Presentation is loading. Please wait.

Presentation is loading. Please wait.

THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.

Similar presentations


Presentation on theme: "THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende."— Presentation transcript:

1 THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende

2 THEMI GBO meeting 2 UCB 06/02/2003 Ground Based Observatories THEMIS GBO heritage IMAGE satellite FUV imager system; ROCSAT-2 ISUAL imager; NSF’s Automatic Geophysical Observatories ( All Sky Imagers in Antarctica) IMAGE FUV ISUAL PENGUIN-ASI

3 THEMI GBO meeting 3 UCB 06/02/2003 Each GBO has an all sky imager (ASI) and -as necessary- a ground magnetometer (GMAG). Sites have existing infrastructure (some have GMAGs). GBOs cover North American sector. GBOs satisfy L1 requirements of t-res ( 8GLT) with high margins (>2). Supplemented by existing Canadian & Alaskan magnetometers (denser coverage) and intl. networks (extended MLT coverage). 20 GBO sites in Canada and Alaska. 10 Education and Public Outreach ground magnetometers (EPO/GMAGs) in the US, under EPO program mngt. GBOs: A synoptic view of the aurora

4 THEMI GBO meeting 4 UCB 06/02/2003 GBOs: A synoptic view of the aurora Global auroral image taken by IMAGE WIC. Proposed THEMIS ground sites.

5 THEMI GBO meeting 5 UCB 06/02/2003 GBOs: A synoptic view of the aurora

6 THEMI GBO meeting 6 UCB 06/02/2003 Environmental protection/deployment and automation drawn from AGOs (flawless multi-year operation in Antarctica). Prototype camera field tested in Canada – High cadence, high sensitivity – 1.8Mbits/s taking 3s images GBO/ASIs: Based on AGOs

7 THEMI GBO meeting 7 UCB 06/02/2003 Primary science data daily via VSAT Stream #1 (1.4kbps) Monthly backups via disk swapping Stream #2 (180 kbps)

8 THEMI GBO meeting 8 UCB 06/02/2003

9 THEMI GBO meeting 9 UCB 06/02/2003 Ground Based Observatories S. Mende, UCB GBO management GBO I&T Data dissemination Ground Based Observatories S. Mende, UCB GBO management GBO I&T Data dissemination ASIs S. Mende, UCB ASIs S. Mende, UCB Install/Maintain/Retrieve E. Dovovan, UC Install/Maintain/Retrieve E. Dovovan, UC GBO-GMAGs C. T. Russell, UCLA GBO-GMAGs C. T. Russell, UCLA EPO Officer N. Craig, UCB EPO Officer N. Craig, UCB EPO-GMAGs C. T. Russell, UCLA EPO-GMAGs C. T. Russell, UCLA GBO team roles based on heritage Common I&T at UCB before shipment to sites ASIs, the largest part of effort (UCB) GBO-GMAG (UCLA) boards plug into computer in common housing Fielding in Canada and logistical support is Canadian responsibility Alaskan sites is UCB responsibility EPO-GMAGs (copy of existing units) under EPO management


Download ppt "THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende."

Similar presentations


Ads by Google