October2015. 4 E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Design-Build at CDOT Minnesota Design-Build Workshop November 30, 2000.
Omega & Associates Engineering Ltd. Chilliwack Providing professional services to our clients with quality, cost effective AND innovative engineering solutions.
Drinking Water on Statia No Permanent Sweet Water Sources: Collecting and Storing Rain water Wells (Brackish)
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
ReformsTargetMilestones / Activities achieved, since start of JNNURM e-Governance Property Tax Accounting Water Supply & other utilities. Birth/Death.
ICPI Update SEPT Meeting May Segmental Pavement Sales Pavers, Permeable Pavers, Paving Slabs Millions of Square Meters.
PLAN FOR SEPTAGE MANGEMENT UNDER AGARTALA MUNICIPAL COUNCIL BY MILIND RAMTEKE, IAS CHIEF EXECUTIVE OFFICER AGARTALA MUNICIPAL COUNCIL AGARTALA, TRIPURA.
HUNTINGTON CREEK RECOVERY PROJECT. On June 26, 2012 a lightning strike started the Seeley Fire in Emery County. The fire burned 48,050 acres, of which.
Vineyard Planting in Sonoma County Nick Frey Sonoma County Winegrape Commission.
V-Con is an European co-funded project aiming for development of open BIM/GIS/SE solutions in the civil infrastructure sector with a focus.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
RAINWATER HARVESTING IN THE HOSPITALITY SECTOR
Sanitary Engineering Lecture 16
Civil engineering branches & scopes
Population: 2.3 mil. (1995 projected) Area: 113 sq. kms. Density / Sq.km.: 20,353 persons Percentage of Slum dwellers: 40.39% Municipality setup in: 1852.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
FERNS PARADISE AGM July 15th, 2012 Presentation By Management committee 1AGM, July 15th, 2012.
Water, Sanitation, and Development in Belize.
1 Environmental Sustainability: Need for Action – BEL Perspective Rajiv Mohan Rao, Bharat Electronics.
21 st Sep Election Process July & August
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
NWSP 2009 – Rainwater Harvesters. Other resources of fresh water Scarcity of water.
Flood Prevention Measures The first six months of 2013 have seen a significant increase in flooding of both tertiary and machine installation. The following.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
Reed Contracting Concrete Plant (ALG active) November 8, 2012 Madison County Karl M. Ryan, inspector 1.
June Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.
REAL ESTATE SCENARIO IN NORTH BANGALORE REAL ESTATE SCENARIO IN NORTH BANGALORE.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE April 2017.
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
ELCITA UPDATE January 2017.
CITY OF NORFOLK, NEBRASKA
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
ELCITA Update May 2016.
ELCITA Update April 2016.
SKYWARDS TECH PARK.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
ELCITA UPDATE August 2016.
Various Fields in Civil Engineering By R.Janani
ELCITA UPDATE November 2017.
ELCITA Update March 2016.
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
2 Days National Workshop on “National Building Code of India 2016 ”
ELCITA Update January 2016.
ELCITA UPDATE September 2016.
Water Types of water Sewer systems TCU/VIA 6th semester workshop
Richland Creek Water Supply Program Program Update
ELCITA UPDATE June 2019.
ELCITA UPDATE August 2019.
ELCITA UPDATE April
Presentation transcript:

October2015

4 E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published Estate survey Contract Awarded work will be started during this month. Improvement of road geometry at WIPRO junction Shifting of RMU’s under progress.

3 Rain Water Harvesting Tank - Completed

4 Permanent Works - Under Progres WIPRO Neeladri RoadTessolve/ Edizi Tools Road

5 Permanent Works - Under Progres C-Dot D-Mart RoadAlong KFC/Svenska

6 Permanent Works - Under Progres IIITB EntranceKSSIDC Complex

7 Road Maintenance Work– Completed

8 Road Maintenance Work - Under Progres HP Avenue Road Widening Pot Holes Filling

9 Maintenance – Under Progress

10 20 feet deep well Rainwater Harvesting Pit at Various locations Maintenance works – Under Progress

11 Construction of 300KLD Conventional STP in ELCIA Park. Total Project Cost - Rs. 75,72,798/- (Including Civil & STP works) Permanent Works – Under Progress

12 Tender Published Providing UGD System to connect 300KLD STP, Electronics City Phase 1, Bangalore Finalising Technology, Design, Establishment and Commissioning of 400 KLD Sewage Treatment Plant at Electronics City, Including Operation and Maintenance of the Treatment Plant for a Period of ONE (1) year. Finalising Technology, Design, Establishment and Commissioning of 1 MLD Capacity Sewage Treatment Plant at Electronics City, Including Operation and Maintenance of the Treatment Plant for a Period of ONE (1) year.

13 Contracts Awarded Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs Quasitum Road Bhavani Industries Road Providing and laying of Asphalting using 60/70 grade bitumen from C-DOT to D-Mart Road Junction Wipro Avenue 4th cross to Wipro Avenue 5th cross road via Y-junction Wipro gate 5 to Wipro gate 6 Haritha IT/Fire Station Road Proposal for property inventory, asset management and development of web based e-governance GIS application software

14 Contracts on Anvil Providing and laying of Asphalting using 60/70 grade bitumen from Fire station to Canara bank road Junction Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road Fire Station to Canara Bank Junction Radel Industries Road

Thank You