shall monitor the auroral light and ionospheric currents across North America in order to localize the time, location, and evolution of the auroral manifestation of the substorm. Themis mission requirement relating to GBO: Determine substorm onset time and onset meridian magnetic local time (MLT) using All Sky Imagers (one ASI per MLT hr) and Ground Magnetometers (two GMAG per MLT hr) with t_res<30s and dMLT<1° respectively, in an 8hr geographic local time sector in North America.

THEMIS/GBO 7 Banff, March 29, 2006 GBO Derived Requirements

THEMIS/GBO 8 Banff, March 29, 2006 ASI Requirements REQUIREMENTSYSTEM DESIGN GB.ASI-1: FOV. The field of view of the ASI shall be greater than 170°, full angle. Compliance. Yes GB.ASI-2: Exposure Time. Shall have an exposure duration that is programmable with a maximum exposure duration of no less than 1 second. Compliance. Yes GB.ASI-3: Spectral Response. Within passband of 400 to 700nm, shall provide detectable response when stimulated with a source radiance less than 10kRayleigh, at maximum specified exposure duration. Compliance. Expect minimum sensitivity < 1kR (5:1 SNR) GB.ASI-4: Spatial Resolution. Shall provide aurora onset localization with accuracy better than 100km (dMLT< 1°) Compliance. Raw ASI image will have > 250 pixel resolution per image diameter. Thumbnails will have 0.5° binning. GB.ASI-5: Viewport. Shall have heated dome viewportCompliance. Yes GB.ASI-6: Cadence Shall have a programmable repetition interval, minimum interval of no less than 10 seconds Compliance. Running at 3s since February.

THEMIS/GBO 9 Banff, March 29, 2006 Magnetometer Requirements REQUIREMENTSYSTEM DESIGN GB.GMAG-1: Timing. The time accuracy shall be better than 0.5 sec. Compliance. Yes, 1msec with GPS. GB.GMAG-2: Sampling. Shall have a sampling rate of better than 1 second. Compliance. Yes, 0.5 sec. GB.GMAG-3: Sensitivity. Shall be better than 1 nT.Compliance. Yes, 0.1 nT.

THEMIS/GBO 10 Banff, March 29, 2006 Observatory Requirements REQUIREMENTSYSTEM DESIGN GB.OBS-1: Shall provide unattended operation of instruments, data acquisition and storage for up to 4 months per observation season Compliance. Will operate for 12 months/yr GB.OBS-2: Shall provide interface to enable periodic upload of new observation parameters and operating software. Compliance. Internet connectivity provides secure login and file transfer GB.OBS-3: Shall provide digital interfaces and digital data storage for the ASI and GMAG. Compliance. Linux OS supports serial, USB, 10BaseT, etc. GB.OBS-4: Shall provide a GPS receiver for geographic position calibration and time stamp Compliance. GPS included in GMAG subsystem, provides better than 50ms accuracy. Synchronous image acquisition. GB.OBS-5: Shall provide a means for daily uplink of Level 1 (compressed) data, at least 3MB/day Compliance. Satellite Internet connection has demonstrated 10kbps sustained uplink. Provides > 100MB/day GB.OBS-6: Observatory shall store high resolution, Level 0 data locally on hard drives, at least 24GB/month Compliance. USB (or Firewire) drives, 80GB to 120GB, will be periodically swapped by site custodian. Selective transfer of high res. data via Internet is also planned GB.OBS-7: Observatory shall be compatible with locally provided power Compliance. 120 VAC, 60Hz, 10A service, backed up by UPS. UPS sized for 1 hour battery operation (excl heaters) GB.OBS-8: Shall provide controlled power-up and power- down of instruments and system computer automatically Compliance. System power and shutdown/re-boot sequencing controlled by independent control processor GB.OBS-9: Operate in external ambient temperatures range from -50° to +40°C Compliance. Enclosures, insulation, heaters and control designed to keep internal temperatures at 20º ± 10º C GB.OBS-10: Shall survive transport to site and provide stable mounting at the site Compliance. Yes

THEMIS/GBO 11 Banff, March 29, 2006 Ground Site Requirements REQUIREMENTSYSTEM DESIGN GB.GS-1: GBO sites shall provide largely unobstructed viewing over 160° hemisphere. Compliance. Site selection criteria GB.GS-2: GBO sites shall be reasonably clear of local magnetic interference. Compliance. Site selection criteria GB.GS-3: Each GBO site shall provide power, 120 VAC, single phase, 60Hz, at least 10A service Compliance. Site selection criteria GB.GS-4: Each GBO site shall have a local custodian available for periodic maintenance and Level 0 data retrieval Compliance. Site selection criteria